{"canonical":"https://sealedbidder.com/opportunities/w912hn25b5008","key":"W912HN25B5008","url":"https://sealedbidder.com/opportunities/w912hn25b5008","title":"Noyes Cut Ecosystem Restoration Phase Two","solicitation_number":"W912HN25B5008","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-08-12T18:00:00Z","first_posted":"2025-06-16","last_posted":"2025-09-19","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W074 ENDIST SAVANNAH","naics":"237990","psc":"Z1KB","set_aside":null,"place_state":"GA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"13127","place_county_name":"Glynn County","place_city":"1311560","place_city_name":"Brunswick","winner":"RUSSELL MARINE LLC","award_amount":"5273000.00","publications":[{"notice_id":"24db63f4a3824c4ea5b466e0f172ba62","title":"Noyes Cut Ecosystem Restoration Phase Two","solicitation_number":"W912HN25B5008","notice_type":"p","base_type":"p","posted":"2025-06-16","posted_at":"2025-06-16T12:00:10.940Z","due_at":"2025-07-02T18:00:00Z","due_date":"2025-07-02","cancelled":false,"archived":true,"archive_date":"2025-07-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/24db63f4a3824c4ea5b466e0f172ba62/view","enriched":true,"history":[{"index":7,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Section 1135 Ecosystem Restoration Phase II","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T11:56:15.007Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ef851994b7244296b2cea904f106611b","solicitation_number":"W912HN25B5008","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":3,"title":"Noyes Cut Section 1135 Ecosystem Restoration Phase II","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-24T14:43:57.695Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"8adb481ec6a24992a7518add07e92456","solicitation_number":"W912HN25S5003"}]},{"notice_id":"ef851994b7244296b2cea904f106611b","title":"Noyes Cut Section 1135 Ecosystem Restoration Phase II","solicitation_number":"W912HN25B5008","notice_type":"p","base_type":"r","posted":"2025-06-16","posted_at":"2025-06-16T11:56:15.007Z","due_at":"2025-07-02T18:00:00Z","due_date":"2025-07-02","cancelled":false,"archived":true,"archive_date":"2025-07-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ef851994b7244296b2cea904f106611b/view","enriched":true,"history":[{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":4,"title":"Noyes Cut Section 1135 Ecosystem Restoration Phase II","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T11:56:15.007Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ef851994b7244296b2cea904f106611b","solicitation_number":"W912HN25B5008","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":3,"title":"Noyes Cut Section 1135 Ecosystem Restoration Phase II","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-24T14:43:57.695Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"8adb481ec6a24992a7518add07e92456","solicitation_number":"W912HN25S5003"}]},{"notice_id":"82758c05b50248e48137b01ffe4e98cb","title":"Noyes Cut Ecosystem Restoration Phase Two","solicitation_number":"W912HN25B5008","notice_type":"o","base_type":"p","posted":"2025-07-14","posted_at":"2025-07-14T12:15:59.372Z","due_at":"2025-08-12T18:00:00Z","due_date":"2025-08-12","cancelled":false,"archived":true,"archive_date":"2025-08-27","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/82758c05b50248e48137b01ffe4e98cb/view","enriched":true,"history":[{"index":8,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T13:15:58.865Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e1ae00472d8b43dd929945f2ad6ecedf","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:04:14.274Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"76a0849d19904a6d8665cb2bcb5d13cb","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-18T12:29:38.399Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5d001e2dfdf043dca8cb761d4c6b9e19","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":3,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}]},{"notice_id":"5d001e2dfdf043dca8cb761d4c6b9e19","title":"Noyes Cut Ecosystem Restoration Phase Two","solicitation_number":"W912HN25B5008","notice_type":"o","base_type":"o","posted":"2025-07-18","posted_at":"2025-07-18T12:29:38.399Z","due_at":"2025-08-12T18:00:00Z","due_date":"2025-08-12","cancelled":false,"archived":true,"archive_date":"2025-08-27","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5d001e2dfdf043dca8cb761d4c6b9e19/view","enriched":true,"history":[{"index":8,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T13:15:58.865Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e1ae00472d8b43dd929945f2ad6ecedf","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:04:14.274Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"76a0849d19904a6d8665cb2bcb5d13cb","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-18T12:29:38.399Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5d001e2dfdf043dca8cb761d4c6b9e19","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":3,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}]},{"notice_id":"76a0849d19904a6d8665cb2bcb5d13cb","title":"Noyes Cut Ecosystem Restoration Phase Two","solicitation_number":"W912HN25B5008","notice_type":"o","base_type":"o","posted":"2025-07-22","posted_at":"2025-07-22T12:04:14.274Z","due_at":"2025-08-12T18:00:00Z","due_date":"2025-08-12","cancelled":false,"archived":true,"archive_date":"2025-08-27","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/76a0849d19904a6d8665cb2bcb5d13cb/view","enriched":true,"history":[{"index":8,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T13:15:58.865Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e1ae00472d8b43dd929945f2ad6ecedf","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:04:14.274Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"76a0849d19904a6d8665cb2bcb5d13cb","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-18T12:29:38.399Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5d001e2dfdf043dca8cb761d4c6b9e19","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":3,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}]},{"notice_id":"e1ae00472d8b43dd929945f2ad6ecedf","title":"Noyes