{"canonical":"https://sealedbidder.com/opportunities/rfp383167cd","key":"RFP383167CD","url":"https://sealedbidder.com/opportunities/rfp383167cd","title":"KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS","solicitation_number":"RFP-383167-CD","notice_type":"o","open":true,"removed":false,"removed_at":null,"response_deadline":"2026-12-18T22:00:00Z","first_posted":"2026-11-02","last_posted":"2026-11-05","department":"ENERGY, DEPARTMENT OF","subagency":"ENERGY, DEPARTMENT OF","office":"FERMILAB - DOE CONTRACTOR","naics":"237130","psc":"Z2MZ","set_aside":null,"place_state":"IL","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"17089","place_county_name":"Kane County","place_city":"1704078","place_city_name":"Batavia","winner":null,"award_amount":null,"publications":[{"notice_id":"0d455f653c70449796f54eea428f0d56","title":"KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS","solicitation_number":"RFP-383167-CD","notice_type":"o","base_type":"o","posted":"2026-11-02","posted_at":"2026-11-02T22:30:13.106Z","due_at":"2026-12-18T22:00:00Z","due_date":"2026-12-18","cancelled":false,"archived":false,"archive_date":"2027-01-02","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0d455f653c70449796f54eea428f0d56/view","enriched":true,"history":[{"index":1,"title":"KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-02T22:30:13.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"0d455f653c70449796f54eea428f0d56","solicitation_number":"RFP-383167-CD"}]},{"notice_id":"558314f2c9aa4128b07bd410f81a4ccc","title":"KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS","solicitation_number":"RFP-383167-CD","notice_type":"o","base_type":"o","posted":"2026-11-05","posted_at":"2026-11-05T14:39:37.967Z","due_at":"2026-12-18T22:00:00Z","due_date":"2026-12-18","cancelled":false,"archived":false,"archive_date":"2027-01-02","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/558314f2c9aa4128b07bd410f81a4ccc/view","enriched":true,"history":[{"index":2,"title":"KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-05T14:39:37.967Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"558314f2c9aa4128b07bd410f81a4ccc","solicitation_number":"RFP-383167-CD","parent_opportunity_id":"0d455f653c70449796f54eea428f0d56"},{"index":1,"title":"KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-02T22:30:13.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"0d455f653c70449796f54eea428f0d56","solicitation_number":"RFP-383167-CD"}]}],"latest_notice_id":"558314f2c9aa4128b07bd410f81a4ccc","first_type":"o","notices":[{"dates":{"posted":"2026-11-02","posted_at":"2026-11-02T22:30:13.106Z","created_at":"2026-11-02T22:14:35.107Z","modified_at":"2026-11-02T22:30:13.112Z","response_deadline":{"raw":"2026-12-18T16:00:00-06:00","utc":"2026-12-18T22:00:00Z","date":"2026-12-18","time":"16:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/0d455f653c70449796f54eea428f0d56/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-01-02","archive_type":"auto15"},"history":[{"index":1,"title":"KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-02T22:30:13.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"0d455f653c70449796f54eea428f0d56","solicitation_number":"RFP-383167-CD"}],"contacts":[{"name":"Chris Daley","role":"primary","email":"cdaley@fnal.gov","phone":"6308404256"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"0d455f653c70449796f54eea428f0d56","lineage_id":"0d455f653c70449796f54eea428f0d56","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-03T06:33:55.965827436Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"8c2d6f0949016b777cd0278d9ce3a816f8d277d7f41303311ade0229857ea40e","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-11-03T04:48:34.968936277Z"},"description":{"html":"<p>This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab&rsquo;s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.</p>\n\n<p>The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.</p>\n\n<p>The critical schedule constraint for construction of this project is Fermilab&rsquo;s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.&nbsp; The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.</p>\n\n<p>This project includes the following milestones:</p>\n\n<p>Milestone 1 &ndash; 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.</p>\n\n<p>Milestone 2 &ndash; 4th January 2028; This milestone marks the point where access is permitted inside&nbsp;Kautz Road Substation yard and construction work may begin.