Rock Island Arsenal (RIA) Microgrid - Sources Sought Notice
W912QR_26_SSN_MICROGRID_RIA
Department of the Army, W072 Endist Louisville. Power and Communication Line and Related Structures Construction.
Response deadline
January 8, 2026 at 1:00 PM EST
Closed 323 days ago. Posted December 18, 2025. Scheduled to archive January 23, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
7 like it are open now in power and communication line and related structures construction
- FCI Marion - Emergency Repair Tornado Damage
Federal Prison System / Bureau of Prisons, Fao
Combined synopsis and solicitationSmall businessNAICS 237130Marion, IL15BBNF26Q40900001Due in 6 daysDec 3 - KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
Department of Energy, Fermilab - DOE Contractor
SolicitationNAICS 237130Batavia, ILRFP-383167-CDCloses in 21 daysDec 18 - N6247327R0006 Project Labor Agreement Request for Information
Department of the Navy, Navfacsyscom Southwest
PresolicitationNAICS 237130San Diego, CAN6247327R0006Due in 6 daysDec 3
All 7 open in power and communication line and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237130 (power and communication line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of December 18, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
****** THIS SOURCES SOUGHT NOTICE IS UTILIZING MICROSOFT FORMS FOR RESPONSE SUBMISSION. REFER TO ELECTRONIC SUBMISSION INSTRUCTION BELOW.
Description:
A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Small Business and you are interested in this project please respond appropriately.
Project Location: Rock Island Arsenal (RIA), Rock Island, IL 61299
Project Description:
Design-Bid-Build (DBB) construction project.
Construct a microgrid system at Rock Island Arsenal (RIA) powered by natural gas-fired (NG) Reciprocating Internal Combustion Engine (RICE) generators with a total capacity of 14 Megawatts (MW), 3 MW of solar photovoltaic (PV) panels, and a 400-kilowatt (kW)/1.6 Megawatt-hour (MWh) Energy Storage System (ESS). This system will integrate with the existing 2.8 MW hydroelectric power plant. During an electric utility grid outage, the new microgrid system will provide sustained power to the entire RIA electrical distribution system when islanded from the grid, ensuring uninterrupted support for RIA’s Advanced Manufacturing Center of Excellence.
The system will include automated isolating switchgear to form the microgrid, paralleling switchgear for the generators, and other necessary controls. It is designed to support approximately 12 MW of critical load and 4 MW of non-critical load, covering the entire RIA installation’s electrical demand. The microgrid will operate as a stand-alone, autonomous electrical power system with the capability to provide a data link connection to the installation’s monitoring and control system.
Supporting facilities will include site development, utilities and connections, lighting, paving, parking, walkways, curbs, gutters, storm drainage, landscaping, and signage. The project will also incorporate all necessary building information systems, as well as fire detection, fire hydrants, and security protection and alarm systems.
Sustainable principles, including life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project. The design will adhere to the Army Sustainable Design and Development Policy and comply with all applicable laws and Executive Orders.
Anticipated Period of Performance: 902 calendar days
NAICS code: 237130 Power and Communication Line and Related Structures Construction. Size Determination is $45M.
Disclosure of the Magnitude of Construction Projects: The estimated price range is between $25,000,000 and $100,000,000. Please note that the Government expects this project to be on the upper end of that price range.
Responses should include:
- Identification and verification of the company’s small business status.
- Contractor’s Unique Entity Identifier Number and CAGE Code(s).
- Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits.
- Descriptions of Experience – Interested construction firms must provide no more than three (3) example projects with either greater than 95 percent completion or projects completed in the past five (5) years where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages, and quality of performance. Example projects must be of similar size and scope.
Projects similar in scope shall include construction of a microgrid demonstrating a majority, but not all, of the following elements:
- Natural gas (NG) centralized generators
- Installation of natural gas lines
- Information and Communication Systems
- Installation and Commissioning of Microgrid systems
- Installation of necessary breakers and switchgear
- Installation of Photovoltaic systems
- Installation of centralized generation to provide power to multiple buildings with controls
- Installation of electrical and telecommunication duct bank and controls for Microgrids
- Implementation of control systems for electrical peak shaving
Projects similar in size to this project include:
Construction of projects for new construction natural gas generation systems which meets or exceeds the following size elements:
- Installation and construction of natural gas generators able to handle loads of .5 – 2.5MW
c. Based on the information above, for each project submitted, include:
-
- Current percentage of construction complete and the date when it was or will be completed.
- Scope of the project.
- Size of the project.
- The dollar value of the construction contract and whether it was design/bid/build or design-build.
- The percentage of work that was self-performed as project and/or construction management services or physical construction type work.
- Identify the number of subcontractors by construction trade utilized for each project.
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished.
NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed.
Electronic Submission Instructions:
Provide responses via Microsoft forms using the below link or QR code (attached as document label "RIA Microgrid SSN - QR code"):
Link: https://forms.osi.apps.mil/r/jCRhKtQvrM
Please note this is NOT a Request for Proposal and does not constitute any commitment by the Government.
Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this market survey.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- RIA Microgrid SSN - QR Code.pdf288 KB, December 18, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
December 18, 2025
Sources sought
Due January 8, 2026 at 1:00 PM EST. SAM.gov, notice 7442b965e01b49f3b3629168889225d3
1 revision on SAM
- December 18, 2025: publish, sources sought