Cut Ecosystem Restoration Phase Two","solicitation_number":"W912HN25B5008","notice_type":"o","base_type":"o","posted":"2025-08-06","posted_at":"2025-08-06T13:15:58.865Z","due_at":"2025-08-12T18:00:00Z","due_date":"2025-08-12","cancelled":false,"archived":true,"archive_date":"2025-08-27","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e1ae00472d8b43dd929945f2ad6ecedf/view","enriched":true,"history":[{"index":8,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T13:15:58.865Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e1ae00472d8b43dd929945f2ad6ecedf","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:04:14.274Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"76a0849d19904a6d8665cb2bcb5d13cb","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-18T12:29:38.399Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5d001e2dfdf043dca8cb761d4c6b9e19","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":3,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}]},{"notice_id":"6ca6f2a8671e4d7cb5522a7c45c41902","title":"Noyes Cut Ecosystem Restoration Phase Two","solicitation_number":"W912HN25B5008","notice_type":"o","base_type":"o","posted":"2025-08-14","posted_at":"2025-08-14T19:28:21.288Z","due_at":"2025-08-12T18:00:00Z","due_date":"2025-08-12","cancelled":false,"archived":true,"archive_date":"2025-08-27","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6ca6f2a8671e4d7cb5522a7c45c41902/view","enriched":true,"history":[{"index":11,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-19T21:07:08.103Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"e14b7693ec40483193055a6b65f73c35","solicitation_number":"W912HN25C5007","related_opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902"},{"index":8,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T13:15:58.865Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e1ae00472d8b43dd929945f2ad6ecedf","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:04:14.274Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"76a0849d19904a6d8665cb2bcb5d13cb","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-18T12:29:38.399Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5d001e2dfdf043dca8cb761d4c6b9e19","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":3,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}]},{"notice_id":"e14b7693ec40483193055a6b65f73c35","title":"Noyes Cut Ecosystem Restoration Phase Two","solicitation_number":"W912HN25C5007","notice_type":"a","base_type":"o","posted":"2025-09-19","posted_at":"2025-09-19T21:07:08.103Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-10-04","removed_at":null,"award_number":"W912HN25C5007","awardee_name":"RUSSELL MARINE LLC","amount":"5273000.00","link_sam":"https://sam.gov/workspace/contract/opp/e14b7693ec40483193055a6b65f73c35/view","enriched":true,"history":[{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-19T21:07:08.103Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"e14b7693ec40483193055a6b65f73c35","solicitation_number":"W912HN25C5007","related_opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}]}],"latest_notice_id":"e14b7693ec40483193055a6b65f73c35","first_type":"p","notices":[{"dates":{"posted":"2025-06-16","posted_at":"2025-06-16T12:00:10.940Z","created_at":"2025-06-16T11:58:13.471Z","modified_at":"2025-07-18T03:55:53.451Z","response_deadline":{"raw":"2025-07-02T14:00:00-04:00","utc":"2025-07-02T18:00:00Z","date":"2025-07-02","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/24db63f4a3824c4ea5b466e0f172ba62/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Noyes Cut Ecosystem Restoration Phase Two","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_id":"100074192","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-17","archive_type":"auto15"},"history":[{"index":7,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Section 1135 Ecosystem Restoration Phase II","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T11:56:15.007Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ef851994b7244296b2cea904f106611b","solicitation_number":"W912HN25B5008","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":3,"title":"Noyes Cut Section 1135 Ecosystem Restoration Phase II","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-24T14:43:57.695Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"8adb481ec6a24992a7518add07e92456","solicitation_number":"W912HN25S5003"}],"contacts":[{"name":"Shermaine Malone","role":"primary","email":"shermaine.d.malone@usace.army.mil","phone":"9126529165"},{"name":"Glenda CANTY","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"24db63f4a3824c4ea5b466e0f172ba62","lineage_id":"ef851994b7244296b2cea904f106611b","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T12:04:59.579441846Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"933fa4ddd3a24efdfa393e2079528dba0a75430623bcc5715ab4f21f87ef7d67","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-12T12:04:59.579441846Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The U.S. Army Corps of Engineers (USACE) Savannah District intends to issue an Invitation for Bid (IFB) W912HN24B5008 for the&nbsp;Noyes Cut Ecosystem Restoration Phase Two Project.&nbsp;</p>\n\n<p>The SOLICITATION will be issued for 100% Full and Open Competition under NAICS Code 237990. This acquisition will be procured in accordance with FAR Part 14 (Sealed Bid). The pricing information of the successful offeror shall be incorporated upon award of the contract. Per FAR 36.204, the Construction Magnitude of this contract is between $5,000,000.00 and $10,000,000.00.</p>\n\n<p>Anticipated Solicitation Release Date: The Government anticipates releasing the solicitation on or about 3 July 2025 with an&nbsp; approximate closing date on or about 6 August 2025. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted.&nbsp;</p>\n\n<p>Note: This Synopsis is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming; no proposals are being accepted at this time.</p>\n\n<p>Period of Performance: The period of performance will be 1 (one) year after the Notice to Proceed.&nbsp;</p>\n\n<p>The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101&deg; N, 81.5466&deg; W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.</p>\n\n<p>The site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.</p>\n\n<p>The cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.</p>\n\n<p>The site is owned by the State of Georgia and all applicable laws and regulations of safe vessel operation will be maintained. All work at the site will be conducted from floating platforms and no equipment will be allowed to be placed in the marsh. During construction, the contractor will use best management practices to minimize damage to the marsh and impacts to fish and wildlife. Marsh that is damaged outside of the established footprint of the structure will be restored by the contractor at no additional cost to the Government.</p>\n\n<p>Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the SAM website at&nbsp;https://sam.gov.&nbsp;</p>\n\n<p>Amendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check&nbsp;the website periodically for any amendments to the solicitation.&nbsp;</p>\n\n<p>Registrations: Offerors shall have and shall maintain an active registration in the following database:&nbsp;</p>\n\n<p>System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.&nbsp;</p>\n\n<p>Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronically via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried,etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.&nbsp;</p>\n\n<p>Point of Contacts: For this acquisition, the point-of-contacts are the Contracting Officer Ms. Glenda Canty, whose email address is glenda.a.canty@usace.army.mil and Contract Specialist Mr. Shermaine Malone whose email address is shermaine.d.malone@usace.army.mil.&nbsp;</p>","text":"The U.S. Army Corps of Engineers (USACE) Savannah District intends to issue an Invitation for Bid (IFB) W912HN24B5008 for the Noyes Cut Ecosystem Restoration Phase Two Project.\n\nThe SOLICITATION will be issued for 100% Full and Open Competition under NAICS Code 237990. This acquisition will be procured in accordance with FAR Part 14 (Sealed Bid). The pricing information of the successful offeror shall be incorporated upon award of the contract. Per FAR 36.204, the Construction Magnitude of this contract is between $5,000,000.00 and $10,000,000.00.\n\nAnticipated Solicitation Release Date: The Government anticipates releasing the solicitation on or about 3 July 2025 with an approximate closing date on or about 6 August 2025. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted.\n\nNote: This Synopsis is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming; no proposals are being accepted at this time.\n\nPeriod of Performance: The period of performance will be 1 (one) year after the Notice to Proceed.\n\nThe contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101° N, 81.5466° W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.\n\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.\n\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.\n\nThe site is owned by the State of Georgia and all applicable laws and regulations of safe vessel operation will be maintained. All work at the site will be conducted from floating platforms and no equipment will be allowed to be placed in the marsh. During construction, the contractor will use best management practices to minimize damage to the marsh and impacts to fish and wildlife. Marsh that is damaged outside of the established footprint of the structure will be restored by the contractor at no additional cost to the Government.\n\nSolicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the SAM website at https://sam.gov.\n\nAmendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the website periodically for any amendments to the solicitation.\n\nRegistrations: Offerors shall have and shall maintain an active registration in the following database:\n\nSystem for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.\n\nProcurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronically via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried,etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.\n\nPoint of Contacts: For this acquisition, the point-of-contacts are the Contracting Officer Ms. Glenda Canty, whose email address is glenda.a.canty@usace.army.mil and Contract Specialist Mr. Shermaine Malone whose email address is shermaine.d.malone@usace.army.mil.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W912HN25B5008","place_of_performance":{"city":{"code":"11560","name":"Brunswick"},"state":{"code":"GA","name":"Georgia"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1KB"},{"dates":{"posted":"2025-06-16","posted_at":"2025-06-16T11:56:15.007Z","created_at":"2025-06-16T11:34:28.493Z","modified_at":"2025-07-18T03:55:53.451Z","response_deadline":{"raw":"2025-07-02T14:00:00-04:00","utc":"2025-07-02T18:00:00Z","date":"2025-07-02","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ef851994b7244296b2cea904f106611b/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Noyes Cut Section 1135 Ecosystem Restoration Phase II","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_id":"100074192","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-17","archive_type":"auto15"},"history":[{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":4,"title":"Noyes Cut Section 1135 Ecosystem Restoration Phase II","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T11:56:15.007Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ef851994b7244296b2cea904f106611b","solicitation_number":"W912HN25B5008","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":3,"title":"Noyes Cut Section 1135 