{"canonical":"https://sealedbidder.com/opportunities/w912pp26qa029","key":"W912PP26QA029","url":"https://sealedbidder.com/opportunities/w912pp26qa029","title":"Building 37000 Plant 1 Repair Restrooms","solicitation_number":"W912PP26QA029","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":null,"first_posted":"2026-09-18","last_posted":"2026-09-18","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W075 ENDIST ALBUQUERQUE","naics":"236220","psc":"Y1AZ","set_aside":"8AN","place_state":"NM","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"35001","place_county_name":"Bernalillo County","place_city":"3536300","place_city_name":"Kirtland AFB","winner":"EVERGREEN CONTRACTORS LLC","award_amount":"188955.16","publications":[{"notice_id":"4a1c88fa5b1544fba273ba1548239255","title":"Building 37000 Plant 1 Repair Restrooms","solicitation_number":"W912PP26QA029","notice_type":"a","base_type":"a","posted":"2026-09-18","posted_at":"2026-09-18T17:39:34.803Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2026-10-03","removed_at":null,"award_number":"W912PP26PA033","awardee_name":"EVERGREEN CONTRACTORS LLC","amount":"188955.16","link_sam":"https://sam.gov/workspace/contract/opp/4a1c88fa5b1544fba273ba1548239255/view","enriched":true,"history":[{"index":1,"title":"Building 37000 Plant 1 Repair Restrooms","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-18T17:39:34.803Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"4a1c88fa5b1544fba273ba1548239255","solicitation_number":"W912PP26QA029"}]}],"latest_notice_id":"4a1c88fa5b1544fba273ba1548239255","first_type":"a","notices":[{"award":{"date":"2026-09-18","amount":"188955.16","number":"W912PP26PA033","awardee":{"raw":"EVERGREEN CONTRACTORS LLC Albuquerque NM 87113 USA","uei":"N2NXJ5E8NCV6","cage":"7FCW9","name":"EVERGREEN CONTRACTORS LLC","location":{"zip":"87113","city":{"name":"Albuquerque"},"state":{"code":"NM","name":"New Mexico"},"country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2026-09-18","posted_at":"2026-09-18T17:39:34.803Z","award_date":"2026-09-18","created_at":"2026-09-18T17:31:36.653Z","modified_at":"2026-09-18T17:39:34.805Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/4a1c88fa5b1544fba273ba1548239255/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Building 37000 Plant 1 Repair Restrooms","agency":{"office":{"code":"W912PP","name":"W075 ENDIST ALBUQUERQUE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"87109-3435","city":"ALBUQUERQUE","state":"NM","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-10-03","archive_type":"auto15"},"history":[{"index":1,"title":"Building 37000 Plant 1 Repair Restrooms","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-18T17:39:34.803Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"4a1c88fa5b1544fba273ba1548239255","solicitation_number":"W912PP26QA029"}],"contacts":[{"name":"Glenda D. Kohlieber","role":"primary","email":"glenda.d.kohlieber@usace.army.mil","phone":"5754796095102"}],"base_type":{"code":"a","label":"Award Notice"},"notice_id":"4a1c88fa5b1544fba273ba1548239255","set_aside":{"code":"8AN","label":"8(a) Sole Source (FAR 19.8)"},"lineage_id":"4a1c88fa5b1544fba273ba1548239255","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-23T08:15:52.859332747Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"61d48ea1a565394e13a52756fdaf0a96-26\"","fetched_at":"2026-10-03T03:46:48.862698055Z","row_sha256":"9efe0c5cdb6aa663cc577bd86da3be4fbddfd6308b0c68a42950044d7d55c607","last_modified":"2026-10-03T03:30:32Z"},"updated_at":"2026-10-03T03:46:48.862698055Z","first_seen_at":"2026-09-19T03:44:47.683076Z"},"description":{"html":"<p>This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.</p>\n\n<p>The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 37000 Plant 1 Repair Restrooms.&nbsp;&nbsp;</p>\n\n<ol>\n\t<li>Contractor must remove and dispose of existing flooring. (Abatement TBD) Clean, degrease, and prep slab to received new epoxy flooring.