</p>\n\n<p>Milestone 3 &ndash; 31st of March 2028; This milestone marks the completion of building foundation and&nbsp;ready for placement of the new prefabricated control house building (provided by FermiForward).</p>\n\n<p>Milestone 4 &ndash; 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use&nbsp;and Possession (AUP) of the KRS Substation facility, including all remedial work following removal&nbsp;of site trailers, but not including seasonal work and all final punch list items addressed..</p>\n\n<p>Milestone 5 &ndash; 30th September 2029; This milestone marks the completion of the project.</p>","text":"This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.\n\nThe General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.\n\nThe critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.\n\nThis project includes the following milestones:\n\nMilestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.\n\nMilestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin.\n\nMilestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward).\n\nMilestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed..\n\nMilestone 5 – 30th September 2029; This milestone marks the completion of the project.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"RFP-383167-CD","place_of_performance":{"zip":"60510","city":{"code":"4078","name":"Batavia"},"state":{"code":"IL","name":"Illinois"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2MZ"},{"dates":{"posted":"2026-11-05","posted_at":"2026-11-05T14:39:37.967Z","created_at":"2026-11-03T15:21:28.164Z","modified_at":"2026-11-05T14:39:37.975Z","response_deadline":{"raw":"2026-12-18T16:00:00-06:00","utc":"2026-12-18T22:00:00Z","date":"2026-12-18","time":"16:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/558314f2c9aa4128b07bd410f81a4ccc/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_id":"500047667","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-01-02","archive_type":"auto15"},"history":[{"index":2,"title":"KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-05T14:39:37.967Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"558314f2c9aa4128b07bd410f81a4ccc","solicitation_number":"RFP-383167-CD","parent_opportunity_id":"0d455f653c70449796f54eea428f0d56"},{"index":1,"title":"KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-02T22:30:13.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"0d455f653c70449796f54eea428f0d56","solicitation_number":"RFP-383167-CD"}],"contacts":[{"name":"Chris Daley","role":"primary","email":"cdaley@fnal.gov","phone":"6308404256"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"558314f2c9aa4128b07bd410f81a4ccc","lineage_id":"0d455f653c70449796f54eea428f0d56","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T09:41:32.009758647Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"70dbd40c9359ae620f2648369525e293b1bc329747112f935cb4cd9ceccac5d6","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-11T09:41:32.009758647Z","first_seen_at":"2026-11-06T04:42:59.950874882Z"},"description":{"html":"<p>November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting.</p>\n\n<p>This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab&rsquo;s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.</p>\n\n<p>The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.</p>\n\n<p>The critical schedule constraint for construction of this project is Fermilab&rsquo;s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.&nbsp; The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.</p>\n\n<p>This project includes the following milestones:</p>\n\n<p>Milestone 1 &ndash; 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.</p>\n\n<p>Milestone 2 &ndash; 4th January 2028; This milestone marks the point where access is permitted inside&nbsp;Kautz Road Substation yard and construction work may begin.</p>\n\n<p>Milestone 3 &ndash; 31st of March 2028; This milestone marks the completion of building foundation and&nbsp;ready for placement of the new prefabricated control house building (provided by FermiForward).</p>\n\n<p>Milestone 4 &ndash; 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use&nbsp;and Possession (AUP) of the KRS Substation facility, including all remedial work following removal&nbsp;of site trailers, but not including seasonal work and all final punch list items addressed..