{"canonical":"https://sealedbidder.com/opportunities/rfp26021r","key":"RFP26021R","url":"https://sealedbidder.com/opportunities/rfp26021r","title":"Multi -Roof Replacement Project","solicitation_number":"RFP26-021R","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-02-27T21:00:00Z","first_posted":"2026-01-27","last_posted":"2026-01-28","department":"ENERGY, DEPARTMENT OF","subagency":"ENERGY, DEPARTMENT OF","office":"PRINCETON LAB - DOE CONTRACTOR","naics":"236220","psc":"Y1EZ","set_aside":null,"place_state":"NJ","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"34021","place_county_name":"Mercer County","place_city":"3460900","place_city_name":"Princeton","winner":null,"award_amount":null,"publications":[{"notice_id":"d5d5914d879e4bd69a9bc1f628a3d4e8","title":"Multi -Roof Replacement Project","solicitation_number":"RFP26-021R","notice_type":"o","base_type":"o","posted":"2026-01-27","posted_at":"2026-01-27T23:37:58.328Z","due_at":"2026-02-24T21:00:00Z","due_date":"2026-02-24","cancelled":false,"archived":true,"archive_date":"2026-03-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d5d5914d879e4bd69a9bc1f628a3d4e8/view","enriched":true,"history":[{"index":3,"title":"Multi -Roof Replacement Project","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-28T23:26:38.511Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8de1da092b6343039e06f3f23d7df974","solicitation_number":"RFP26-021R","parent_opportunity_id":"d5d5914d879e4bd69a9bc1f628a3d4e8"},{"index":1,"title":"Multi -Roof Replacement Project","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T23:37:58.328Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d5d5914d879e4bd69a9bc1f628a3d4e8","solicitation_number":"RFP26-021R"}]},{"notice_id":"8de1da092b6343039e06f3f23d7df974","title":"Multi -Roof Replacement Project","solicitation_number":"RFP26-021R","notice_type":"o","base_type":"o","posted":"2026-01-28","posted_at":"2026-01-28T23:26:38.511Z","due_at":"2026-02-27T21:00:00Z","due_date":"2026-02-27","cancelled":false,"archived":true,"archive_date":"2026-03-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8de1da092b6343039e06f3f23d7df974/view","enriched":true,"history":[{"index":3,"title":"Multi -Roof Replacement Project","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-28T23:26:38.511Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8de1da092b6343039e06f3f23d7df974","solicitation_number":"RFP26-021R","parent_opportunity_id":"d5d5914d879e4bd69a9bc1f628a3d4e8"},{"index":1,"title":"Multi -Roof Replacement Project","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T23:37:58.328Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d5d5914d879e4bd69a9bc1f628a3d4e8","solicitation_number":"RFP26-021R"}]}],"latest_notice_id":"8de1da092b6343039e06f3f23d7df974","first_type":"o","notices":[{"dates":{"posted":"2026-01-27","posted_at":"2026-01-27T23:37:58.328Z","created_at":"2026-01-27T23:01:05.786Z","modified_at":"2026-03-28T04:06:42.662Z","response_deadline":{"raw":"2026-02-24T16:00:00-05:00","utc":"2026-02-24T21:00:00Z","date":"2026-02-24","time":"16:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d5d5914d879e4bd69a9bc1f628a3d4e8/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Multi -Roof Replacement Project","agency":{"office":{"code":"899035","name":"PRINCETON LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"08540","city":"Princeton","state":"NJ","country":"USA"},"organization_id":"500047668","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-28","archive_type":"auto_custom"},"history":[{"index":3,"title":"Multi -Roof Replacement Project","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-28T23:26:38.511Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8de1da092b6343039e06f3f23d7df974","solicitation_number":"RFP26-021R","parent_opportunity_id":"d5d5914d879e4bd69a9bc1f628a3d4e8"},{"index":1,"title":"Multi -Roof Replacement Project","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T23:37:58.328Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d5d5914d879e4bd69a9bc1f628a3d4e8","solicitation_number":"RFP26-021R"}],"contacts":[{"name":"Jimmy Russell","role":"primary","email":"jrussell@pppl.gov","phone":"6092433963"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d5d5914d879e4bd69a9bc1f628a3d4e8","lineage_id":"d5d5914d879e4bd69a9bc1f628a3d4e8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T12:18:59.285333967Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"2670a94364c57fb3f89b6990a6f6c488e20de5ab950451f1c4133815054edef2","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-14T12:18:59.285333967Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump<br />\nHouse/D45 Rad Waste Handling Facility) which are past their useful life requiring costly<br />\nmaintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,<br />\nand flashing. Portions of existing metal coping have pulled away during storm events causing<br />\nlarge sections of membrane to separate from the substrate. A catastrophic failure to one of<br />\nthese roofs would negatively impact the ability to conduct the top priority experimental<br />\noperations in the Laboratory.