Solicitation
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
RFP-376508-CD
Department of Energy, Fermilab - DOE Contractor. Industrial Building Construction.
Offers due
December 17, 2026 at 5:00 PM EST
22 days from now. Posted November 19, 2026, first published September 17, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATIONSolicitationNAICS 23822Batavia, IL378854_MRCloses in 8 daysDec 3
- UTILITY EXCAVATION AND REPAIR SERVICES IDIQSolicitationSmall businessNAICS 238910Batavia, IL385439GMKCloses in 12 daysDec 7
- Request for Information - Vacuum VesselsPresolicitationNAICS 332710Batavia, ILRFIVacuumVesselsCloses in 12 daysDec 7
Similar, open now
- IE181 - WHS Greenhouse Construction
Bureau of Indian Affairs, Indian Education Acquisition Office
SolicitationIndian small businessNAICS 236210Fort Wingate, NM140A2327Q0297Due in 5 daysNov 30 - Multiple Award Construction Contract (MACC)
Department of the Air Force, FA7060 11TH Contracting SQ PK
Sources soughtNAICS 236210District of ColumbiaFA706027RXXX2Due in 5 daysNov 30 - Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Department of the Air Force, FA8137 AFSC Pzioc
Closes in 8 daysDec 3
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. To compete, read the solicitation and its attachments, send questions to the contact named on the notice in writing, and submit the offer the way the solicitation says before the deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236210 (industrial building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders have 91 days from the day the solicitation was posted, September 17, 2026, to the deadline. The deadline moved once: it was first November 17, 2026 and is now December 17, 2026.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
On November 19, 2026, Amendment No. 4 was issued to provide responses to questioins received from prospective offerors, Replace Exhibts G, L, and M with Revised Exhibits, provide informational documents, and add additional site visit dates.
On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026.
On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1.
On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.
This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.
The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.
The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.
This project includes the following milestones:
Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.
Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin.
Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete.
Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete.
Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf747 KB, September 17, 2026
- Exhibit Q- Davis Bacon Wage Rate.pdf482 KB, September 17, 2026
- Exhibit P- Performance Bond_FL-40.pdf743 KB, September 17, 2026
- Exhibit O- FL-42 (Rev 1.25) - Payment Bond.pdf1.6 MB, September 17, 2026
- Exhibit N- Bond Bid FL-41.pdf749 KB, September 17, 2026
- Exhibit M- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf476 KB, September 17, 2026
- Exhibit L- Subcontractor Annual RepsCerts-SARC. Rev 8.pdf476 KB, September 17, 2026
- Exhibit K- Price Proposal Form.pdf734 KB, September 17, 2026
- Exhibit J - Fermilab Subcontractor Safety Information Questionnaire.pdf1.4 MB, September 17, 2026
- Exhibit I - Statement of Acknowledgment (SF-1413).pdf699 KB, September 17, 2026
- Exhibit H - Construction Insurance Requirements.pdf245 KB, September 17, 2026
- Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf320 KB, September 17, 2026
- Exhibit F- Army Corp NPR-Letter.pdf158 KB, September 17, 2026
- Exhibit E- Electrical (LV) Calculations.pdf347 KB, September 17, 2026
- Exhibit D- Geotechnical Engineering Report.pdf36.9 MB, September 17, 2026
- Exhibit C- Specification Set- New CHW Plant and CUB Upgrades.pdf28.7 MB, September 17, 2026
- Exhibit B- Construction Drawing Set.pdf105.5 MB, September 17, 2026
- Exhibit A - Scope of Work UIP SP-1 CUB.pdf252 KB, September 17, 2026
- 1.0 RFP 376508-CD Instructions to Offerors.pdf310 KB, September 17, 2026
- Amend 01 to RFP 376508-CD.pdf159 KB, October 6, 2026
- Amend 02 to RFP 376508-CD.pdf124 KB, October 7, 2026
- Amend 03 Transformer Pics.zip2.6 MB, October 30, 2026
- Amend 03 Submittal for DHP-CU-1.pdf630 KB, October 30, 2026
- Amend 03 CUB Electrical Upgrade As-Builts.pdf16.9 MB, October 30, 2026
- Amend 03 CUB Original As-Built Drawings.pdf20.0 MB, October 30, 2026
- Amend 03 to RFP 376508-CD.pdf180 KB, October 30, 2026
- Amend 04 to RFP 376508-CD.pdf2.3 MB, November 19, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 17, 2026
Solicitation
Due November 17, 2026 at 5:00 PM EST. SAM.gov, notice b3e96254b8dc47f48e58f2821e5100ad
1 revision on SAM
- September 17, 2026: publish, solicitation
October 6, 2026
Solicitation
Due November 17, 2026 at 5:00 PM EST. SAM.gov, notice d285489a5ca44b42a999bc943cc821cb
3 revisions on SAM
- October 7, 2026: publish, solicitation
- October 6, 2026: publish, solicitation
- September 17, 2026: publish, solicitation
October 7, 2026
Solicitation
Due November 17, 2026 at 5:00 PM EST. SAM.gov, notice 14034cd5817d49c38056351ef936d097
3 revisions on SAM
- October 7, 2026: publish, solicitation
- October 6, 2026: publish, solicitation
- September 17, 2026: publish, solicitation
October 30, 2026
Solicitation
Due December 17, 2026 at 5:00 PM EST. SAM.gov, notice 4e7d0c4832764a279ed8191c8f4e789d
4 revisions on SAM
- October 30, 2026: publish, solicitation
- October 7, 2026: publish, solicitation
- October 6, 2026: publish, solicitation
- September 17, 2026: publish, solicitation
November 19, 2026
Solicitation
Due December 17, 2026 at 5:00 PM EST. SAM.gov, notice 081a16b3cb52439ea797d5ed0cf3ac6b
5 revisions on SAM
- November 19, 2026: publish, solicitation
- October 30, 2026: publish, solicitation
- October 7, 2026: publish, solicitation
- October 6, 2026: publish, solicitation
- September 17, 2026: publish, solicitation