</p>\n\n<p>Milestone 5 &ndash; 30th September 2029; This milestone marks the completion of the project.</p>","text":"November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting.\n\nThis scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.\n\nThe General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.\n\nThe critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.\n\nThis project includes the following milestones:\n\nMilestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.\n\nMilestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin.\n\nMilestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward).\n\nMilestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed..\n\nMilestone 5 – 30th September 2029; This milestone marks the completion of the project.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"RFP-383167-CD","place_of_performance":{"zip":"60510","city":{"code":"4078","name":"Batavia"},"state":{"code":"IL","name":"Illinois"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2MZ"}],"due_at":"2026-12-18T22:00:00Z","due_date":"2026-12-18","closes_at":"2026-12-18T22:00:00Z","awardable":true,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-11-06T04:46:59.158685Z","principal_notice_id":"558314f2c9aa4128b07bd410f81a4ccc","description":{"text":"November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting.\n\nThis scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.\n\nThe General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.\n\nThe critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.\n\nThis project includes the following milestones:\n\nMilestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.\n\nMilestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin.\n\nMilestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward).\n\nMilestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed..\n\nMilestone 5 – 30th September 2029; This milestone marks the completion of the project.","html":"<p>November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting.</p>\n\n<p>This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab&rsquo;s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.</p>\n\n<p>The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.</p>\n\n<p>The critical schedule constraint for construction of this project is Fermilab&rsquo;s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.&nbsp; The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.</p>\n\n<p>This project includes the following milestones:</p>\n\n<p>Milestone 1 &ndash; 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.</p>\n\n<p>Milestone 2 &ndash; 4th January 2028; This milestone marks the point where access is permitted inside&nbsp;Kautz Road Substation yard and construction work may begin.</p>\n\n<p>Milestone 3 &ndash; 31st of March 2028; This milestone marks the completion of building foundation and&nbsp;ready for placement of the new prefabricated control house building (provided by FermiForward).</p>\n\n<p>Milestone 4 &ndash; 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use&nbsp;and Possession (AUP) of the KRS Substation facility, including all remedial work following removal&nbsp;of site trailers, but not including seasonal work and all final punch list items addressed..</p>\n\n<p>Milestone 5 &ndash; 30th September 2029; This milestone marks the completion of the project.</p>","origin":"detail"},"contacts":[{"name":"Chris Daley","role":"primary","email":"cdaley@fnal.gov","phone":"6308404256"}],"place_of_performance":{"zip":"60510","city":{"code":"4078","name":"Batavia"},"state":{"code":"IL","name":"Illinois"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"naics_codes":["237130"],"award":null,"attachments":[{"resource_id":"5260f2d85df0471b8cbb99146b39a7ca","name":"Exhibit Q- Sample Firm-Fixed-Price Subcontract.pdf","kind":"file","mime_type":".pdf","size_bytes":765311,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5260f2d85df0471b8cbb99146b39a7ca/download","mirrored":false},{"resource_id":"63cb1174e5884974bd0fdfc416eb6366","name":"Exhibit P- Compliance With Federal Anti-Discrimination Laws- PRC EXH 469.pdf","kind":"file","mime_type":".pdf","size_bytes":284258,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/63cb1174e5884974bd0fdfc416eb6366/download","mirrored":false},{"resource_id":"674c1186503b4001b930901660fbc19e","name":"Exhibit O- Small Business Subcontracting Plan