<br />\n1.2. SCOPE<br />\n1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise<br />\nrequired replace the noted roofs and specified components per the associated contract<br />\ndocuments. Construction scope includes the following:<br />\n1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:<br />\n1.2.1.1.1. C50 &ndash; ESAT Building<br />\n1.2.1.1.2. C52 &ndash; PLT Power Building<br />\n1.2.1.1.3. C60 &ndash; C Site Pump House<br />\n1.2.1.1.4. D45 &ndash; Rad Waste Handling Facility<br />\n1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,<br />\nflashing, coping and any other miscellaneous roofing material accessories.<br />\n1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be<br />\nprovided to PPPL.<br />\n1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within<br />\nthis SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,<br />\nand metal/concrete roof panels.<br />\n1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof<br />\ninstallation. Any equipment that should be temporarily relocated so roof replacement<br />\nwork can be completed shall be the responsibility of the roofing contractor.<br />\n1.2.1.6. Contractor to furnish and install 2 layers of 2.6&rdquo; ISO.<br />\n1.2.1.7. Contractor to furnish and install &frac12;&rdquo; HD coverboard mechanically fastened.<br />\n1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered<br />\nto coverboard.<br />\n1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other<br />\nroofing components as required for manufacturer&rsquo;s warranty.<br />\nPage 3 of 21<br />\n1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,<br />\ncover board, and insulation.<br />\n1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing<br />\nbuilding envelope are required to accommodate additional insulation.<br />\n1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations<br />\nand as necessary to meet manufacturer&rsquo;s requirements.<br />\n1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all<br />\nmanufacturer specifications to obtain a minimum manufacturer system warranty of<br />\n30 years along with a 2-year installers warranty. The warranty coverage shall<br />\ninclude incidental membrane punctures, damage from hail and a minimum of 72-<br />\nmph peak gust wind speeds.<br />\n1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet<br />\nfor details.<br />\n1.2.1.12. New and higher curbs as required due to the new roof installation work.<br />\n1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.<br />\n1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT<br />\nbuilding roof.<br />\n1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.<br />\n1.2.1.16. Contractor to replace all existing roof scuppers with new.<br />\n1.2.1.17. Contractor to replace all existing roof drains with new.<br />\n1.2.1.18. Contractor to provide minimum of 12&rdquo; overlap between the existing adjacent roof<br />\nmembrane system and provide written confirmation the systems are compatible.<br />\n1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems<br />\nidentified on roof sections.<br />\n1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT<br />\nbuilding roof.<br />\n1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to<br />\nassist the abatement contractor to bring the sealed roofing material down from roof area<br />\nto grade with lift equipment. Coordination of this work shall be completed in concert with<br />\nall other construction activities. The subcontractor to follow directly after PPPL<br />\nabatement contractor to install new roofing system. The construction subcontractor shall<br />\nbe responsible to coordinate all work with PPPL.<br />\n1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a<br />\nminimum of 72 hours prior. All equipment that will be out of service shall be minimized.<br />\n1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.</p>","text":"There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump\n\nHouse/D45 Rad Waste Handling Facility) which are past their useful life requiring costly\n\nmaintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,\n\nand flashing. Portions of existing metal coping have pulled away during storm events causing\n\nlarge sections of membrane to separate from the substrate. A catastrophic failure to one of\n\nthese roofs would negatively impact the ability to conduct the top priority experimental\n\noperations in the Laboratory.