{"canonical":"https://sealedbidder.com/opportunities/rfp376508cd","key":"RFP376508CD","url":"https://sealedbidder.com/opportunities/rfp376508cd","title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","solicitation_number":"RFP-376508-CD","notice_type":"o","open":true,"removed":false,"removed_at":null,"response_deadline":"2026-12-17T22:00:00Z","first_posted":"2026-09-17","last_posted":"2026-11-19","department":"ENERGY, DEPARTMENT OF","subagency":"ENERGY, DEPARTMENT OF","office":"FERMILAB - DOE CONTRACTOR","naics":"236210","psc":"Z2EZ","set_aside":null,"place_state":"IL","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"17089","place_county_name":"Kane County","place_city":"1704078","place_city_name":"Batavia","winner":null,"award_amount":null,"publications":[{"notice_id":"b3e96254b8dc47f48e58f2821e5100ad","title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","solicitation_number":"RFP-376508-CD","notice_type":"o","base_type":"o","posted":"2026-09-17","posted_at":"2026-09-17T14:49:18.407Z","due_at":"2026-11-17T22:00:00Z","due_date":"2026-11-17","cancelled":null,"archived":null,"archive_date":"2026-12-02","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b3e96254b8dc47f48e58f2821e5100ad/view","enriched":true,"history":[{"index":1,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T14:49:18.407Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad","solicitation_number":"RFP-376508-CD"}]},{"notice_id":"d285489a5ca44b42a999bc943cc821cb","title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","solicitation_number":"RFP-376508-CD","notice_type":"o","base_type":"o","posted":"2026-10-06","posted_at":"2026-10-06T21:00:29.017Z","due_at":"2026-11-17T22:00:00Z","due_date":"2026-11-17","cancelled":false,"archived":false,"archive_date":"2026-12-02","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d285489a5ca44b42a999bc943cc821cb/view","enriched":true,"history":[{"index":3,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-07T14:06:55.561Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"14034cd5817d49c38056351ef936d097","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":2,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T21:00:29.017Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d285489a5ca44b42a999bc943cc821cb","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":1,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T14:49:18.407Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad","solicitation_number":"RFP-376508-CD"}]},{"notice_id":"14034cd5817d49c38056351ef936d097","title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","solicitation_number":"RFP-376508-CD","notice_type":"o","base_type":"o","posted":"2026-10-07","posted_at":"2026-10-07T14:06:55.561Z","due_at":"2026-11-17T22:00:00Z","due_date":"2026-11-17","cancelled":false,"archived":false,"archive_date":"2026-12-02","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/14034cd5817d49c38056351ef936d097/view","enriched":true,"history":[{"index":3,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-07T14:06:55.561Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"14034cd5817d49c38056351ef936d097","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":2,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T21:00:29.017Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d285489a5ca44b42a999bc943cc821cb","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":1,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T14:49:18.407Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad","solicitation_number":"RFP-376508-CD"}]},{"notice_id":"4e7d0c4832764a279ed8191c8f4e789d","title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","solicitation_number":"RFP-376508-CD","notice_type":"o","base_type":"o","posted":"2026-10-30","posted_at":"2026-10-30T18:48:02.093Z","due_at":"2026-12-17T22:00:00Z","due_date":"2026-12-17","cancelled":false,"archived":false,"archive_date":"2027-01-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4e7d0c4832764a279ed8191c8f4e789d/view","enriched":true,"history":[{"index":4,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-30T18:48:02.093Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e7d0c4832764a279ed8191c8f4e789d","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":3,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-07T14:06:55.561Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"14034cd5817d49c38056351ef936d097","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":2,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T21:00:29.017Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d285489a5ca44b42a999bc943cc821cb","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":1,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T14:49:18.407Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad","solicitation_number":"RFP-376508-CD"}]},{"notice_id":"081a16b3cb52439ea797d5ed0cf3ac6b","title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","solicitation_number":"RFP-376508-CD","notice_type":"o","base_type":"o","posted":"2026-11-19","posted_at":"2026-11-19T21:26:24.412Z","due_at":"2026-12-17T22:00:00Z","due_date":"2026-12-17","cancelled":false,"archived":false,"archive_date":"2027-01-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/081a16b3cb52439ea797d5ed0cf3ac6b/view","enriched":true,"history":[{"index":5,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-19T21:26:24.412Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"081a16b3cb52439ea797d5ed0cf3ac6b","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":4,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-30T18:48:02.093Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e7d0c4832764a279ed8191c8f4e789d","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":3,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-07T14:06:55.561Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"14034cd5817d49c38056351ef936d097","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":2,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T21:00:29.017Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d285489a5ca44b42a999bc943cc821cb","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":1,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T14:49:18.407Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad","solicitation_number":"RFP-376508-CD"}]}],"latest_notice_id":"081a16b3cb52439ea797d5ed0cf3ac6b","first_type":"o","notices":[{"dates":{"posted":"2026-09-17","posted_at":"2026-09-17T14:49:18.407Z","created_at":"2026-09-17T14:27:21.705Z","modified_at":"2026-09-17T14:49:18.410Z","response_deadline":{"raw":"2026-11-17T16:00:00-06:00","utc":"2026-11-17T22:00:00Z","date":"2026-11-17","time":"16:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b3e96254b8dc47f48e58f2821e5100ad/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"publication":"published","archive_date":"2026-12-02","archive_type":"auto15"},"history":[{"index":1,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T14:49:18.407Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad","solicitation_number":"RFP-376508-CD"}],"contacts":[{"name":"Chris Daley","role":"primary","email":"cdaley@fnal.gov","phone":"6308404256"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"b3e96254b8dc47f48e58f2821e5100ad","lineage_id":"b3e96254b8dc47f48e58f2821e5100ad","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-18T04:53:08.340380828Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"b8134594248a9916ac2860c55d73e8a64ccf710bb4a713d1896b72edc443c0fe","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-18T03:58:46.954081762Z"},"description":{"html":"<p>This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab&rsquo;s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.</p>\n\n<p>The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.</p>\n\n<p>The critical schedule constraint for construction of this project is Fermilab&rsquo;s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.&nbsp; The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.</p>\n\n<p>This project includes the following milestones:</p>\n\n<p>Milestone 1 &ndash; Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.</p>\n\n<p>Milestone 2 &ndash; 3rd January 2028; This milestone marks the point where construction work may begin.</p>\n\n<p>Milestone 3 &ndash; 31st January 2029; AUP 1 CUB Extension complete.</p>\n\n<p>Milestone 4 &ndash; 29th June 2029; AUP 2 Existing CUB Upgrade complete.</p>\n\n<p>Milestone 5 &ndash; 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.</p>","text":"This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.\n\nThe General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.\n\nThe critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.\n\nThis project includes the following milestones:\n\nMilestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.\n\nMilestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin.\n\nMilestone 3 – 31st January 2029; AUP 1 CUB Extension complete.\n\nMilestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete.\n\nMilestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"RFP-376508-CD","place_of_performance":{"zip":"60510","city":{"name":"Batavia"},"state":{"code":"IL"},"country":{"code":"USA"}},"product_service_code":"Z2EZ"},{"dates":{"posted":"2026-10-06","posted_at":"2026-10-06T21:00:29.017Z","created_at":"2026-10-06T20:58:01.813Z","modified_at":"2026-10-07T14:06:55.561Z","response_deadline":{"raw":"2026-11-17T16:00:00-06:00","utc":"2026-11-17T22:00:00Z","date":"2026-11-17","time":"16:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d285489a5ca44b42a999bc943cc821cb/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":false,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-12-02","archive_type":"auto15"},"history":[{"index":3,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-07T14:06:55.561Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"14034cd5817d49c38056351ef936d097","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":2,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T21:00:29.017Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d285489a5ca44b42a999bc943cc821cb","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":1,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T14:49:18.407Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad","solicitation_number":"RFP-376508-CD"}],"contacts":[{"name":"Chris