Template.pdf","kind":"file","mime_type":".pdf","size_bytes":529425,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/674c1186503b4001b930901660fbc19e/download","mirrored":false},{"resource_id":"3222217754c847778a85904baab16189","name":"Exhibit N- Davis Bacon Wage Rater_ IL202600011.pdf","kind":"file","mime_type":".pdf","size_bytes":1477633,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3222217754c847778a85904baab16189/download","mirrored":false},{"resource_id":"bec7d08541db49969a793d11ad0da744","name":"Exhibit M_Performance Bond_FL-40.pdf","kind":"file","mime_type":".pdf","size_bytes":760783,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bec7d08541db49969a793d11ad0da744/download","mirrored":false},{"resource_id":"7289dd32be4046d496a9ba0a7ee72bd6","name":"Exhibit L_FL-42 (Rev 1.25) - Payment Bond.pdf","kind":"file","mime_type":".pdf","size_bytes":1688977,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7289dd32be4046d496a9ba0a7ee72bd6/download","mirrored":false},{"resource_id":"3d36a4add5d246ba97e359a583fefbd3","name":"Exhibit K_Bond Bid FL-41.pdf","kind":"file","mime_type":".pdf","size_bytes":767109,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3d36a4add5d246ba97e359a583fefbd3/download","mirrored":false},{"resource_id":"278a9d9c6fef44cdaf5cc4f67e3aad44","name":"Exhibit J- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf","kind":"file","mime_type":".pdf","size_bytes":415860,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/278a9d9c6fef44cdaf5cc4f67e3aad44/download","mirrored":false},{"resource_id":"5251feffacd547918e8cdb498d768bee","name":"Exhibit I- SARC_Subcontractor Annual RepsCerts.pdf","kind":"file","mime_type":".pdf","size_bytes":482675,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5251feffacd547918e8cdb498d768bee/download","mirrored":false},{"resource_id":"0f3bed1b3dd949c7ba8b73408f4a4e54","name":"Exhibit H- Price Proposal Form.pdf","kind":"file","mime_type":".pdf","size_bytes":480607,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0f3bed1b3dd949c7ba8b73408f4a4e54/download","mirrored":false},{"resource_id":"a330217b93f54c469095b3e7a79ab55e","name":"Exhibit G - Fermilab Subcontractor Safety Information Questionnaire.pdf","kind":"file","mime_type":".pdf","size_bytes":1457163,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a330217b93f54c469095b3e7a79ab55e/download","mirrored":false},{"resource_id":"3331e48b1eee4affbf14210c85d8b4fa","name":"Exhibit F - Statement of Acknowledgment (SF-1413).pdf","kind":"file","mime_type":".pdf","size_bytes":715281,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3331e48b1eee4affbf14210c85d8b4fa/download","mirrored":false},{"resource_id":"b6d376c573cc4e2298bdaad39bafef11","name":"Exhibit E - Construction Insurance Requirements.pdf","kind":"file","mime_type":".pdf","size_bytes":250976,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b6d376c573cc4e2298bdaad39bafef11/download","mirrored":false},{"resource_id":"ce3e5a0863874e868cd4b57d168f66b4","name":"Exhibit D- FFDG General Terms and Conditions for Construction (10.2026).pdf","kind":"file","mime_type":".pdf","size_bytes":310762,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ce3e5a0863874e868cd4b57d168f66b4/download","mirrored":false},{"resource_id":"164f37fd91ad497a93c1f13cecc16c7d","name":"Exhibit C- Specification Set.pdf","kind":"file","mime_type":".pdf","size_bytes":12161801,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/164f37fd91ad497a93c1f13cecc16c7d/download","mirrored":false},{"resource_id":"fb3177e601dd4297a9be201ac4623545","name":"Exhibit B- Construction Drawing Set.pdf","kind":"file","mime_type":".pdf","size_bytes":75747068,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fb3177e601dd4297a9be201ac4623545/download","mirrored":false},{"resource_id":"3b2fd4c9090c4f7f85ac2b0c1897d7b9","name":"Exhibit A- Scope of Work- UIP Subproject 2 KRS.pdf","kind":"file","mime_type":".pdf","size_bytes":328377,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3b2fd4c9090c4f7f85ac2b0c1897d7b9/download","mirrored":false},{"resource_id":"68a860a2b6314770a764d48e9c060c95","name":"383167 RFP 1.0 RFP Instructions to Offerors.pdf","kind":"file","mime_type":".pdf","size_bytes":337544,"posted_at":"2026-11-02T22:30:13.