\n\n1.2. SCOPE\n\n1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise\n\nrequired replace the noted roofs and specified components per the associated contract\n\ndocuments. Construction scope includes the following:\n\n1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:\n\n1.2.1.1.1. C50 – ESAT Building\n\n1.2.1.1.2. C52 – PLT Power Building\n\n1.2.1.1.3. C60 – C Site Pump House\n\n1.2.1.1.4. D45 – Rad Waste Handling Facility\n\n1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,\n\nflashing, coping and any other miscellaneous roofing material accessories.\n\n1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be\n\nprovided to PPPL.\n\n1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within\n\nthis SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,\n\nand metal/concrete roof panels.\n\n1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof\n\ninstallation. Any equipment that should be temporarily relocated so roof replacement\n\nwork can be completed shall be the responsibility of the roofing contractor.\n\n1.2.1.6. Contractor to furnish and install 2 layers of 2.6” ISO.\n\n1.2.1.7. Contractor to furnish and install ½” HD coverboard mechanically fastened.\n\n1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered\n\nto coverboard.\n\n1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other\n\nroofing components as required for manufacturer’s warranty.\n\nPage 3 of 21\n\n1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,\n\ncover board, and insulation.\n\n1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing\n\nbuilding envelope are required to accommodate additional insulation.\n\n1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations\n\nand as necessary to meet manufacturer’s requirements.\n\n1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all\n\nmanufacturer specifications to obtain a minimum manufacturer system warranty of\n\n30 years along with a 2-year installers warranty. The warranty coverage shall\n\ninclude incidental membrane punctures, damage from hail and a minimum of 72-\n\nmph peak gust wind speeds.\n\n1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet\n\nfor details.\n\n1.2.1.12. New and higher curbs as required due to the new roof installation work.\n\n1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.\n\n1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT\n\nbuilding roof.\n\n1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.\n\n1.2.1.16. Contractor to replace all existing roof scuppers with new.\n\n1.2.1.17. Contractor to replace all existing roof drains with new.\n\n1.2.1.18. Contractor to provide minimum of 12” overlap between the existing adjacent roof\n\nmembrane system and provide written confirmation the systems are compatible.\n\n1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems\n\nidentified on roof sections.\n\n1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT\n\nbuilding roof.\n\n1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to\n\nassist the abatement contractor to bring the sealed roofing material down from roof area\n\nto grade with lift equipment. Coordination of this work shall be completed in concert with\n\nall other construction activities. The subcontractor to follow directly after PPPL\n\nabatement contractor to install new roofing system. The construction subcontractor shall\n\nbe responsible to coordinate all work with PPPL.\n\n1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a\n\nminimum of 72 hours prior. All equipment that will be out of service shall be minimized.\n\n1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"RFP26-021R","place_of_performance":{"zip":"08543","city":{"code":"60900","name":"Princeton"},"state":{"code":"NJ","name":"New Jersey"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1EZ"},{"dates":{"posted":"2026-01-28","posted_at":"2026-01-28T23:26:38.511Z","created_at":"2026-01-28T23:09:32.929Z","modified_at":"2026-03-28T04:06:42.662Z","response_deadline":{"raw":"2026-02-27T16:00:00-05:00","utc":"2026-02-27T21:00:00Z","date":"2026-02-27","time":"16:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8de1da092b6343039e06f3f23d7df974/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Multi -Roof Replacement Project","agency":{"office":{"code":"899035","name":"PRINCETON LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"08540","city":"Princeton","state":"NJ","country":"USA"},"organization_id":"500047668","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-28","archive_type":"auto_custom"},"history":[{"index":3,"title":"Multi -Roof Replacement Project","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-28T23:26:38.511Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8de1da092b6343039e06f3f23d7df974","solicitation_number":"RFP26-021R","parent_opportunity_id":"d5d5914d879e4bd69a9bc1f628a3d4e8"},{"index":1,"title":"Multi -Roof Replacement