</li>\n\t<li>Contractor must remove and dispose of existing fixtures. Preserve existing wall tiles and ceiling grid/lighting.</li>\n\t<li>Contractor must demolish existing partition wall. Salvage all three (3) existing doors in room P2.</li>\n\t<li>Contractor must remove and dispose of existing kitchenette. Existing plumbing lines must be capped.</li>\n</ol>\n\n<ol>\n\t<li>Construction\n\t<ol>\n\t\t<li>Contractor must provide and install four (4) new water closets (WC-1) and associated plumbing.&nbsp;</li>\n\t\t<li>Contractor must provide and install four (4) new lavatories (SINK-1) and faucets (FC-1) and associated plumbing.&nbsp;</li>\n\t\t<li>Contractor must provide and install two (2) new urinals and associated plumbing. Provide and install new urinal screen (US-1) at each urinal.&nbsp;</li>\n\t\t<li>Contractor must provide and install two (2) new toilet partitions (TPART). One to be installed to meet requirements of ANSI 117.1</li>\n\t\t<li>Contractor must provide and install new partition walls utilizing 3-5/8&rdquo; metal studs and gypsum wall board. Fill with acoustic batt insulation. Where required to facilitate plumbing utilities or fixture hangers, 6&rdquo; metal studs may be used.</li>\n\t\t<li>Contractor must provide and install new doors and re-install salvaged doors. New doors to match characteristics of existing door.</li>\n\t\t<li>Contractor must provide and install new epoxy flooring (EP-1). Slab must be prepared to receive finish per manufacturer instructions.</li>\n\t\t<li>Contractor must install government provided trash cans, toilet paper, soap and paper towel dispensers.</li>\n\t\t<li>Contractor must provide and apply paint (PT-1) on indicated walls.</li>\n\t\t<li>Contractor must provide and install new GFCI receptacles.</li>\n\t\t<li>Contractor must provide and install new mop sink (SINK-2), mop sink faucet (FC-2) and associated plumbing. Provide and install mop hooks.</li>\n\t</ol>\n\t</li>\n\t<li>\n\t<ol>\n\t\t<li>Contractor must provide and install new mirrors.</li>\n\t\t<li>Contractor must provide and install new ADA grab bars.</li>\n\t\t<li>Contractor must provide and install new restroom signage for each restroom per KAFB standards.</li>\n\t\t<li>Existing ceiling to remain.&nbsp; Contractor must reconfigure lighting and HVAC to accommodate new space layout.&nbsp; Provide and install new lighting switches as required.&nbsp; Rebalance HVAC.</li>\n\t\t<li>Contractor must provide and install new grid mounted light fixture.</li>\n\t\t<li>Contractor must provide and install new exhaust fans, tie into existing building exhaust system.</li>\n\t</ol>\n\t</li>\n</ol>","text":"This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.\n\nThe contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 37000 Plant 1 Repair Restrooms.\n\n• Contractor must remove and dispose of existing flooring. (Abatement TBD) Clean, degrease, and prep slab to received new epoxy flooring.\n\n• Contractor must remove and dispose of existing fixtures. Preserve existing wall tiles and ceiling grid/lighting.\n\n• Contractor must demolish existing partition wall. Salvage all three (3) existing doors in room P2.\n\n• Contractor must remove and dispose of existing kitchenette. Existing plumbing lines must be capped.\n\n• Construction\n\n• Contractor must provide and install four (4) new water closets (WC-1) and associated plumbing.\n\n• Contractor must provide and install four (4) new lavatories (SINK-1) and faucets (FC-1) and associated plumbing.\n\n• Contractor must provide and install two (2) new urinals and associated plumbing. Provide and install new urinal screen (US-1) at each urinal.\n\n• Contractor must provide and install two (2) new toilet partitions (TPART). One to be installed to meet requirements of ANSI 117.1\n\n• Contractor must provide and install new partition walls utilizing 3-5/8” metal studs and gypsum wall board. Fill with acoustic batt insulation. Where required to facilitate plumbing utilities or fixture hangers, 6” metal studs may be used.