Ecosystem Restoration Phase II","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-24T14:43:57.695Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"8adb481ec6a24992a7518add07e92456","solicitation_number":"W912HN25S5003"}],"contacts":[{"name":"Shermaine Malone","role":"primary","email":"shermaine.d.malone@usace.army.mil","phone":"9126529165"},{"name":"Glenda CANTY","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"ef851994b7244296b2cea904f106611b","lineage_id":"ef851994b7244296b2cea904f106611b","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T13:23:42.274480664Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"4948baccbf1c9efdcd625f3debf8e532e09f903c68ade6edbe56543dc3a5a1bb","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-12T13:23:42.274480664Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The U.S. Army Corps of Engineers (USACE) Savannah District intends to issue an Invitation for Bid (IFB) W912HN24B5008 for the&nbsp;Noyes Cut Ecosystem Restoration Phase Two Project.&nbsp;</p>\n\n<p>The SOLICITATION will be issued for 100% Full and Open Competition under NAICS Code 237990. This acquisition will be procured in accordance with FAR Part 14 (Sealed Bid). The pricing information of the successful offeror shall be incorporated upon award of the contract. Per FAR 36.204, the Construction Magnitude of this contract is between $5,000,000.00 and $10,000,000.00.</p>\n\n<p>Anticipated Solicitation Release Date: The Government anticipates releasing the solicitation on or about 3 July 2025 with an&nbsp; approximate closing date on or about 6 August 2025. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted.&nbsp;</p>\n\n<p>Note: This Synopsis is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming; no proposals are being accepted at this time.</p>\n\n<p>Period of Performance: The period of performance will be 1 (one) year after the Notice to Proceed.&nbsp;</p>\n\n<p>The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101&deg; N, 81.5466&deg; W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.</p>\n\n<p>The site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.</p>\n\n<p>The cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.</p>\n\n<p>The site is owned by the State of Georgia and all applicable laws and regulations of safe vessel operation will be maintained. All work at the site will be conducted from floating platforms and no equipment will be allowed to be placed in the marsh. During construction, the contractor will use best management practices to minimize damage to the marsh and impacts to fish and wildlife. Marsh that is damaged outside of the established footprint of the structure will be restored by the contractor at no additional cost to the Government.</p>\n\n<p>Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the SAM website at&nbsp;https://sam.gov.&nbsp;</p>\n\n<p>Amendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check&nbsp;the website periodically for any amendments to the solicitation.&nbsp;</p>\n\n<p>Registrations: Offerors shall have and shall maintain an active registration in the following database:&nbsp;</p>\n\n<p>System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.&nbsp;</p>\n\n<p>Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronically via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried,etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.&nbsp;</p>\n\n<p>Point of Contacts: For this acquisition, the point-of-contacts are the Contracting Officer Ms. Glenda Canty, whose email address is glenda.a.canty@usace.army.mil and Contract Specialist Mr. Shermaine Malone whose email address is shermaine.d.malone@usace.army.mil.&nbsp;</p>","text":"The U.S. Army Corps of Engineers (USACE) Savannah District intends to issue an Invitation for Bid (IFB) W912HN24B5008 for the Noyes Cut Ecosystem Restoration Phase Two Project.\n\nThe SOLICITATION will be issued for 100% Full and Open Competition under NAICS Code 237990. This acquisition will be procured in accordance with FAR Part 14 (Sealed Bid). The pricing information of the successful offeror shall be incorporated upon award of the contract. Per FAR 36.204, the Construction Magnitude of this contract is between $5,000,000.00 and $10,000,000.00.\n\nAnticipated Solicitation Release Date: The Government anticipates releasing the solicitation on or about 3 July 2025 with an approximate closing date on or about 6 August 2025. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted.\n\nNote: This Synopsis is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming; no proposals are being accepted at this time.\n\nPeriod of Performance: The period of performance will be 1 (one) year after the Notice to Proceed.\n\nThe contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101° N, 81.5466° W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.\n\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.\n\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.\n\nThe site is owned by the State of Georgia and all applicable laws and regulations of safe vessel operation will be maintained. All work at the site will be conducted from floating platforms and no equipment will be allowed to be placed in the marsh. During construction, the contractor will use best management practices to minimize damage to the marsh and impacts to fish and wildlife. Marsh that is damaged outside of the established footprint of the structure will be restored by the contractor at no additional cost to the Government.\n\nSolicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the SAM website at https://sam.gov.\n\nAmendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the website periodically for any amendments to the solicitation.\n\nRegistrations: Offerors shall have and shall maintain an active registration in the following database:\n\nSystem for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.