Project","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T23:37:58.328Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d5d5914d879e4bd69a9bc1f628a3d4e8","solicitation_number":"RFP26-021R"}],"contacts":[{"name":"Jimmy Russell","role":"primary","email":"jrussell@pppl.gov","phone":"6092433963"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8de1da092b6343039e06f3f23d7df974","lineage_id":"d5d5914d879e4bd69a9bc1f628a3d4e8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T10:55:41.006830808Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"b50d711ee5b6afb6e28b302739c86da7e474d86d4464d309f907f93486bcd5cd","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-14T10:55:41.006830808Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump<br />\nHouse/D45 Rad Waste Handling Facility) which are past their useful life requiring costly<br />\nmaintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,<br />\nand flashing. Portions of existing metal coping have pulled away during storm events causing<br />\nlarge sections of membrane to separate from the substrate. A catastrophic failure to one of<br />\nthese roofs would negatively impact the ability to conduct the top priority experimental<br />\noperations in the Laboratory.<br />\n1.2. SCOPE<br />\n1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise<br />\nrequired replace the noted roofs and specified components per the associated contract<br />\ndocuments. Construction scope includes the following:<br />\n1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:<br />\n1.2.1.1.1. C50 &ndash; ESAT Building<br />\n1.2.1.1.2. C52 &ndash; PLT Power Building<br />\n1.2.1.1.3. C60 &ndash; C Site Pump House<br />\n1.2.1.1.4. D45 &ndash; Rad Waste Handling Facility<br />\n1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,<br />\nflashing, coping and any other miscellaneous roofing material accessories.<br />\n1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be<br />\nprovided to PPPL.<br />\n1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within<br />\nthis SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,<br />\nand metal/concrete roof panels.<br />\n1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof<br />\ninstallation. Any equipment that should be temporarily relocated so roof replacement<br />\nwork can be completed shall be the responsibility of the roofing contractor.<br />\n1.2.1.6. Contractor to furnish and install 2 layers of 2.6&rdquo; ISO.<br />\n1.2.1.7. Contractor to furnish and install &frac12;&rdquo; HD coverboard mechanically fastened.<br />\n1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered<br />\nto coverboard.<br />\n1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other<br />\nroofing components as required for manufacturer&rsquo;s warranty.<br />\nPage 3 of 21<br />\n1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,<br />\ncover board, and insulation.<br />\n1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing<br />\nbuilding envelope are required to accommodate additional insulation.<br />\n1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations<br />\nand as necessary to meet manufacturer&rsquo;s requirements.<br />\n1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all<br />\nmanufacturer specifications to obtain a minimum manufacturer system warranty of<br />\n30 years along with a 2-year installers warranty. The warranty coverage shall<br />\ninclude incidental membrane punctures, damage from hail and a minimum of 72-<br />\nmph peak gust wind speeds.<br />\n1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet<br />\nfor details.<br />\n1.2.1.12. New and higher curbs as required due to the new roof installation work.<br />\n1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.<br />\n1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT<br />\nbuilding roof.<br />\n1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.<br />\n1.2.1.16. Contractor to replace all existing roof scuppers with new.<br />\n1.2.1.17. Contractor to replace all existing roof drains with new.<br />\n1.2.1.18. Contractor to provide minimum of 12&rdquo; overlap between the existing adjacent roof<br />\nmembrane system and provide written confirmation the systems are compatible.<br />\n1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems<br />\nidentified on roof sections.<br />\n1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT<br />\nbuilding roof.<br />\n1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to<br />\nassist the abatement contractor to bring the sealed roofing material down from roof area<br />\nto grade with lift equipment. Coordination of this work shall be completed in concert with<br />\nall other construction activities. The subcontractor to follow directly after PPPL<br />\nabatement contractor to install new roofing system. The construction subcontractor shall<br />\nbe responsible to coordinate all work with PPPL.