Daley","role":"primary","email":"cdaley@fnal.gov","phone":"6308404256"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d285489a5ca44b42a999bc943cc821cb","lineage_id":"b3e96254b8dc47f48e58f2821e5100ad","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-08T00:38:12.040176424Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"069cbdcafb7f9c0ea3e81245435a218fc6f564785cf41aa884a0ac0818759d38","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-10-07T04:24:57.467375089Z"},"description":{"html":"<p>On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.</p>\n\n<p>This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab&rsquo;s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.</p>\n\n<p>The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.</p>\n\n<p>The critical schedule constraint for construction of this project is Fermilab&rsquo;s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.&nbsp; The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.</p>\n\n<p>This project includes the following milestones:</p>\n\n<p>Milestone 1 &ndash; Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.</p>\n\n<p>Milestone 2 &ndash; 3rd January 2028; This milestone marks the point where construction work may begin.</p>\n\n<p>Milestone 3 &ndash; 31st January 2029; AUP 1 CUB Extension complete.</p>\n\n<p>Milestone 4 &ndash; 29th June 2029; AUP 2 Existing CUB Upgrade complete.</p>\n\n<p>Milestone 5 &ndash; 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.</p>","text":"On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.\n\nThis scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.\n\nThe General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.\n\nThe critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.\n\nThis project includes the following milestones:\n\nMilestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.\n\nMilestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin.\n\nMilestone 3 – 31st January 2029; AUP 1 CUB Extension complete.\n\nMilestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete.\n\nMilestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"RFP-376508-CD","place_of_performance":{"zip":"60510","city":{"code":"4078","name":"Batavia"},"state":{"code":"IL","name":"Illinois"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2EZ"},{"dates":{"posted":"2026-10-07","posted_at":"2026-10-07T14:06:55.561Z","created_at":"2026-10-07T14:05:26.099Z","modified_at":"2026-10-07T14:06:55.565Z","response_deadline":{"raw":"2026-11-17T16:00:00-06:00","utc":"2026-11-17T22:00:00Z","date":"2026-11-17","time":"16:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/14034cd5817d49c38056351ef936d097/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-12-02","archive_type":"auto15"},"history":[{"index":3,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-07T14:06:55.561Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"14034cd5817d49c38056351ef936d097","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":2,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T21:00:29.017Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d285489a5ca44b42a999bc943cc821cb","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":1,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T14:49:18.407Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad","solicitation_number":"RFP-376508-CD"}],"contacts":[{"name":"Chris Daley","role":"primary","email":"cdaley@fnal.gov","phone":"6308404256"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"14034cd5817d49c38056351ef936d097","lineage_id":"b3e96254b8dc47f48e58f2821e5100ad","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-08T04:09:27.704407072Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"44b2926b85b269bfc3426c1c0a19ed481f1a5109230e0c3d8749f1ca864cd821","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-10-08T03:45:11.226814968Z"},"description":{"html":"<p>On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment&nbsp; No. 1.</p>\n\n<p>On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.</p>\n\n<p>This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab&rsquo;s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.</p>\n\n<p>The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.</p>\n\n<p>The critical schedule constraint for construction of this project is Fermilab&rsquo;s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.&nbsp; The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.</p>\n\n<p>This project includes the following milestones:</p>\n\n<p>Milestone 1 &ndash; Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.