\n\nProcurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronically via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried,etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.\n\nPoint of Contacts: For this acquisition, the point-of-contacts are the Contracting Officer Ms. Glenda Canty, whose email address is glenda.a.canty@usace.army.mil and Contract Specialist Mr. Shermaine Malone whose email address is shermaine.d.malone@usace.army.mil.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W912HN25B5008","place_of_performance":{"city":{"code":"11560","name":"Brunswick"},"state":{"code":"GA","name":"Georgia"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1KB"},{"dates":{"posted":"2025-07-14","posted_at":"2025-07-14T12:15:59.372Z","created_at":"2025-07-14T10:26:23.358Z","modified_at":"2025-08-28T03:55:49.083Z","response_deadline":{"raw":"2025-08-12T14:00:00-04:00","utc":"2025-08-12T18:00:00Z","date":"2025-08-12","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/82758c05b50248e48137b01ffe4e98cb/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Noyes Cut Ecosystem Restoration Phase Two","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_id":"100074192","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-27","archive_type":"auto15"},"history":[{"index":8,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T13:15:58.865Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e1ae00472d8b43dd929945f2ad6ecedf","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:04:14.274Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"76a0849d19904a6d8665cb2bcb5d13cb","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-18T12:29:38.399Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5d001e2dfdf043dca8cb761d4c6b9e19","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":3,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}],"contacts":[{"name":"Shermaine Malone","role":"primary","email":"shermaine.d.malone@usace.army.mil","phone":"9126529165"},{"name":"Glenda CANTY","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"82758c05b50248e48137b01ffe4e98cb","lineage_id":"82758c05b50248e48137b01ffe4e98cb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-10T02:30:33.368976458Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a84d42d74ad4eb56e00c738cc93a5c353698adfad5d85d8ede541c62996ecb04","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-10T02:30:33.368976458Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101&deg; N, 81.5466&deg; W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.<br />\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.<br />\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.<br />\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.</p>","text":"The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101° N, 81.5466° W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.\n\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.\n\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.\n\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HN25B5008","place_of_performance":{"city":{"code":"11560","name":"Brunswick"},"state":{"code":"GA","name":"Georgia"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1KB"},{"dates":{"posted":"2025-07-18","posted_at":"2025-07-18T12:29:38.399Z","created_at":"2025-07-18T12:25:28.092Z","modified_at":"2025-08-28T03:55:49.083Z","response_deadline":{"raw":"2025-08-12T14:00:00-04:00","utc":"2025-08-12T18:00:00Z","date":"2025-08-12","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5d001e2dfdf043dca8cb761d4c6b9e19/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Noyes Cut Ecosystem Restoration Phase Two","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_id":"100074192","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-27","archive_type":"auto15"},"history":[{"index":8,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T13:15:58.865Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e1ae00472d8b43dd929945f2ad6ecedf","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:04:14.274Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"76a0849d19904a6d8665cb2bcb5d13cb","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-18T12:29:38.399Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5d001e2dfdf043dca8cb761d4c6b9e19","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":3,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}],"contacts":[{"name":"Shermaine Malone","role":"primary","email":"shermaine.d.malone@usace.army.mil","phone":"9126529165"},{"name":"Glenda CANTY","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5d001e2dfdf043dca8cb761d4c6b9e19","lineage_id":"82758c05b50248e48137b01ffe4e98cb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-09T02:19:36.745124332Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"985d4795c9a1ec5494f64abebb6c52976a0fdf9ed87a86365a8f91ad6fa1300f","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-09T02:19:36.745124332Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101&deg; N, 81.5466&deg; W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.<br />\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.<br />\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.<br />\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.</p>","text":"The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101° N, 81.5466° W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.\n\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.\n\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.