<br />\n1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a<br />\nminimum of 72 hours prior. All equipment that will be out of service shall be minimized.<br />\n1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.</p>\n\n<p></p>\n\n<p><strong>THERE ARE (5) COVER LETTER SECTIONS TO THE RFP.&nbsp; THERE ARE FILES ATTACHED TO EACH COVER LETTER.&nbsp; TO VIEW THE ATTACHMENTS YOU MUST </strong></p>\n\n<p></p>\n\n<p><strong>(1) FIRST DOWNLOAD EACH COVER LETTER SECTION TO YOUR DESKTOP.&nbsp; </strong></p>\n\n<p><strong>(2) <u>AFTER DOWNLOADING EACH COVER LETTER</u>--REOPENED EACH ONE (ON YOUR DESKTOP)</strong></p>\n\n<p><strong>YOU SHOULD BE ABLE TO SEE THE ATTACHED FILES ON THE RIGHT HAND SIDE OF THE COMPUTER SCREEN.&nbsp; &nbsp;BE SURE TO UTILIZE ADOBE ACROBAT SOFTWARE TO VIEW THE PDF FILES</strong></p>","text":"There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump\n\nHouse/D45 Rad Waste Handling Facility) which are past their useful life requiring costly\n\nmaintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,\n\nand flashing. Portions of existing metal coping have pulled away during storm events causing\n\nlarge sections of membrane to separate from the substrate. A catastrophic failure to one of\n\nthese roofs would negatively impact the ability to conduct the top priority experimental\n\noperations in the Laboratory.\n\n1.2. SCOPE\n\n1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise\n\nrequired replace the noted roofs and specified components per the associated contract\n\ndocuments. Construction scope includes the following:\n\n1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:\n\n1.2.1.1.1. C50 – ESAT Building\n\n1.2.1.1.2. C52 – PLT Power Building\n\n1.2.1.1.3. C60 – C Site Pump House\n\n1.2.1.1.4. D45 – Rad Waste Handling Facility\n\n1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,\n\nflashing, coping and any other miscellaneous roofing material accessories.\n\n1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be\n\nprovided to PPPL.\n\n1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within\n\nthis SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,\n\nand metal/concrete roof panels.\n\n1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof\n\ninstallation. Any equipment that should be temporarily relocated so roof replacement\n\nwork can be completed shall be the responsibility of the roofing contractor.\n\n1.2.1.6. Contractor to furnish and install 2 layers of 2.6” ISO.\n\n1.2.1.7. Contractor to furnish and install ½” HD coverboard mechanically fastened.\n\n1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered\n\nto coverboard.\n\n1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other\n\nroofing components as required for manufacturer’s warranty.\n\nPage 3 of 21\n\n1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,\n\ncover board, and insulation.\n\n1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing\n\nbuilding envelope are required to accommodate additional insulation.\n\n1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations\n\nand as necessary to meet manufacturer’s requirements.\n\n1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all\n\nmanufacturer specifications to obtain a minimum manufacturer system warranty of\n\n30 years along with a 2-year installers warranty. The warranty coverage shall\n\ninclude incidental membrane punctures, damage from hail and a minimum of 72-\n\nmph peak gust wind speeds.\n\n1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet\n\nfor details.\n\n1.2.1.12. New and higher curbs as required due to the new roof installation work.\n\n1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.\n\n1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT\n\nbuilding roof.\n\n1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.\n\n1.2.1.16. Contractor to replace all existing roof scuppers with new.\n\n1.2.1.17. Contractor to replace all existing roof drains with new.\n\n1.2.1.18. Contractor to provide minimum of 12” overlap between the existing adjacent roof\n\nmembrane system and provide written confirmation the systems are compatible.\n\n1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems\n\nidentified on roof sections.\n\n1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT\n\nbuilding roof.\n\n1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to\n\nassist the abatement contractor to bring the sealed roofing material down from roof area\n\nto grade with lift equipment. Coordination of this work shall be completed in concert with\n\nall other construction activities. The subcontractor to follow directly after PPPL\n\nabatement contractor to install new roofing system. The construction subcontractor shall\n\nbe responsible to coordinate all work with PPPL.