</p>\n\n<p>Milestone 2 &ndash; 3rd January 2028; This milestone marks the point where construction work may begin.</p>\n\n<p>Milestone 3 &ndash; 31st January 2029; AUP 1 CUB Extension complete.</p>\n\n<p>Milestone 4 &ndash; 29th June 2029; AUP 2 Existing CUB Upgrade complete.</p>\n\n<p>Milestone 5 &ndash; 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.</p>","text":"On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1.\n\nOn October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.\n\nThis scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.\n\nThe General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.\n\nThe critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.\n\nThis project includes the following milestones:\n\nMilestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.\n\nMilestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin.\n\nMilestone 3 – 31st January 2029; AUP 1 CUB Extension complete.\n\nMilestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete.\n\nMilestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"RFP-376508-CD","place_of_performance":{"zip":"60510","city":{"code":"4078","name":"Batavia"},"state":{"code":"IL","name":"Illinois"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2EZ"},{"dates":{"posted":"2026-10-30","posted_at":"2026-10-30T18:48:02.093Z","created_at":"2026-10-30T18:43:08.127Z","modified_at":"2026-10-30T18:48:02.099Z","response_deadline":{"raw":"2026-12-17T16:00:00-06:00","utc":"2026-12-17T22:00:00Z","date":"2026-12-17","time":"16:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4e7d0c4832764a279ed8191c8f4e789d/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_id":"500047667","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-01-01","archive_type":"auto15"},"history":[{"index":4,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-30T18:48:02.093Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e7d0c4832764a279ed8191c8f4e789d","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":3,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-07T14:06:55.561Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"14034cd5817d49c38056351ef936d097","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":2,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T21:00:29.017Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d285489a5ca44b42a999bc943cc821cb","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":1,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T14:49:18.407Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad","solicitation_number":"RFP-376508-CD"}],"contacts":[{"name":"Chris Daley","role":"primary","email":"cdaley@fnal.gov","phone":"6308404256"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4e7d0c4832764a279ed8191c8f4e789d","lineage_id":"b3e96254b8dc47f48e58f2821e5100ad","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T10:56:24.656295632Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"2408287f828c243a041fc7d726eae76df54bfc7f5d94e8b4807da877b1cd0631","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-11T10:56:24.656295632Z","first_seen_at":"2026-10-31T03:47:30.063427912Z"},"description":{"html":"<p>On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026.</p>\n\n<p>On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment&nbsp; No. 1.</p>\n\n<p>On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.</p>\n\n<p>This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab&rsquo;s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.</p>\n\n<p>The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.</p>\n\n<p>The critical schedule constraint for construction of this project is Fermilab&rsquo;s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.&nbsp; The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.</p>\n\n<p>This project includes the following milestones:</p>\n\n<p>Milestone 1 &ndash; Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.</p>\n\n<p>Milestone 2 &ndash; 3rd January 2028; This milestone marks the point where construction work may begin.</p>\n\n<p>Milestone 3 &ndash; 31st January 2029; AUP 1 CUB Extension complete.</p>\n\n<p>Milestone 4 &ndash; 29th June 2029; AUP 2 Existing CUB Upgrade complete.</p>\n\n<p>Milestone 5 &ndash; 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.</p>","text":"On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026.\n\nOn October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1.\n\nOn October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.\n\nThis scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.\n\nThe General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.\n\nThe critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.\n\nThis project includes the following milestones:\n\nMilestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.\n\nMilestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin.\n\nMilestone 3 – 31st January 2029; AUP 1 CUB Extension complete.\n\nMilestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete.\n\nMilestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"RFP-376508-CD","place_of_performance":{"zip":"60510","city":{"code":"4078","name":"Batavia"},"state":{"code":"IL","name":"Illinois"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2EZ"},{"dates":{"posted":"2026-11-19","posted_at":"2026-11-19T21:26:24.412Z","created_at":"2026-11-19T21:22:47.562Z","modified_at":"2026-11-19T21:26:24.419Z","response_deadline":{"raw":"2026-12-17T16:00:00-06:00","utc":"2026-12-17T22:00:00Z","date":"2026-12-17","time":"16:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/081a16b3cb52439ea797d5ed0cf3ac6b/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_id":"500047667","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-01-01","archive_type":"auto15"},"history":[{"index":5,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-19T21:26:24.412Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"081a16b3cb52439ea797d5ed0cf3ac6b","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":4,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-30T18:48:02.093Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e7d0c4832764a279ed8191c8f4e789d","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":3,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-07T14:06:55.561Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"14034cd5817d49c38056351ef936d097","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":2,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T21:00:29.017Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d285489a5ca44b42a999bc943cc821cb","solicitation_number":"RFP-376508-CD","parent_opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad"},{"index":1,"title":"Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T14:49:18.407Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b3e96254b8dc47f48e58f2821e5100ad","solicitation_number":"RFP-376508-CD"}],"contacts":[{"name":"Chris Daley","role":"primary","email":"cdaley@fnal.gov","phone":"6308404256"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"081a16b3cb52439ea797d5ed0cf3ac6b","lineage_id":"b3e96254b8dc47f48e58f2821e5100ad","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-20T07:12:14.934609355Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"c16e5e0dfa0d95d43d743e49e58247ca-28\"","fetched_at":"2026-11-20T05:29:17.372835729Z","row_sha256":"94f2a2599c51cf4b99fa597e97c87ce4b608c36d0d46f062d73e0841a80e49ec","last_modified":"2026-11-20T04:30:19Z"},"updated_at":"2026-11-20T07:12:14.934609355Z","first_seen_at":"2026-11-20T05:29:17.372835729Z"},"description":{"html":"<p>On November 19, 2026, Amendment No. 4 was issued to&nbsp; provide responses to questioins received from prospective offerors, Replace Exhibts G, L, and M with Revised Exhibits, provide informational documents, and add additional site visit dates.</p>\n\n<p>On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026.</p>\n\n<p>On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment&nbsp; No. 1.</p>\n\n<p>On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.</p>\n\n<p>This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab&rsquo;s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.</p>\n\n<p>The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.</p>\n\n<p>The critical schedule constraint for construction of this project is Fermilab&rsquo;s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.&nbsp; The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.</p>\n\n<p>This project includes the following milestones:</p>\n\n<p>Milestone 1 &ndash; Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.</p>\n\n<p>Milestone 2 &ndash; 3rd January 2028; This milestone marks the point where construction work may begin.</p>\n\n<p>Milestone 3 &ndash; 31st January 2029; AUP 1 CUB Extension complete.</p>\n\n<p>Milestone 4 &ndash; 29th June 2029; AUP 2 Existing CUB Upgrade complete.</p>\n\n<p>Milestone 5 &ndash; 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.</p>","text":"On November 19, 2026, Amendment No. 4 was issued to provide responses to questioins received from prospective offerors, Replace Exhibts G, L, and M with Revised Exhibits, provide informational documents, and add additional site visit dates.\n\nOn Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026.\n\nOn October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1.\n\nOn October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.\n\nThis scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.\n\nThe General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.\n\nThe critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.\n\nThis project includes the following milestones:\n\nMilestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.\n\nMilestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin.\n\nMilestone 3 – 31st January 2029; AUP 1 CUB Extension complete.\n\nMilestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete.\n\nMilestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"RFP-376508-CD","place_of_performance":{"zip":"60510","city":{"code":"4078","name":"Batavia"},"state":{"code":"IL","name":"Illinois"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2EZ"}],"due_at":"2026-12-17T22:00:00Z","due_date":"2026-12-17","closes_at":"2026-12-17T22:00:00Z","awardable":true,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-11-20T05:30:09.595354Z","principal_notice_id":"081a16b3cb52439ea797d5ed0cf3ac6b","description":{"text":"On November 19, 2026, Amendment No. 4 was issued to provide responses to questioins received from prospective offerors, Replace Exhibts G, L, and M with Revised Exhibits, provide informational documents, and add additional site visit dates.\n\nOn Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026.\n\nOn October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1.\n\nOn October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.\n\nThis scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.\n\nThe General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.\n\nThe critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.\n\nThis project includes the following milestones:\n\nMilestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.\n\nMilestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin.\n\nMilestone 3 – 31st January 2029; AUP 1 CUB Extension complete.\n\nMilestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete.\n\nMilestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.","html":"<p>On November 19, 2026, Amendment No. 4 was issued to&nbsp; provide responses to questioins received from prospective offerors, Replace Exhibts G, L, and M with Revised Exhibits, provide informational documents, and add additional site visit dates.</p>\n\n<p>On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026.</p>\n\n<p>On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment&nbsp; No. 1.</p>\n\n<p>On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.</p>\n\n<p>This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab&rsquo;s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.</p>\n\n<p>The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.</p>\n\n<p>The critical schedule constraint for construction of this project is Fermilab&rsquo;s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.&nbsp; The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.</p>\n\n<p>This project includes the following milestones:</p>\n\n<p>Milestone 1 &ndash; Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.</p>\n\n<p>Milestone 2 &ndash; 3rd January 2028; This milestone marks the point where construction work may begin.</p>\n\n<p>Milestone 3 &ndash; 31st January 2029; AUP 1 CUB Extension complete.</p>\n\n<p>Milestone 4 &ndash; 29th June 2029; AUP 2 Existing CUB Upgrade complete.</p>\n\n<p>Milestone 5 &ndash; 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.</p>","origin":"detail"},"contacts":[{"name":"Chris Daley","role":"primary","email":"cdaley@fnal.gov","phone":"6308404256"}],"place_of_performance":{"zip":"60510","city":{"code":"4078","name":"Batavia"},"state":{"code":"IL","name":"Illinois"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"naics_codes":["236210"],"award":null,"attachments":[{"resource_id":"ac12ffbcb3b44dfba83c2f983488b5e5","name":"Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf","kind":"file","mime_type":".pdf","size_bytes":765311,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ac12ffbcb3b44dfba83c2f983488b5e5/download","mirrored":false},{"resource_id":"007db4985f654d0aa794f06615feed01","name":"Exhibit Q- Davis Bacon Wage Rate.pdf","kind":"file","mime_type":".pdf","size_bytes":493378,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/007db4985f654d0aa794f06615feed01/download","mirrored":false},{"resource_id":"a979179672fd48d7945ea3baf6e03399","name":"Exhibit P- Performance Bond_FL-40.pdf","kind":"file","mime_type":".pdf","size_bytes":760783,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a979179672fd48d7945ea3baf6e03399/download","mirrored":false},{"resource_id":"7ff4e3e7bb684812b8c4c23537b85f59","name":"Exhibit O- FL-42 (Rev 1.25) - Payment Bond.pdf","kind":"file","mime_type":".pdf","size_bytes":1688977,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7ff4e3e7bb684812b8c4c23537b85f59/download","mirrored":false},{"resource_id":"c866ee56e34c4abead943e00e7a3869a","name":"Exhibit N- Bond Bid FL-41.pdf","kind":"file","mime_type":".pdf","size_bytes":767109,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c866ee56e34c4abead943e00e7a3869a/download","mirrored":false},{"resource_id":"f5343a9f2bc64071bcdd2c16898a07aa","name":"Exhibit M- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf","kind":"file","mime_type":".pdf","size_bytes":487205,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f5343a9f2bc64071bcdd2c16898a07aa/download","mirrored":false},{"resource_id":"3a621df5a94b4c19b233894dc06b7de3","name":"Exhibit L- Subcontractor Annual RepsCerts-SARC. Rev 