# Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Canonical: https://sealedbidder.com/opportunities/rfp376508cd

- Solicitation number: RFP-376508-CD
- Notice type: Solicitation
- Status: Open. Offers due December 17, 2026 at 5:00 PM EST
- Department: Department of Energy
- Contracting office: Fermilab - DOE Contractor (899034)
- NAICS: 236210 Industrial Building Construction
- Product or service code: Z2EZ Repair Or Alteration Of Other Industrial Buildings
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236210)
- Place of performance: Batavia, Illinois
- County: Kane County (FIPS 17089). https://sealedbidder.com/counties/kane-county-il-17089
- City: Batavia. https://sealedbidder.com/cities/batavia-il-1704078
- First posted: September 17, 2026
- Last posted: November 19, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/081a16b3cb52439ea797d5ed0cf3ac6b/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. To compete, read the solicitation and its attachments, send questions to the contact named on the notice in writing, and submit the offer the way the solicitation says before the deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236210 (industrial building construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders have 91 days from the day the solicitation was posted, September 17, 2026, to the deadline. The deadline moved once: it was first November 17, 2026 and is now December 17, 2026.

## Description

On November 19, 2026, Amendment No. 4 was issued to  provide responses to questioins received from prospective offerors, Replace Exhibts G, L, and M with Revised Exhibits, provide informational documents, and add additional site visit dates.

On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026.

On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment  No. 1.

On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.

This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab&rsquo;s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.

The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.

The critical schedule constraint for construction of this project is Fermilab&rsquo;s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.  The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.

This project includes the following milestones:

Milestone 1 &ndash; Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.

Milestone 2 &ndash; 3rd January 2028; This milestone marks the point where construction work may begin.

Milestone 3 &ndash; 31st January 2029; AUP 1 CUB Extension complete.

Milestone 4 &ndash; 29th June 2029; AUP 2 Existing CUB Upgrade complete.

Milestone 5 &ndash; 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

## Attachments

- [Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ac12ffbcb3b44dfba83c2f983488b5e5/download)
- [Exhibit Q- Davis Bacon Wage Rate.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/007db4985f654d0aa794f06615feed01/download)
- [Exhibit P- Performance Bond_FL-40.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a979179672fd48d7945ea3baf6e03399/download)
- [Exhibit O- FL-42 (Rev 1.25) - Payment Bond.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7ff4e3e7bb684812b8c4c23537b85f59/download)
- [Exhibit N- Bond Bid FL-41.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c866ee56e34c4abead943e00e7a3869a/download)
- [Exhibit M- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f5343a9f2bc64071bcdd2c16898a07aa/download)
- [Exhibit L- Subcontractor Annual RepsCerts-SARC. Rev 8.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3a621df5a94b4c19b233894dc06b7de3/download)
- [Exhibit K- Price Proposal Form.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/233504068a584b20b46b7bd9b7a62c97/download)
- [Exhibit J - Fermilab Subcontractor Safety Information Questionnaire.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cc05d3720012421386dd97c265bf18fc/download)
- [Exhibit I - Statement of Acknowledgment (SF-1413).pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/46d23fc0ceea44d9ae0a656ac7df25d0/download)
- [Exhibit H - Construction Insurance Requirements.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/01a039a1596e45c195992b6dbde706b2/download)
- [Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ae74e3cd4348426e87459023c2304ec9/download)
- [Exhibit F- Army Corp NPR-Letter.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/50e14e5486b74fbfa1ef68395010b31a/download)
- [Exhibit E- Electrical (LV) Calculations.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/269125e345964d4fae2fd0aa7f17b38f/download)
- [Exhibit D- Geotechnical Engineering Report.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/28bd9d5e544746a182817e653b271c4d/download)
- [Exhibit C- Specification Set- New CHW Plant and CUB Upgrades.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b94d9198b39b4362bd2e178eab3099f4/download)
- [Exhibit B- Construction Drawing Set.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b58630311a4b452282ad61645ffc55ae/download)
- [Exhibit A - Scope of Work UIP SP-1 CUB.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/de7e2a34012e4d078fb99de53df7235f/download)
- [1.0 RFP 376508-CD Instructions to Offerors.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d6b3d3c89dc1436f811844cec5c8846c/download)
- [Amend 01 to RFP 376508-CD.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e7545032fedb4f43aa15d47b0c840414/download)
- [Amend 02 to RFP 376508-CD.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/807284e332a543dead3f2cbc06a2d28d/download)
- [Amend 03 Transformer Pics.zip](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2af6cf8aefd64864910cd08b2afabaf8/download)
- [Amend 03 Submittal for DHP-CU-1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/eae8fa8b600f4837826ef5c1793c7fb1/download)
- [Amend 03 CUB Electrical Upgrade As-Builts.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/724784027e8a4372bbaaf469014abbc7/download)
- [Amend 03 CUB Original As-Built Drawings.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f2846cd3403543beb88968b910ac6249/download)
- [Amend 03 to RFP 376508-CD.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8ab9f729ce47420e980224fe2d9f1e03/download)
- [Amend 04 to RFP 376508-CD.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c92f959826f84da1b58592c5865b724e/download)

## Open now in the same industry

5 open in NAICS 236210.

- IE181 - WHS Greenhouse Construction (140A2327Q0297), due November 30, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/140a2327q0297
- Multiple Award Construction Contract (MACC) (FA706027RXXX2), due November 30, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/fa706027rxxx2
- Tinker AFB 2026 Multiple Award Construction Contract (MACC) (FA8137-26-R-0040), due December 3, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/fa813726r0040

## Publications

- September 17, 2026: Solicitation, due November 17, 2026 at 5:00 PM EST. Notice b3e96254b8dc47f48e58f2821e5100ad. https://sam.gov/workspace/contract/opp/b3e96254b8dc47f48e58f2821e5100ad/view
- October 6, 2026: Solicitation, due November 17, 2026 at 5:00 PM EST. Notice d285489a5ca44b42a999bc943cc821cb. https://sam.gov/workspace/contract/opp/d285489a5ca44b42a999bc943cc821cb/view
- October 7, 2026: Solicitation, due November 17, 2026 at 5:00 PM EST. Notice 14034cd5817d49c38056351ef936d097. https://sam.gov/workspace/contract/opp/14034cd5817d49c38056351ef936d097/view
- October 30, 2026: Solicitation, due December 17, 2026 at 5:00 PM EST. Notice 4e7d0c4832764a279ed8191c8f4e789d. https://sam.gov/workspace/contract/opp/4e7d0c4832764a279ed8191c8f4e789d/view
- November 19, 2026: Solicitation, due December 17, 2026 at 5:00 PM EST. Notice 081a16b3cb52439ea797d5ed0cf3ac6b. https://sam.gov/workspace/contract/opp/081a16b3cb52439ea797d5ed0cf3ac6b/view

## Points of contact

- Chris Daley, cdaley@fnal.gov, 6308404256

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/rfp376508cd.