\n\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HN25B5008","place_of_performance":{"city":{"code":"11560","name":"Brunswick"},"state":{"code":"GA","name":"Georgia"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1KB"},{"dates":{"posted":"2025-07-22","posted_at":"2025-07-22T12:04:14.274Z","created_at":"2025-07-22T11:41:30.270Z","modified_at":"2025-08-28T03:55:49.083Z","response_deadline":{"raw":"2025-08-12T14:00:00-04:00","utc":"2025-08-12T18:00:00Z","date":"2025-08-12","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/76a0849d19904a6d8665cb2bcb5d13cb/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Noyes Cut Ecosystem Restoration Phase Two","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_id":"100074192","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-27","archive_type":"auto15"},"history":[{"index":8,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T13:15:58.865Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e1ae00472d8b43dd929945f2ad6ecedf","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:04:14.274Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"76a0849d19904a6d8665cb2bcb5d13cb","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-18T12:29:38.399Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5d001e2dfdf043dca8cb761d4c6b9e19","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":3,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}],"contacts":[{"name":"Shermaine Malone","role":"primary","email":"shermaine.d.malone@usace.army.mil","phone":"9126529165"},{"name":"Glenda CANTY","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"76a0849d19904a6d8665cb2bcb5d13cb","lineage_id":"82758c05b50248e48137b01ffe4e98cb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-08T04:20:12.424450285Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c1dcdabb5c39988a0a214d32223ca743b70a7d7b1031c9ef49014411b6b94a7f","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-08T04:20:12.424450285Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Amendment 0001: publishes Pre-Bid Conference slides, Attendee List&nbsp; and updated specs and drawings(posted 18July),&nbsp;</p>\n\n<p>The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101&deg; N, 81.5466&deg; W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.<br />\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.<br />\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.<br />\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.</p>","text":"Amendment 0001: publishes Pre-Bid Conference slides, Attendee List and updated specs and drawings(posted 18July),\n\nThe contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101° N, 81.5466° W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.\n\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.\n\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.\n\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HN25B5008","place_of_performance":{"city":{"code":"11560","name":"Brunswick"},"state":{"code":"GA","name":"Georgia"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1KB"},{"dates":{"posted":"2025-08-06","posted_at":"2025-08-06T13:15:58.865Z","created_at":"2025-08-06T13:07:26.216Z","modified_at":"2025-08-28T03:55:49.083Z","response_deadline":{"raw":"2025-08-12T14:00:00-04:00","utc":"2025-08-12T18:00:00Z","date":"2025-08-12","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e1ae00472d8b43dd929945f2ad6ecedf/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Noyes Cut Ecosystem Restoration Phase Two","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_id":"100074192","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-27","archive_type":"auto15"},"history":[{"index":8,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T13:15:58.865Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e1ae00472d8b43dd929945f2ad6ecedf","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:04:14.274Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"76a0849d19904a6d8665cb2bcb5d13cb","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-18T12:29:38.399Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5d001e2dfdf043dca8cb761d4c6b9e19","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":3,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}],"contacts":[{"name":"Shermaine Malone","role":"primary","email":"shermaine.d.malone@usace.army.mil","phone":"9126529165"},{"name":"Glenda CANTY","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e1ae00472d8b43dd929945f2ad6ecedf","lineage_id":"82758c05b50248e48137b01ffe4e98cb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-05T04:13:57.528304610Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"74ad3a3c765d3c493582440103624089b52f0949827fb878620bda3d5c749ba0","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-05T04:13:57.528304610Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Amendment 0002: changes the bid submission location from PIEE to the Contract Specialist and Contracting Officer email addresses. SEE INSTRUCTIONS TO BIDDERS #9 (SUBMISSION OF BID INSTRUCTIONS)</p>\n\n<p>Amendment 0001: publishes Pre-Bid Conference slides, Attendee List&nbsp; and updated specs and drawings(posted 18July),&nbsp;</p>\n\n<p>The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101&deg; N, 81.5466&deg; W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.<br />\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.<br />\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.<br />\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.</p>","text":"Amendment 0002: changes the bid submission location from PIEE to the Contract Specialist and Contracting Officer email addresses. SEE INSTRUCTIONS TO BIDDERS #9 (SUBMISSION OF BID INSTRUCTIONS)\n\nAmendment 0001: publishes Pre-Bid Conference slides, Attendee List and updated specs and drawings(posted 18July),\n\nThe contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101° N, 81.5466° W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.\n\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.\n\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.