\n\n1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a\n\nminimum of 72 hours prior. All equipment that will be out of service shall be minimized.\n\n1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.\n\nTHERE ARE (5) COVER LETTER SECTIONS TO THE RFP. THERE ARE FILES ATTACHED TO EACH COVER LETTER. TO VIEW THE ATTACHMENTS YOU MUST\n\n(1) FIRST DOWNLOAD EACH COVER LETTER SECTION TO YOUR DESKTOP.\n\n(2) AFTER DOWNLOADING EACH COVER LETTER--REOPENED EACH ONE (ON YOUR DESKTOP)\n\nYOU SHOULD BE ABLE TO SEE THE ATTACHED FILES ON THE RIGHT HAND SIDE OF THE COMPUTER SCREEN. BE SURE TO UTILIZE ADOBE ACROBAT SOFTWARE TO VIEW THE PDF FILES","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"RFP26-021R","place_of_performance":{"zip":"08543","city":{"code":"60900","name":"Princeton"},"state":{"code":"NJ","name":"New Jersey"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1EZ"}],"due_at":"2026-02-27T21:00:00Z","due_date":"2026-02-27","closes_at":"2026-02-27T21:00:00Z","awardable":true,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899035","office_name":"PRINCETON LAB - DOE CONTRACTOR","state":"NJ","county":"34021","county_name":"Mercer County","city":"3460900","city_name":"Princeton","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-14T10:59:08.380935Z","principal_notice_id":"8de1da092b6343039e06f3f23d7df974","description":{"text":"There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump\n\nHouse/D45 Rad Waste Handling Facility) which are past their useful life requiring costly\n\nmaintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,\n\nand flashing. Portions of existing metal coping have pulled away during storm events causing\n\nlarge sections of membrane to separate from the substrate. A catastrophic failure to one of\n\nthese roofs would negatively impact the ability to conduct the top priority experimental\n\noperations in the Laboratory.\n\n1.2. SCOPE\n\n1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise\n\nrequired replace the noted roofs and specified components per the associated contract\n\ndocuments. Construction scope includes the following:\n\n1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:\n\n1.2.1.1.1. C50 – ESAT Building\n\n1.2.1.1.2. C52 – PLT Power Building\n\n1.2.1.1.3. C60 – C Site Pump House\n\n1.2.1.1.4. D45 – Rad Waste Handling Facility\n\n1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,\n\nflashing, coping and any other miscellaneous roofing material accessories.\n\n1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be\n\nprovided to PPPL.\n\n1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within\n\nthis SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,\n\nand metal/concrete roof panels.\n\n1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof\n\ninstallation. Any equipment that should be temporarily relocated so roof replacement\n\nwork can be completed shall be the responsibility of the roofing contractor.\n\n1.2.1.6. Contractor to furnish and install 2 layers of 2.6” ISO.\n\n1.2.1.7. Contractor to furnish and install ½” HD coverboard mechanically fastened.\n\n1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered\n\nto coverboard.\n\n1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other\n\nroofing components as required for manufacturer’s warranty.\n\nPage 3 of 21\n\n1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,\n\ncover board, and insulation.\n\n1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing\n\nbuilding envelope are required to accommodate additional insulation.\n\n1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations\n\nand as necessary to meet manufacturer’s requirements.\n\n1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all\n\nmanufacturer specifications to obtain a minimum manufacturer system warranty of\n\n30 years along with a 2-year installers warranty. The warranty coverage shall\n\ninclude incidental membrane punctures, damage from hail and a minimum of 72-\n\nmph peak gust wind speeds.\n\n1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet\n\nfor details.\n\n1.2.1.12. New and higher curbs as required due to the new roof installation work.\n\n1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.\n\n1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT\n\nbuilding roof.\n\n1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.\n\n1.2.1.16. Contractor to replace all existing roof scuppers with new.\n\n1.2.1.17. Contractor to replace all existing roof drains with new.\n\n1.2.1.18. Contractor to provide minimum of 12” overlap between the existing adjacent roof\n\nmembrane system and provide written confirmation the systems are compatible.\n\n1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems\n\nidentified on roof sections.\n\n1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT\n\nbuilding roof.