Solicitation
KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
RFP-383167-CD
Department of Energy, Fermilab - DOE Contractor. Power and Communication Line and Related Structures Construction.
Offers due
December 18, 2026 at 5:00 PM EST
23 days from now. Posted November 5, 2026, first published November 2, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATIONSolicitationNAICS 23822Batavia, IL378854_MRCloses in 8 daysDec 3
- UTILITY EXCAVATION AND REPAIR SERVICES IDIQSolicitationSmall businessNAICS 238910Batavia, IL385439GMKCloses in 12 daysDec 7
- Request for Information - Vacuum VesselsPresolicitationNAICS 332710Batavia, ILRFIVacuumVesselsCloses in 12 daysDec 7
Similar, open now
- FCI Marion - Emergency Repair Tornado Damage
Federal Prison System / Bureau of Prisons, Fao
Combined synopsis and solicitationSmall businessNAICS 237130Marion, IL15BBNF26Q40900001Closes in 8 daysDec 3 - N6247327R0006 Project Labor Agreement Request for Information
Department of the Navy, Navfacsyscom Southwest
PresolicitationNAICS 237130San Diego, CAN6247327R0006Closes in 8 daysDec 3 - DLA DWCF B1907 Backup Power Generator, Yokosuka, Japan
Department of the Army, W2SN Endist Japan
Sources soughtNAICS 237130Outside the USW912HV27Z0002Closes in 16 daysDec 11
All 6 open in power and communication line and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. To compete, read the solicitation and its attachments, send questions to the contact named on the notice in writing, and submit the offer the way the solicitation says before the deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237130 (power and communication line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders have 46 days from the day the solicitation was posted, November 2, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting.
This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.
The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.
The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.
This project includes the following milestones:
Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.
Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin.
Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward).
Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed..
Milestone 5 – 30th September 2029; This milestone marks the completion of the project.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Exhibit Q- Sample Firm-Fixed-Price Subcontract.pdf747 KB, November 2, 2026
- Exhibit P- Compliance With Federal Anti-Discrimination Laws- PRC EXH 469.pdf278 KB, November 2, 2026
- Exhibit O- Small Business Subcontracting Plan Template.pdf517 KB, November 2, 2026
- Exhibit N- Davis Bacon Wage Rater_ IL202600011.pdf1.4 MB, November 2, 2026
- Exhibit M_Performance Bond_FL-40.pdf743 KB, November 2, 2026
- Exhibit L_FL-42 (Rev 1.25) - Payment Bond.pdf1.6 MB, November 2, 2026
- Exhibit K_Bond Bid FL-41.pdf749 KB, November 2, 2026
- Exhibit J- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf406 KB, November 2, 2026
- Exhibit I- SARC_Subcontractor Annual RepsCerts.pdf471 KB, November 2, 2026
- Exhibit H- Price Proposal Form.pdf469 KB, November 2, 2026
- Exhibit G - Fermilab Subcontractor Safety Information Questionnaire.pdf1.4 MB, November 2, 2026
- Exhibit F - Statement of Acknowledgment (SF-1413).pdf699 KB, November 2, 2026
- Exhibit E - Construction Insurance Requirements.pdf245 KB, November 2, 2026
- Exhibit D- FFDG General Terms and Conditions for Construction (10.2026).pdf303 KB, November 2, 2026
- Exhibit C- Specification Set.pdf11.6 MB, November 2, 2026
- Exhibit B- Construction Drawing Set.pdf72.2 MB, November 2, 2026
- Exhibit A- Scope of Work- UIP Subproject 2 KRS.pdf321 KB, November 2, 2026
- 383167 RFP 1.0 RFP Instructions to Offerors.pdf330 KB, November 2, 2026
- Amend 01 to RFP 383167-CD.pdf187 KB, November 5, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 2, 2026
Solicitation
Due December 18, 2026 at 5:00 PM EST. SAM.gov, notice 0d455f653c70449796f54eea428f0d56
1 revision on SAM
- November 2, 2026: publish, solicitation
November 5, 2026
Solicitation
Due December 18, 2026 at 5:00 PM EST. SAM.gov, notice 558314f2c9aa4128b07bd410f81a4ccc
2 revisions on SAM
- November 5, 2026: publish, solicitation
- November 2, 2026: publish, solicitation
Points of contact
- Chris Daleycdaley@fnal.gov6308404256