\n\n• Contractor must provide and install new doors and re-install salvaged doors. New doors to match characteristics of existing door.\n\n• Contractor must provide and install new epoxy flooring (EP-1). Slab must be prepared to receive finish per manufacturer instructions.\n\n• Contractor must install government provided trash cans, toilet paper, soap and paper towel dispensers.\n\n• Contractor must provide and apply paint (PT-1) on indicated walls.\n\n• Contractor must provide and install new GFCI receptacles.\n\n• Contractor must provide and install new mop sink (SINK-2), mop sink faucet (FC-2) and associated plumbing. Provide and install mop hooks.\n\n•\n\n• Contractor must provide and install new mirrors.\n\n• Contractor must provide and install new ADA grab bars.\n\n• Contractor must provide and install new restroom signage for each restroom per KAFB standards.\n\n• Existing ceiling to remain. Contractor must reconfigure lighting and HVAC to accommodate new space layout. Provide and install new lighting switches as required. Rebalance HVAC.\n\n• Contractor must provide and install new grid mounted light fixture.\n\n• Contractor must provide and install new exhaust fans, tie into existing building exhaust system.","origin":"detail"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"W912PP26QA029","place_of_performance":{"zip":"87117","city":{"name":"Kirtland AFB"},"state":{"code":"NM"},"country":{"code":"USA"}},"product_service_code":"Y1AZ"}],"due_at":null,"due_date":null,"closes_at":null,"awardable":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PP","office_name":"W075 ENDIST ALBUQUERQUE","state":"NM","county":"35001","county_name":"Bernalillo County","city":"3536300","city_name":"Kirtland AFB","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"N2NXJ5E8NCV6","amount":"188955.16","linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-04T05:15:12.691697Z","principal_notice_id":"4a1c88fa5b1544fba273ba1548239255","description":{"text":"This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.\n\nThe contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 37000 Plant 1 Repair Restrooms.\n\n• Contractor must remove and dispose of existing flooring. (Abatement TBD) Clean, degrease, and prep slab to received new epoxy flooring.\n\n• Contractor must remove and dispose of existing fixtures. Preserve existing wall tiles and ceiling grid/lighting.\n\n• Contractor must demolish existing partition wall. Salvage all three (3) existing doors in room P2.\n\n• Contractor must remove and dispose of existing kitchenette. Existing plumbing lines must be capped.\n\n• Construction\n\n• Contractor must provide and install four (4) new water closets (WC-1) and associated plumbing.\n\n• Contractor must provide and install four (4) new lavatories (SINK-1) and faucets (FC-1) and associated plumbing.\n\n• Contractor must provide and install two (2) new urinals and associated plumbing. Provide and install new urinal screen (US-1) at each urinal.\n\n• Contractor must provide and install two (2) new toilet partitions (TPART). One to be installed to meet requirements of ANSI 117.1\n\n• Contractor must provide and install new partition walls utilizing 3-5/8” metal studs and gypsum wall board. Fill with acoustic batt insulation. Where required to facilitate plumbing utilities or fixture hangers, 6” metal studs may be used.\n\n• Contractor must provide and install new doors and re-install salvaged doors. New doors to match characteristics of existing door.\n\n• Contractor must provide and install new epoxy flooring (EP-1). Slab must be prepared to receive finish per manufacturer instructions.\n\n• Contractor must install government provided trash cans, toilet paper, soap and paper towel dispensers.\n\n• Contractor must provide and apply paint (PT-1) on indicated walls.\n\n• Contractor must provide and install new GFCI receptacles.\n\n• Contractor must provide and install new mop sink (SINK-2), mop sink faucet (FC-2) and associated plumbing. Provide and install mop hooks.