Solicitation
Multi -Roof Replacement Project
RFP26-021R
Department of Energy, Princeton Lab - DOE Contractor. Commercial and Institutional Building Construction.
Response deadline
February 27, 2026 at 4:00 PM EST
Closed 271 days ago. Posted January 28, 2026, first published January 27, 2026. Scheduled to archive March 28, 2026.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2026
195 like it are open now in commercial and institutional building construction
- 561-26-103 Upgrade Electrical and Plumbing in Building 18B
Department of Veterans Affairs, 242-Network Contract Office 02
SolicitationSDVOSBNAICS 236220East Orange, NJ36C24227B0003_1Closes in 19 daysDec 14 - FY27 Design-Build (DB) Single Award Task Order Contract (SATOC) Baden-Wurttemberg Rheinland-Pfalz
Department of the Army, W2SD Endist Europe
Sources soughtNAICS 236220Outside the USW912GB271CUBDue todayNov 25 - P233 AIR TRAFFIC CONTROL TOWER AND FLIGHT SIMULATOR TRAINING FACILITY
Department of the Navy, Navfacsyscom Southeast
Due todayNov 25
All 195 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 31 days from the day the solicitation was posted, January 27, 2026, to the deadline. The deadline moved once: it was first February 24, 2026 and ended as February 27, 2026.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump
House/D45 Rad Waste Handling Facility) which are past their useful life requiring costly
maintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,
and flashing. Portions of existing metal coping have pulled away during storm events causing
large sections of membrane to separate from the substrate. A catastrophic failure to one of
these roofs would negatively impact the ability to conduct the top priority experimental
operations in the Laboratory.
1.2. SCOPE
1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise
required replace the noted roofs and specified components per the associated contract
documents. Construction scope includes the following:
1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:
1.2.1.1.1. C50 – ESAT Building
1.2.1.1.2. C52 – PLT Power Building
1.2.1.1.3. C60 – C Site Pump House
1.2.1.1.4. D45 – Rad Waste Handling Facility
1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,
flashing, coping and any other miscellaneous roofing material accessories.
1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be
provided to PPPL.
1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within
this SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,
and metal/concrete roof panels.
1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof
installation. Any equipment that should be temporarily relocated so roof replacement
work can be completed shall be the responsibility of the roofing contractor.
1.2.1.6. Contractor to furnish and install 2 layers of 2.6” ISO.
1.2.1.7. Contractor to furnish and install ½” HD coverboard mechanically fastened.
1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered
to coverboard.
1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other
roofing components as required for manufacturer’s warranty.
Page 3 of 21
1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,
cover board, and insulation.
1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing
building envelope are required to accommodate additional insulation.
1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations
and as necessary to meet manufacturer’s requirements.
1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all
manufacturer specifications to obtain a minimum manufacturer system warranty of
30 years along with a 2-year installers warranty. The warranty coverage shall
include incidental membrane punctures, damage from hail and a minimum of 72-
mph peak gust wind speeds.
1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet
for details.
1.2.1.12. New and higher curbs as required due to the new roof installation work.
1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.
1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT
building roof.
1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.
1.2.1.16. Contractor to replace all existing roof scuppers with new.
1.2.1.17. Contractor to replace all existing roof drains with new.
1.2.1.18. Contractor to provide minimum of 12” overlap between the existing adjacent roof
membrane system and provide written confirmation the systems are compatible.
1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems
identified on roof sections.
1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT
building roof.
1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to
assist the abatement contractor to bring the sealed roofing material down from roof area
to grade with lift equipment. Coordination of this work shall be completed in concert with
all other construction activities. The subcontractor to follow directly after PPPL
abatement contractor to install new roofing system. The construction subcontractor shall
be responsible to coordinate all work with PPPL.
1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a
minimum of 72 hours prior. All equipment that will be out of service shall be minimized.
1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.
THERE ARE (5) COVER LETTER SECTIONS TO THE RFP. THERE ARE FILES ATTACHED TO EACH COVER LETTER. TO VIEW THE ATTACHMENTS YOU MUST
(1) FIRST DOWNLOAD EACH COVER LETTER SECTION TO YOUR DESKTOP.
(2) AFTER DOWNLOADING EACH COVER LETTER--REOPENED EACH ONE (ON YOUR DESKTOP)
YOU SHOULD BE ABLE TO SEE THE ATTACHED FILES ON THE RIGHT HAND SIDE OF THE COMPUTER SCREEN. BE SURE TO UTILIZE ADOBE ACROBAT SOFTWARE TO VIEW THE PDF FILES
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- SOW_C50-C52-C60-D45 Roof Replacement Work.pdf39.1 MB, January 27, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 27, 2026
Solicitation
Due February 24, 2026 at 4:00 PM EST. SAM.gov, notice d5d5914d879e4bd69a9bc1f628a3d4e8
2 revisions on SAM
- January 28, 2026: publish, solicitation
- January 27, 2026: publish, solicitation
January 28, 2026
Solicitation
Due February 27, 2026 at 4:00 PM EST. SAM.gov, notice 8de1da092b6343039e06f3f23d7df974
2 revisions on SAM
- January 28, 2026: publish, solicitation
- January 27, 2026: publish, solicitation
Points of contact