Award notice, 8(a) sole source
Building 37000 Plant 1 Repair Restrooms
W912PP26QA029
Department of the Army, W075 Endist Albuquerque. Commercial and Institutional Building Construction.
Awarded
$188,955.16 on the award notice, September 18, 2026, contract W912PP26PA033
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one was awarded in 2026
194 like it are open now in commercial and institutional building construction
- Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NF
Forest Service, Usda-Fs, Csa Southwest 7
Combined synopsis and solicitationSmall businessNAICS 236220Santa Fe, NM127EAX26Q0069Due todayNov 25 - Request for Qualification - MHMV230026 Construct Permanent Party Enlisted Dorm at Kirtland AFB, New Mexico
Department of the Air Force, FA9401 377 MSG PK
SolicitationNAICS 236220New MexicoFA940127R0001Due todayNov 25 - P233 AIR TRAFFIC CONTROL TOWER AND FLIGHT SIMULATOR TRAINING FACILITY
Department of the Navy, Navfacsyscom Southeast
Due todayNov 25
All 194 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Award notice. Who won, when, and for how much. Glossary
- Who may compete
- 8(a) sole source. Awarded to one 8(a) firm without competition. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. Open 8(a) sole source opportunities
- How it ended
- Awarded to Evergreen Contractors LLC on September 18, 2026.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.
The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 37000 Plant 1 Repair Restrooms.
- Contractor must remove and dispose of existing flooring. (Abatement TBD) Clean, degrease, and prep slab to received new epoxy flooring.
- Contractor must remove and dispose of existing fixtures. Preserve existing wall tiles and ceiling grid/lighting.
- Contractor must demolish existing partition wall. Salvage all three (3) existing doors in room P2.
- Contractor must remove and dispose of existing kitchenette. Existing plumbing lines must be capped.
- Construction
- Contractor must provide and install four (4) new water closets (WC-1) and associated plumbing.
- Contractor must provide and install four (4) new lavatories (SINK-1) and faucets (FC-1) and associated plumbing.
- Contractor must provide and install two (2) new urinals and associated plumbing. Provide and install new urinal screen (US-1) at each urinal.
- Contractor must provide and install two (2) new toilet partitions (TPART). One to be installed to meet requirements of ANSI 117.1
- Contractor must provide and install new partition walls utilizing 3-5/8” metal studs and gypsum wall board. Fill with acoustic batt insulation. Where required to facilitate plumbing utilities or fixture hangers, 6” metal studs may be used.
- Contractor must provide and install new doors and re-install salvaged doors. New doors to match characteristics of existing door.
- Contractor must provide and install new epoxy flooring (EP-1). Slab must be prepared to receive finish per manufacturer instructions.
- Contractor must install government provided trash cans, toilet paper, soap and paper towel dispensers.
- Contractor must provide and apply paint (PT-1) on indicated walls.
- Contractor must provide and install new GFCI receptacles.
- Contractor must provide and install new mop sink (SINK-2), mop sink faucet (FC-2) and associated plumbing. Provide and install mop hooks.
-
- Contractor must provide and install new mirrors.
- Contractor must provide and install new ADA grab bars.
- Contractor must provide and install new restroom signage for each restroom per KAFB standards.
- Existing ceiling to remain. Contractor must reconfigure lighting and HVAC to accommodate new space layout. Provide and install new lighting switches as required. Rebalance HVAC.
- Contractor must provide and install new grid mounted light fixture.
- Contractor must provide and install new exhaust fans, tie into existing building exhaust system.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 18, 2026
Award notice
Awarded to Evergreen Contractors LLC for $188,955. SAM.gov, notice 4a1c88fa5b1544fba273ba1548239255
1 revision on SAM
- September 18, 2026: publish, award notice
Points of contact
- Glenda D. Kohlieberglenda.d.kohlieber@usace.army.mil5754796095102