\n\n•\n\n• Contractor must provide and install new mirrors.\n\n• Contractor must provide and install new ADA grab bars.\n\n• Contractor must provide and install new restroom signage for each restroom per KAFB standards.\n\n• Existing ceiling to remain. Contractor must reconfigure lighting and HVAC to accommodate new space layout. Provide and install new lighting switches as required. Rebalance HVAC.\n\n• Contractor must provide and install new grid mounted light fixture.\n\n• Contractor must provide and install new exhaust fans, tie into existing building exhaust system.","html":"<p>This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.</p>\n\n<p>The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 37000 Plant 1 Repair Restrooms.&nbsp;&nbsp;</p>\n\n<ol>\n\t<li>Contractor must remove and dispose of existing flooring. (Abatement TBD) Clean, degrease, and prep slab to received new epoxy flooring.</li>\n\t<li>Contractor must remove and dispose of existing fixtures. Preserve existing wall tiles and ceiling grid/lighting.</li>\n\t<li>Contractor must demolish existing partition wall. Salvage all three (3) existing doors in room P2.</li>\n\t<li>Contractor must remove and dispose of existing kitchenette. Existing plumbing lines must be capped.</li>\n</ol>\n\n<ol>\n\t<li>Construction\n\t<ol>\n\t\t<li>Contractor must provide and install four (4) new water closets (WC-1) and associated plumbing.&nbsp;</li>\n\t\t<li>Contractor must provide and install four (4) new lavatories (SINK-1) and faucets (FC-1) and associated plumbing.&nbsp;</li>\n\t\t<li>Contractor must provide and install two (2) new urinals and associated plumbing. Provide and install new urinal screen (US-1) at each urinal.&nbsp;</li>\n\t\t<li>Contractor must provide and install two (2) new toilet partitions (TPART). One to be installed to meet requirements of ANSI 117.1</li>\n\t\t<li>Contractor must provide and install new partition walls utilizing 3-5/8&rdquo; metal studs and gypsum wall board. Fill with acoustic batt insulation. Where required to facilitate plumbing utilities or fixture hangers, 6&rdquo; metal studs may be used.</li>\n\t\t<li>Contractor must provide and install new doors and re-install salvaged doors. New doors to match characteristics of existing door.</li>\n\t\t<li>Contractor must provide and install new epoxy flooring (EP-1). Slab must be prepared to receive finish per manufacturer instructions.</li>\n\t\t<li>Contractor must install government provided trash cans, toilet paper, soap and paper towel dispensers.</li>\n\t\t<li>Contractor must provide and apply paint (PT-1) on indicated walls.</li>\n\t\t<li>Contractor must provide and install new GFCI receptacles.</li>\n\t\t<li>Contractor must provide and install new mop sink (SINK-2), mop sink faucet (FC-2) and associated plumbing. Provide and install mop hooks.</li>\n\t</ol>\n\t</li>\n\t<li>\n\t<ol>\n\t\t<li>Contractor must provide and install new mirrors.</li>\n\t\t<li>Contractor must provide and install new ADA grab bars.</li>\n\t\t<li>Contractor must provide and install new restroom signage for each restroom per KAFB standards.</li>\n\t\t<li>Existing ceiling to remain.&nbsp; Contractor must reconfigure lighting and HVAC to accommodate new space layout.&nbsp; Provide and install new lighting switches as required.&nbsp; Rebalance HVAC.</li>\n\t\t<li>Contractor must provide and install new grid mounted light fixture.</li>\n\t\t<li>Contractor must provide and install new exhaust fans, tie into existing building exhaust system.