\n\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HN25B5008","place_of_performance":{"city":{"code":"11560","name":"Brunswick"},"state":{"code":"GA","name":"Georgia"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1KB"},{"dates":{"posted":"2025-08-14","posted_at":"2025-08-14T19:28:21.288Z","created_at":"2025-08-14T19:19:12.098Z","modified_at":"2025-08-28T03:55:49.083Z","response_deadline":{"raw":"2025-08-12T14:00:00-04:00","utc":"2025-08-12T18:00:00Z","date":"2025-08-12","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6ca6f2a8671e4d7cb5522a7c45c41902/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Noyes Cut Ecosystem Restoration Phase Two","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_id":"100074192","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-27","archive_type":"auto15"},"history":[{"index":11,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-19T21:07:08.103Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"e14b7693ec40483193055a6b65f73c35","solicitation_number":"W912HN25C5007","related_opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902"},{"index":8,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":6,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T13:15:58.865Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e1ae00472d8b43dd929945f2ad6ecedf","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:04:14.274Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"76a0849d19904a6d8665cb2bcb5d13cb","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":4,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-18T12:29:38.399Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5d001e2dfdf043dca8cb761d4c6b9e19","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"},{"index":3,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-16T12:00:10.940Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62","solicitation_number":"W912HN25B5008","parent_opportunity_id":"ef851994b7244296b2cea904f106611b","related_opportunity_id":"8adb481ec6a24992a7518add07e92456"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T12:15:59.372Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"82758c05b50248e48137b01ffe4e98cb","solicitation_number":"W912HN25B5008","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}],"contacts":[{"name":"Shermaine Malone","role":"primary","email":"shermaine.d.malone@usace.army.mil","phone":"9126529165"},{"name":"Glenda CANTY","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"6ca6f2a8671e4d7cb5522a7c45c41902","lineage_id":"82758c05b50248e48137b01ffe4e98cb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-04T00:12:10.899607718Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"ddef2c056e83eadbbac89d6009fe87a1f6b7fb58c48ace2bb1b99024263181b6","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-04T00:12:10.899607718Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The abstract is posted as of 14 August 2025.&nbsp; Amendment 0002: changes the bid submission location from PIEE to the Contract Specialist and Contracting Officer email addresses. SEE INSTRUCTIONS TO BIDDERS #9 (SUBMISSION OF BID INSTRUCTIONS)</p>\n\n<p>Amendment 0001: publishes Pre-Bid Conference slides, Attendee List&nbsp; and updated specs and drawings(posted 18July),&nbsp;</p>\n\n<p>The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101&deg; N, 81.5466&deg; W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.<br />\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.<br />\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.<br />\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.</p>","text":"The abstract is posted as of 14 August 2025. Amendment 0002: changes the bid submission location from PIEE to the Contract Specialist and Contracting Officer email addresses. SEE INSTRUCTIONS TO BIDDERS #9 (SUBMISSION OF BID INSTRUCTIONS)\n\nAmendment 0001: publishes Pre-Bid Conference slides, Attendee List and updated specs and drawings(posted 18July),\n\nThe contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101° N, 81.5466° W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.\n\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.\n\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.\n\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HN25B5008","place_of_performance":{"city":{"code":"11560","name":"Brunswick"},"state":{"code":"GA","name":"Georgia"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1KB"},{"award":{"date":"2025-09-19","amount":"5273000.00","number":"W912HN25C5007","awardee":{"raw":"RUSSELL MARINE LLC Channelview TX 77530 USA","uei":"EGMVLKWT42N1","cage":"60E56","name":"RUSSELL MARINE LLC","location":{"zip":"77530","city":{"code":"14236","name":"Channelview"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2025-09-19","posted_at":"2025-09-19T21:07:08.103Z","award_date":"2025-09-19","created_at":"2025-09-19T21:02:56.509Z","modified_at":"2025-10-05T04:00:11.067Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/e14b7693ec40483193055a6b65f73c35/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Noyes Cut Ecosystem Restoration Phase Two","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_id":"100074192","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-04","archive_type":"auto15"},"history":[{"index":5,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-19T21:07:08.103Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"e14b7693ec40483193055a6b65f73c35","solicitation_number":"W912HN25C5007","related_opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902"},{"index":2,"title":"Noyes Cut Ecosystem Restoration Phase Two","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T19:28:21.