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/68a860a2b6314770a764d48e9c060c95/download","mirrored":false},{"resource_id":"982a6a4085674fbc9cd7529fc2177415","name":"Amend 01 to RFP 383167-CD.pdf","kind":"file","mime_type":".pdf","size_bytes":191925,"posted_at":"2026-11-05T14:39:37.967Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/982a6a4085674fbc9cd7529fc2177415/download","mirrored":false}],"awards":[],"related":[{"key":"378854MR","latest_notice_id":"e1f72176eb994530a1340e9bf2a51a91","title":"PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION","solicitation_number":"378854_MR","notice_type":"o","first_type":"o","first_posted":"2026-10-08","last_posted":"2026-11-16","notices":5,"due_at":"2026-12-03T20:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"23822","psc":"K056","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"385439GMK","latest_notice_id":"e17f8904e0134bd890eafbae01571c74","title":"UTILITY EXCAVATION AND REPAIR SERVICES IDIQ","solicitation_number":"385439GMK","notice_type":"o","first_type":"o","first_posted":"2026-11-06","last_posted":"2026-11-06","notices":1,"due_at":"2026-12-07T21:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"238910","psc":"Y1PZ","set_aside":"SBA","state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-07T04:54:53.607561Z"},{"key":"RFIVACUUMVESSELS","latest_notice_id":"ea26e0b581dc4104b03163f640a7b274","title":"Request for Information - Vacuum Vessels","solicitation_number":"RFIVacuumVessels","notice_type":"p","first_type":"p","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-12-07T22:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"332710","psc":"AJ13","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"385515GMK","latest_notice_id":"65747435c0224a859780416b36f2d6bf","title":"Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade","solicitation_number":"385515GMK","notice_type":"o","first_type":"o","first_posted":"2026-10-22","last_posted":"2026-11-11","notices":3,"due_at":"2026-12-09T21:00:00Z","due_date":"2026-12-09","closes_at":"2026-12-09T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"236220","psc":"Z2AZ","set_aside":"SBA","state":"IL","county":"17089","county_name":"Kane County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-12T04:43:37.498412Z"},{"key":"RFP389882","latest_notice_id":"c558db76dbe94287afb9c6eeaa5b8e49","title":"Cryogenic Mezzanine Structure","solicitation_number":"RFP389882","notice_type":"o","first_type":"o","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-11T22:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"33271","psc":"AJ13","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open":[{"key":"15BBNF26Q40900001","latest_notice_id":"2e004e540d5d4c2f88bf44f758d84ac3","title":"FCI Marion - Emergency Repair Tornado Damage","solicitation_number":"15BBNF26Q40900001","notice_type":"k","first_type":"k","first_posted":"2026-10-05","last_posted":"2026-10-05","notices":1,"due_at":"2026-12-03T17:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1540","sub_name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office_key":"o-15BFA0","office_name":"FAO","naics":"237130","psc":"Z2FF","set_aside":"SBA","state":"IL","county":"17199","county_name":"Williamson County","city":"1746916","city_name":"Marion","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-06T03:51:26.035830Z"},{"key":"N6247327R0006","latest_notice_id":"1484bb1bdb784f7c965ddab80dcfcf54","title":"N6247327R0006 Project Labor Agreement Request for Information","solicitation_number":"N6247327R0006","notice_type":"p","first_type":"r","first_posted":"2026-09-15","last_posted":"2026-11-19","notices":2,"due_at":"2026-12-03T22:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62473","office_name":"NAVFACSYSCOM SOUTHWEST","naics":"237130","psc":"Y1MZ","set_aside":null,"state":"CA","county":"06073","county_name":"San Diego County","city":"0666000","city_name":"San Diego","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"W912HV27Z0002","latest_notice_id":"29c3ca3500084b549344c86608cdfd32","title":"DLA DWCF B1907 Backup Power Generator, Yokosuka, Japan","solicitation_number":"W912HV27Z0002","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-12-11T14:59:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T14:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HV","office_name":"W2SN ENDIST JAPAN","naics":"237130","psc":"Y1MZ","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"JPN","place_scope":"overseas","state_source":null,"state_evidence":"JAPAN","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"}],"similar_open_total":6,"indexable":true}