</li>\n\t</ol>\n\t</li>\n</ol>","origin":"detail"},"contacts":[{"name":"Glenda D. Kohlieber","role":"primary","email":"glenda.d.kohlieber@usace.army.mil","phone":"5754796095102"}],"place_of_performance":{"zip":"87117","city":{"name":"Kirtland AFB"},"state":{"code":"NM"},"country":{"code":"USA"}},"office_address":{"zip":"87109-3435","city":"ALBUQUERQUE","state":"NM","country":"USA"},"naics_codes":["236220"],"award":{"date":"2026-09-18","amount":"188955.16","number":"W912PP26PA033","awardee":{"raw":"EVERGREEN CONTRACTORS LLC Albuquerque NM 87113 USA","uei":"N2NXJ5E8NCV6","cage":"7FCW9","name":"EVERGREEN CONTRACTORS LLC","location":{"zip":"87113","city":{"name":"Albuquerque"},"state":{"code":"NM","name":"New Mexico"},"country":{"code":"USA","name":"UNITED STATES"}}}},"attachments":[],"awards":[],"related":[{"key":"W912PP279A001","latest_notice_id":"5427721451f74ee78305f575a8013667","title":"Progressive Design-Build (PDB) Other Transaction (OT) for FY28 High Speed Test Track (HSTT), Holloman Air Force Base, Otero County, New Mexico (NM)","solicitation_number":"W912PP279A001","notice_type":"o","first_type":"o","first_posted":"2026-11-23","last_posted":"2026-11-24","notices":3,"due_at":"2026-12-05T00:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-05T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PP","office_name":"W075 ENDIST ALBUQUERQUE","naics":"237990","psc":"Y1BZ","set_aside":null,"state":"NM","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"title","state_evidence":"(HSTT), HOLLOMAN AIR FORCE BASE, OTERO COUNTY, NEW MEXICO","site":"Holloman Air Force Base","site_key":"holloman-air-force-base-nm","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"W912PP27QA003","latest_notice_id":"e5ed7e119a88433d98cb29d2f154e2cf","title":"Santa Rosa Dam Elevator Maintenance Service, Guadalupe County, New Mexico","solicitation_number":"W912PP27QA003","notice_type":"o","first_type":"o","first_posted":"2026-11-23","last_posted":"2026-11-24","notices":2,"due_at":"2026-12-10T00:00:00Z","due_date":"2026-12-09","closes_at":"2026-12-10T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PP","office_name":"W075 ENDIST ALBUQUERQUE","naics":"238290","psc":"J035","set_aside":"SBA","state":"NM","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"2528 JOE AND LOUIE PAGE RD, SANTA ROSA, NEW MEXICO 88435","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"127EAX26Q0069","latest_notice_id":"d0ce0d95953c436d8aea746045c1fe95","title":"Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NF","solicitation_number":"127EAX26Q0069","notice_type":"k","first_type":"k","first_posted":"2026-09-11","last_posted":"2026-11-16","notices":4,"due_at":"2026-11-25T22:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-127EAX","office_name":"USDA-FS, CSA SOUTHWEST 7","naics":"236220","psc":"Z1JZ","set_aside":"SBA","state":"NM","county":"35049","county_name":"Santa Fe County","city":"3570500","city_name":"Santa Fe","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"FA940127R0001","latest_notice_id":"8f3da228af8f4a67983c91dbf2dbef9b","title":"Request for Qualification - MHMV230026 Construct Permanent Party Enlisted Dorm at Kirtland AFB, New Mexico","solicitation_number":"FA940127R0001","notice_type":"o","first_type":"o","first_posted":"2026-10-26","last_posted":"2026-11-12","notices":2,"due_at":"2026-11-25T23:30:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T23:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA9401","office_name":"FA9401 377 MSG PK","naics":"236220","psc":"Y1FC","set_aside":null,"state":"NM","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"KIRTLAND AIR FORCE BASE, NEW MEXICO","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"N6945027RP233","latest_notice_id":"2c675cdda8ef42a2842c5cbcb3d50727","title":"P233 AIR TRAFFIC CONTROL TOWER AND FLIGHT SIMULATOR TRAINING FACILITY","solicitation_number":"N6945027RP233","notice_type":"p","first_type":"r","first_posted":"2026-10-27","last_posted":"2026-11-10","notices":3,"due_at":"2026-11-25T16:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N69450","office_name":"NAVFACSYSCOM SOUTHEAST","naics":"236220","psc":"Y1BA","set_aside":null,"state":"MS","county":"28047","county_name":"Harrison County","city":"2806220","city_name":"Biloxi","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Keesler Air Force Base","site_key":"keesler-air-force-base-ms","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"}],"similar_open_total":194,"indexable":false}