\n\n1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to\n\nassist the abatement contractor to bring the sealed roofing material down from roof area\n\nto grade with lift equipment. Coordination of this work shall be completed in concert with\n\nall other construction activities. The subcontractor to follow directly after PPPL\n\nabatement contractor to install new roofing system. The construction subcontractor shall\n\nbe responsible to coordinate all work with PPPL.\n\n1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a\n\nminimum of 72 hours prior. All equipment that will be out of service shall be minimized.\n\n1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.\n\nTHERE ARE (5) COVER LETTER SECTIONS TO THE RFP. THERE ARE FILES ATTACHED TO EACH COVER LETTER. TO VIEW THE ATTACHMENTS YOU MUST\n\n(1) FIRST DOWNLOAD EACH COVER LETTER SECTION TO YOUR DESKTOP.\n\n(2) AFTER DOWNLOADING EACH COVER LETTER--REOPENED EACH ONE (ON YOUR DESKTOP)\n\nYOU SHOULD BE ABLE TO SEE THE ATTACHED FILES ON THE RIGHT HAND SIDE OF THE COMPUTER SCREEN. BE SURE TO UTILIZE ADOBE ACROBAT SOFTWARE TO VIEW THE PDF FILES","html":"<p>There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump<br />\nHouse/D45 Rad Waste Handling Facility) which are past their useful life requiring costly<br />\nmaintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,<br />\nand flashing. Portions of existing metal coping have pulled away during storm events causing<br />\nlarge sections of membrane to separate from the substrate. A catastrophic failure to one of<br />\nthese roofs would negatively impact the ability to conduct the top priority experimental<br />\noperations in the Laboratory.<br />\n1.2. SCOPE<br />\n1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise<br />\nrequired replace the noted roofs and specified components per the associated contract<br />\ndocuments. Construction scope includes the following:<br />\n1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:<br />\n1.2.1.1.1. C50 &ndash; ESAT Building<br />\n1.2.1.1.2. C52 &ndash; PLT Power Building<br />\n1.2.1.1.3. C60 &ndash; C Site Pump House<br />\n1.2.1.1.4. D45 &ndash; Rad Waste Handling Facility<br />\n1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,<br />\nflashing, coping and any other miscellaneous roofing material accessories.<br />\n1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be<br />\nprovided to PPPL.<br />\n1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within<br />\nthis SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,<br />\nand metal/concrete roof panels.<br />\n1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof<br />\ninstallation. Any equipment that should be temporarily relocated so roof replacement<br />\nwork can be completed shall be the responsibility of the roofing contractor.<br />\n1.2.1.6. Contractor to furnish and install 2 layers of 2.6&rdquo; ISO.<br />\n1.2.1.7. Contractor to furnish and install &frac12;&rdquo; HD coverboard mechanically fastened.<br />\n1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered<br />\nto coverboard.<br />\n1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other<br />\nroofing components as required for manufacturer&rsquo;s warranty.<br />\nPage 3 of 21<br />\n1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,<br />\ncover board, and insulation.<br />\n1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing<br />\nbuilding envelope are required to accommodate additional insulation.<br />\n1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations<br />\nand as necessary to meet manufacturer&rsquo;s requirements.<br />\n1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all<br />\nmanufacturer specifications to obtain a minimum manufacturer system warranty of<br />\n30 years along with a 2-year installers warranty. The warranty coverage shall<br />\ninclude incidental membrane punctures, damage from hail and a minimum of 72-<br />\nmph peak gust wind speeds.<br />\n1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet<br />\nfor details.<br />\n1.2.1.12. New and higher curbs as required due to the new roof installation work.<br />\n1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.<br />\n1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT<br />\nbuilding roof.<br />\n1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.<br />\n1.2.1.16. Contractor to replace all existing roof scuppers with new.<br />\n1.2.1.17. Contractor to replace all existing roof drains with new.<br />\n1.2.1.18. Contractor to provide minimum of 12&rdquo; overlap between the existing adjacent roof<br />\nmembrane system and provide written confirmation the systems are compatible.<br />\n1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems<br />\nidentified on roof sections.<br />\n1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT<br />\nbuilding roof.