8.pdf","kind":"file","mime_type":".pdf","size_bytes":487222,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3a621df5a94b4c19b233894dc06b7de3/download","mirrored":false},{"resource_id":"233504068a584b20b46b7bd9b7a62c97","name":"Exhibit K- Price Proposal Form.pdf","kind":"file","mime_type":".pdf","size_bytes":751316,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/233504068a584b20b46b7bd9b7a62c97/download","mirrored":false},{"resource_id":"cc05d3720012421386dd97c265bf18fc","name":"Exhibit J - Fermilab Subcontractor Safety Information Questionnaire.pdf","kind":"file","mime_type":".pdf","size_bytes":1456964,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cc05d3720012421386dd97c265bf18fc/download","mirrored":false},{"resource_id":"46d23fc0ceea44d9ae0a656ac7df25d0","name":"Exhibit I - Statement of Acknowledgment (SF-1413).pdf","kind":"file","mime_type":".pdf","size_bytes":715281,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/46d23fc0ceea44d9ae0a656ac7df25d0/download","mirrored":false},{"resource_id":"01a039a1596e45c195992b6dbde706b2","name":"Exhibit H - Construction Insurance Requirements.pdf","kind":"file","mime_type":".pdf","size_bytes":250976,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/01a039a1596e45c195992b6dbde706b2/download","mirrored":false},{"resource_id":"ae74e3cd4348426e87459023c2304ec9","name":"Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf","kind":"file","mime_type":".pdf","size_bytes":327302,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ae74e3cd4348426e87459023c2304ec9/download","mirrored":false},{"resource_id":"50e14e5486b74fbfa1ef68395010b31a","name":"Exhibit F- Army Corp NPR-Letter.pdf","kind":"file","mime_type":".pdf","size_bytes":162033,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/50e14e5486b74fbfa1ef68395010b31a/download","mirrored":false},{"resource_id":"269125e345964d4fae2fd0aa7f17b38f","name":"Exhibit E- Electrical (LV) Calculations.pdf","kind":"file","mime_type":".pdf","size_bytes":355726,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/269125e345964d4fae2fd0aa7f17b38f/download","mirrored":false},{"resource_id":"28bd9d5e544746a182817e653b271c4d","name":"Exhibit D- Geotechnical Engineering Report.pdf","kind":"file","mime_type":".pdf","size_bytes":38716325,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/28bd9d5e544746a182817e653b271c4d/download","mirrored":false},{"resource_id":"b94d9198b39b4362bd2e178eab3099f4","name":"Exhibit C- Specification Set- New CHW Plant and CUB Upgrades.pdf","kind":"file","mime_type":".pdf","size_bytes":30125626,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b94d9198b39b4362bd2e178eab3099f4/download","mirrored":false},{"resource_id":"b58630311a4b452282ad61645ffc55ae","name":"Exhibit B- Construction Drawing Set.pdf","kind":"file","mime_type":".pdf","size_bytes":110633480,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b58630311a4b452282ad61645ffc55ae/download","mirrored":false},{"resource_id":"de7e2a34012e4d078fb99de53df7235f","name":"Exhibit A - Scope of Work UIP SP-1 CUB.pdf","kind":"file","mime_type":".pdf","size_bytes":257877,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/de7e2a34012e4d078fb99de53df7235f/download","mirrored":false},{"resource_id":"d6b3d3c89dc1436f811844cec5c8846c","name":"1.0 RFP 376508-CD Instructions to Offerors.pdf","kind":"file","mime_type":".pdf","size_bytes":317249,"posted_at":"2026-09-17T14:49:18.407Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d6b3d3c89dc1436f811844cec5c8846c/download","mirrored":false},{"resource_id":"e7545032fedb4f43aa15d47b0c840414","name":"Amend 01 to RFP 376508-CD.pdf","kind":"file","mime_type":".pdf","size_bytes":162448,"posted_at":"2026-10-06T21:00:29.017Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e7545032fedb4f43aa15d47b0c840414/download","mirrored":false},{"resource_id":"807284e332a543dead3f2cbc06a2d28d","name":"Amend 02 to RFP 376508-CD.pdf","kind":"file","mime_type":".pdf","size_bytes":127388,"posted_at":"2026-10-07T14:06:55.561Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/807284e332a543dead3f2cbc06a2d28d/download","mirrored":false},{"resource_id":"2af6cf8aefd64864910cd08b2afabaf8","name":"Amend 03 Transformer Pics.zip","kind":"file","mime_type":".zip","size_bytes":2737745,"posted_at":"2026-10-30T18:48:02.093Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2af6cf8aefd64864910cd08b2afabaf8/download","mirrored":false},{"resource_id":"eae8fa8b600f4837826ef5c1793c7fb1","name":"Amend 03 Submittal for DHP-CU-1.pdf","kind":"file","mime_type":".pdf","size_bytes":645333,"posted_at":"2026-10-30T18:48:02.093Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/eae8fa8b600f4837826ef5c1793c7fb1/download","mirrored":false},{"resource_id":"724784027e8a4372bbaaf469014abbc7","name":"Amend 03 CUB Electrical Upgrade As-Builts.pdf","kind":"file","mime_type":".pdf","size_bytes":17701410,"posted_at":"2026-10-30T18:48:02.093Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/724784027e8a4372bbaaf469014abbc7/download","mirrored":false},{"resource_id":"f2846cd3403543beb88968b910ac6249","name":"Amend 03 CUB