Award notice, first published as presolicitation
Noyes Cut Ecosystem Restoration Phase Two
W912HN25B5008
Department of the Army, W074 Endist Savannah. Other Heavy and Civil Engineering Construction.
Awarded
$5,273,000.00 obligated so far on USAspending
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one was awarded in 2025
143 like it are open now in other heavy and civil engineering construction
- Dredged Material Containment Area (DMCA) O&M Construction IDC
Department of the Army, W074 Endist Savannah
Sources soughtNAICS 237990Savannah, GAW912HN27RA006Due tomorrowNov 27 - Tybee Island Shoreline Protection Project
Department of the Army, W074 Endist Savannah
SolicitationNAICS 237990Tybee Island, GAW912HN27BA001Closes in 14 daysDec 10 - United States Air Force Academy (USAFA) Varsity Baseball Stadium
Department of the Army, W071 Endist Omaha
PresolicitationSmall businessNAICS 237990ColoradoNAF128F27B0001Due tomorrowNov 27
All 143 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Award notice. Who won, when, and for how much. Glossary
- Time to respond
- Bidders had 29 days from the day the solicitation was posted, July 14, 2025, to the deadline. The deadline moved once: it was first July 2, 2025 and ended as August 12, 2025.
- Before the solicitation
- The agency published a presolicitation on June 16, 2025, 28 days before the solicitation.
- How it ended
- Awarded to Russell Marine LLC on September 19, 2025, 38 days after offers were due. The contracting office reported 7 offers (full and open competition).
Description
As published on SAM.gov with the solicitation of August 14, 2025.
The abstract is posted as of 14 August 2025. Amendment 0002: changes the bid submission location from PIEE to the Contract Specialist and Contracting Officer email addresses. SEE INSTRUCTIONS TO BIDDERS #9 (SUBMISSION OF BID INSTRUCTIONS)
Amendment 0001: publishes Pre-Bid Conference slides, Attendee List and updated specs and drawings(posted 18July),
The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101° N, 81.5466° W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.
The site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.
The cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.
The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Cwk0602_DRAWINGS_PHASE2_REVISED_CORRECTED_FINAL.pdf11.1 MB, July 14, 2025
- Solicitation Noyes Cut Phase II_W912HN25B5008.pdf1.4 MB, July 14, 2025
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Russell Marine LLC
- UEI
- EGMVLKWT42N1
- CAGE
- 60E56
- Vendor location
- Channelview, TX
- Contract
- W912HN25C5007, definitive contract
- Obligated
- $5,273,000.00
- Actions
- 2 between September 19, 2025 and October 27, 2025
- Competition
- Full and Open Competition, 7 offers received
- Set-aside reported
- No Set Aside Used.
- Described as
- Noyes Cut Phase 2 - USACE - Savannah District
- Match
- award number W912HN25C5007 equals the contract number; same awarding office W912HN (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 16, 2025
Presolicitation
Due July 2, 2025 at 2:00 PM EDT. SAM.gov, notice 24db63f4a3824c4ea5b466e0f172ba62
4 revisions on SAM
- June 16, 2025: publish, presolicitation
- July 14, 2025: publish, solicitation
- June 16, 2025: publish, presolicitation
- March 24, 2025: publish, sources sought
June 16, 2025
Presolicitation, originally sources sought
Noyes Cut Section 1135 Ecosystem Restoration Phase II
Due July 2, 2025 at 2:00 PM EDT. SAM.gov, notice ef851994b7244296b2cea904f106611b
3 revisions on SAM
- June 16, 2025: publish, presolicitation
- June 16, 2025: publish, presolicitation
- March 24, 2025: publish, sources sought
July 14, 2025
Solicitation, originally presolicitation
Due August 12, 2025 at 2:00 PM EDT. SAM.gov, notice 82758c05b50248e48137b01ffe4e98cb
6 revisions on SAM
- August 14, 2025: publish, solicitation
- August 6, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 18, 2025: publish, solicitation
- June 16, 2025: publish, presolicitation
- July 14, 2025: publish, solicitation
July 18, 2025
Solicitation
Due August 12, 2025 at 2:00 PM EDT. SAM.gov, notice 5d001e2dfdf043dca8cb761d4c6b9e19
6 revisions on SAM
- August 14, 2025: publish, solicitation
- August 6, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 18, 2025: publish, solicitation
- June 16, 2025: publish, presolicitation
- July 14, 2025: publish, solicitation
July 22, 2025
Solicitation
Due August 12, 2025 at 2:00 PM EDT. SAM.gov, notice 76a0849d19904a6d8665cb2bcb5d13cb
6 revisions on SAM
- August 14, 2025: publish, solicitation
- August 6, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 18, 2025: publish, solicitation
- June 16, 2025: publish, presolicitation
- July 14, 2025: publish, solicitation
August 6, 2025
Solicitation
Due August 12, 2025 at 2:00 PM EDT. SAM.gov, notice e1ae00472d8b43dd929945f2ad6ecedf
6 revisions on SAM
- August 14, 2025: publish, solicitation
- August 6, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 18, 2025: publish, solicitation
- June 16, 2025: publish, presolicitation
- July 14, 2025: publish, solicitation
August 14, 2025
Solicitation
Due August 12, 2025 at 2:00 PM EDT. SAM.gov, notice 6ca6f2a8671e4d7cb5522a7c45c41902
7 revisions on SAM
- September 19, 2025: publish, award notice
- August 14, 2025: publish, solicitation
- August 6, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 18, 2025: publish, solicitation
- June 16, 2025: publish, presolicitation
- July 14, 2025: publish, solicitation
September 19, 2025
Award notice, originally solicitation
Awarded to Russell Marine LLC for $5,273,000. SAM.gov, notice e14b7693ec40483193055a6b65f73c35
2 revisions on SAM
- September 19, 2025: publish, award notice
- August 14, 2025: publish, solicitation
Points of contact
- Amy L CollinsAmy.L.Collins@usace.army.mil9126525505
- Glenda CANTYglenda.a.canty@usace.army.mil9126525030