<br />\n1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to<br />\nassist the abatement contractor to bring the sealed roofing material down from roof area<br />\nto grade with lift equipment. Coordination of this work shall be completed in concert with<br />\nall other construction activities. The subcontractor to follow directly after PPPL<br />\nabatement contractor to install new roofing system. The construction subcontractor shall<br />\nbe responsible to coordinate all work with PPPL.<br />\n1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a<br />\nminimum of 72 hours prior. All equipment that will be out of service shall be minimized.<br />\n1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.</p>\n\n<p></p>\n\n<p><strong>THERE ARE (5) COVER LETTER SECTIONS TO THE RFP.&nbsp; THERE ARE FILES ATTACHED TO EACH COVER LETTER.&nbsp; TO VIEW THE ATTACHMENTS YOU MUST </strong></p>\n\n<p></p>\n\n<p><strong>(1) FIRST DOWNLOAD EACH COVER LETTER SECTION TO YOUR DESKTOP.&nbsp; </strong></p>\n\n<p><strong>(2) <u>AFTER DOWNLOADING EACH COVER LETTER</u>--REOPENED EACH ONE (ON YOUR DESKTOP)</strong></p>\n\n<p><strong>YOU SHOULD BE ABLE TO SEE THE ATTACHED FILES ON THE RIGHT HAND SIDE OF THE COMPUTER SCREEN.&nbsp; &nbsp;BE SURE TO UTILIZE ADOBE ACROBAT SOFTWARE TO VIEW THE PDF FILES</strong></p>","origin":"detail"},"contacts":[{"name":"Jimmy Russell","role":"primary","email":"jrussell@pppl.gov","phone":"6092433963"}],"place_of_performance":{"zip":"08543","city":{"code":"60900","name":"Princeton"},"state":{"code":"NJ","name":"New Jersey"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"08540","city":"Princeton","state":"NJ","country":"USA"},"naics_codes":["236220"],"award":null,"attachments":[{"resource_id":"11c0bd3303af4e7fbbaa285acb98e652","name":"SOW_C50-C52-C60-D45 Roof Replacement Work.pdf","kind":"file","mime_type":".pdf","size_bytes":41004541,"posted_at":"2026-01-27T23:37:58.328Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/11c0bd3303af4e7fbbaa285acb98e652/download","mirrored":false}],"awards":[],"related":[{"key":"RFP27005JR","latest_notice_id":"91e1a83848304f2d84cfe6e95588d9e6","title":"RF Roof Replacement Project","solicitation_number":"RFP27-005JR","notice_type":"k","first_type":"k","first_posted":"2026-10-30","last_posted":"2026-11-09","notices":6,"due_at":"2026-12-10T21:00:00Z","due_date":"2026-12-10","closes_at":"2026-12-10T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899035","office_name":"PRINCETON LAB - DOE CONTRACTOR","naics":"238160","psc":"Y1EZ","set_aside":null,"state":"NJ","county":"34021","county_name":"Mercer County","city":"3460900","city_name":"Princeton","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-10T04:49:28.155858Z"}],"similar_open":[{"key":"36C24227B00031","latest_notice_id":"e8da78bfa52e492db77b899d5693f544","title":"Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B","solicitation_number":"36C24227B0003_1","notice_type":"o","first_type":"o","first_posted":"2026-10-29","last_posted":"2026-11-23","notices":7,"due_at":"2026-12-14T16:00:00Z","due_date":"2026-12-14","closes_at":"2026-12-14T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"236220","psc":"Y1DA","set_aside":"SDVOSBC","state":"NJ","county":"34013","county_name":"Essex County","city":"3419390","city_name":"East Orange","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"W912GB271CUB","latest_notice_id":"5fb59843227448adbcbc85d9ec18ef03","title":"FY27 Design-Build (DB) Single Award Task Order Contract (SATOC) Baden-Wurttemberg Rheinland-Pfalz","solicitation_number":"W912GB271CUB","notice_type":"r","first_type":"r","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":1,"due_at":"2026-11-25T09:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T09:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912GB","office_name":"W2SD ENDIST EUROPE","naics":"236220","psc":"Y1JZ","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"DEU","place_scope":"overseas","state_source":null,"state_evidence":"GERMANY","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"N6945027RP233","latest_notice_id":"2c675cdda8ef42a2842c5cbcb3d50727","title":"P233 AIR TRAFFIC CONTROL TOWER AND FLIGHT SIMULATOR TRAINING FACILITY","solicitation_number":"N6945027RP233","notice_type":"p","first_type":"r","first_posted":"2026-10-27","last_posted":"2026-11-10","notices":3,"due_at":"2026-11-25T16:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N69450","office_name":"NAVFACSYSCOM SOUTHEAST","naics":"236220","psc":"Y1BA","set_aside":null,"state":"MS","county":"28047","county_name":"Harrison County","city":"2806220","city_name":"Biloxi","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Keesler Air Force Base","site_key":"keesler-air-force-base-ms","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"}],"similar_open_total":195,"indexable":false}