Original As-Built Drawings.pdf","kind":"file","mime_type":".pdf","size_bytes":20922882,"posted_at":"2026-10-30T18:48:02.093Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f2846cd3403543beb88968b910ac6249/download","mirrored":false},{"resource_id":"8ab9f729ce47420e980224fe2d9f1e03","name":"Amend 03 to RFP 376508-CD.pdf","kind":"file","mime_type":".pdf","size_bytes":184307,"posted_at":"2026-10-30T18:48:02.093Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8ab9f729ce47420e980224fe2d9f1e03/download","mirrored":false},{"resource_id":"c92f959826f84da1b58592c5865b724e","name":"Amend 04 to RFP 376508-CD.pdf","kind":"file","mime_type":".pdf","size_bytes":2391394,"posted_at":"2026-11-19T21:26:24.412Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c92f959826f84da1b58592c5865b724e/download","mirrored":false}],"awards":[],"related":[{"key":"378854MR","latest_notice_id":"e1f72176eb994530a1340e9bf2a51a91","title":"PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION","solicitation_number":"378854_MR","notice_type":"o","first_type":"o","first_posted":"2026-10-08","last_posted":"2026-11-16","notices":5,"due_at":"2026-12-03T20:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"23822","psc":"K056","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"385439GMK","latest_notice_id":"e17f8904e0134bd890eafbae01571c74","title":"UTILITY EXCAVATION AND REPAIR SERVICES IDIQ","solicitation_number":"385439GMK","notice_type":"o","first_type":"o","first_posted":"2026-11-06","last_posted":"2026-11-06","notices":1,"due_at":"2026-12-07T21:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"238910","psc":"Y1PZ","set_aside":"SBA","state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-07T04:54:53.607561Z"},{"key":"RFIVACUUMVESSELS","latest_notice_id":"ea26e0b581dc4104b03163f640a7b274","title":"Request for Information - Vacuum Vessels","solicitation_number":"RFIVacuumVessels","notice_type":"p","first_type":"p","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-12-07T22:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"332710","psc":"AJ13","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"385515GMK","latest_notice_id":"65747435c0224a859780416b36f2d6bf","title":"Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade","solicitation_number":"385515GMK","notice_type":"o","first_type":"o","first_posted":"2026-10-22","last_posted":"2026-11-11","notices":3,"due_at":"2026-12-09T21:00:00Z","due_date":"2026-12-09","closes_at":"2026-12-09T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"236220","psc":"Z2AZ","set_aside":"SBA","state":"IL","county":"17089","county_name":"Kane County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-12T04:43:37.498412Z"},{"key":"RFP389882","latest_notice_id":"c558db76dbe94287afb9c6eeaa5b8e49","title":"Cryogenic Mezzanine Structure","solicitation_number":"RFP389882","notice_type":"o","first_type":"o","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-11T22:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"33271","psc":"AJ13","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open":[{"key":"140A2327Q0297","latest_notice_id":"e23146304c404a24ad420d6821b45e75","title":"Y--IE181 - WHS Greenhouse Construction","solicitation_number":"140A2327Q0297","notice_type":"o","first_type":"o","first_posted":"2026-10-20","last_posted":"2026-11-18","notices":2,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1450","sub_name":"BUREAU OF INDIAN AFFAIRS","office_key":"o-140A23","office_name":"INDIAN EDUCATION ACQUISITION OFFICE","naics":"236210","psc":"Y1CA","set_aside":"ISBEE","state":"NM","county":"35031","county_name":"McKinley County","city":"3527410","city_name":"Fort Wingate","country":null,"place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"FA706027RXXX2","latest_notice_id":"a5758e59cd7b4be4a87845edec87f359","title":"Multiple Award Construction Contract (MACC)","solicitation_number":"FA706027RXXX2","notice_type":"r","first_type":"r","first_posted":"2026-11-05","last_posted":"2026-11-05","notices":1,"due_at":"2026-11-30T21:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA7060","office_name":"FA7060 11TH CONTRACTING SQ PK","naics":"236210","psc":"Z2JZ","set_aside":null,"state":"DC","county":"11001","county_name":"District of Columbia","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"},{"key":"FA813726R0040","latest_notice_id":"49cbd90b4ddd456fb05b7337b27520f9","title":"Tinker AFB 2026 Multiple Award Construction Contract (MACC)","solicitation_number":"FA8137-26-R-0040","notice_type":"o","first_type":"o","first_posted":"2026-06-12","last_posted":"2026-11-20","notices":16,"due_at":"2026-12-03T19:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA8137","office_name":"FA8137 AFSC PZIOC","naics":"236210","psc":"Z2JZ","set_aside":"SBP","state":"OK","county":"40109","county_name":"Oklahoma County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Tinker Air Force Base","site_key":"tinker-air-force-base-ok","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":5,"indexable":true}