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ca6f2a8671e4d7cb5522a7c45c41902","solicitation_number":"W912HN25B5008","parent_opportunity_id":"82758c05b50248e48137b01ffe4e98cb","related_opportunity_id":"24db63f4a3824c4ea5b466e0f172ba62"}],"contacts":[{"name":"Amy L Collins","role":"primary","email":"Amy.L.Collins@usace.army.mil","phone":"9126525505"},{"name":"Glenda CANTY","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e14b7693ec40483193055a6b65f73c35","lineage_id":"82758c05b50248e48137b01ffe4e98cb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-29T02:24:33.626939734Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7410e2a14aa7497e888b2741e017818f0e28f65921eb6ba2c69ea035a54a62b9","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-29T02:24:33.626939734Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"W912HN25C5007","place_of_performance":{"city":{"code":"11560","name":"Brunswick"},"state":{"code":"GA","name":"Georgia"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1KB"}],"due_at":"2025-08-12T18:00:00Z","due_date":"2025-08-12","closes_at":"2025-08-12T18:00:00Z","awardable":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","state":"GA","county":"13127","county_name":"Glynn County","city":"1311560","city_name":"Brunswick","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"EGMVLKWT42N1","amount":"5273000.00","linked_awards":8,"cancelled":false,"archived":true,"updated_at":"2026-10-29T03:23:54.732322Z","principal_notice_id":"6ca6f2a8671e4d7cb5522a7c45c41902","description":{"text":"The abstract is posted as of 14 August 2025. Amendment 0002: changes the bid submission location from PIEE to the Contract Specialist and Contracting Officer email addresses. SEE INSTRUCTIONS TO BIDDERS #9 (SUBMISSION OF BID INSTRUCTIONS)\n\nAmendment 0001: publishes Pre-Bid Conference slides, Attendee List and updated specs and drawings(posted 18July),\n\nThe contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101° N, 81.5466° W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.\n\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.\n\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.\n\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.","html":"<p>The abstract is posted as of 14 August 2025.&nbsp; Amendment 0002: changes the bid submission location from PIEE to the Contract Specialist and Contracting Officer email addresses. SEE INSTRUCTIONS TO BIDDERS #9 (SUBMISSION OF BID INSTRUCTIONS)</p>\n\n<p>Amendment 0001: publishes Pre-Bid Conference slides, Attendee List&nbsp; and updated specs and drawings(posted 18July),&nbsp;</p>\n\n<p>The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101&deg; N, 81.5466&deg; W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.<br />\nThe site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.<br />\nThe cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.<br />\nThe rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.</p>","origin":"detail"},"contacts":[{"name":"Amy L Collins","role":"primary","email":"Amy.L.Collins@usace.army.mil","phone":"9126525505"},{"name":"Glenda CANTY","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"place_of_performance":{"city":{"code":"11560","name":"Brunswick"},"state":{"code":"GA","name":"Georgia"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"naics_codes":["237990"],"award":null,"attachments":[{"resource_id":"3c189e58bccc414e9c3864055e0db2f5","name":"Cwk0602_DRAWINGS_PHASE2_REVISED_CORRECTED_FINAL.pdf","kind":"file","mime_type":".pdf","size_bytes":11595699,"posted_at":"2025-07-14T12:15:59.372Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3c189e58bccc414e9c3864055e0db2f5/download","mirrored":false},{"resource_id":"b5ed0afbdd2f45a6851ee86b27678a87","name":"Solicitation Noyes Cut Phase II_W912HN25B5008.pdf","kind":"file","mime_type":".pdf","size_bytes":1472955,"posted_at":"2025-07-14T12:15:59.372Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b5ed0afbdd2f45a6851ee86b27678a87/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_W912HN25C5007_9700_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_W912HN25C5007_9700_-NONE-_-NONE-/","piid":"W912HN25C5007","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"EGMVLKWT42N1","recipient_name":"RUSSELL MARINE LLC","recipient_uei":"EGMVLKWT42N1","recipient_cage":"60E56","recipient_city":"CHANNELVIEW","recipient_state":"TX","sub_name":"Department of the Army","office_name":"W074 ENDIST SAVANNAH","office_key":"o-W912HN","first_action_date":"2025-09-19","last_action_date":"2025-10-27","actions":2,"obligated":"5273000.00","current_total_value":"5273000.00","potential_total_value":"5273000.00","naics":"237990","psc":"Y1PZ","extent_competed":"FULL AND OPEN COMPETITION","set_aside":"NO SET ASIDE USED.","offers_received":7,"description":"NOYES CUT PHASE 2 - USACE - SAVANNAH DISTRICT","method":"piid","confidence":"high","evidence":["award number W912HN25C5007 equals the contract number","same awarding office W912HN"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"W912HN27RA006","latest_notice_id":"4bded44eb9c9468288a673d06601aeda","title":"Dredged Material Containment Area (DMCA) O&M Construction IDC","solicitation_number":"W912HN27RA006","notice_type":"r","first_type":"r","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-27T23:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","naics":"237990","psc":"Z2KF","set_aside":null,"state":"GA","county":"13051","county_name":"Chatham County","city":"1369000","city_name":"Savannah","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"W912HN27S5002","latest_notice_id":"d31a50911dc548f9a1cb1de6594d1061","title":"Sources Sought: FY27 Liquid Oxygen Supply to J. Strom Thurmond AND Richard B. Russell Dam and Lake Projects Modoc, South Carolina / Elberton, Georgia","solicitation_number":"W912HN27S5002","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-10T16:00:00Z","due_date":"2026-12-10","closes_at":"2026-12-10T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","naics":"325120","psc":"6830","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"J. STROM THURMOND AND RICHARD B. RUSSELL DAM AND LAKE PROJECTS MODOC, SOUTH CAROLINA / ELBERTON, GEORGIA","site":"Russell Dam","site_key":"russell-dam-ga","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"W912HN27BA001","latest_notice_id":"ff8f0c4044c2447dbbe50d49a42f3e46","title":"Tybee Island Shoreline Protection Project","solicitation_number":"W912HN27BA001","notice_type":"o","first_type":"r","first_posted":"2026-10-02","last_posted":"2026-11-23","notices":9,"due_at":"2026-12-10T18:00:00Z","due_date":"2026-12-10","closes_at":"2026-12-10T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","naics":"237990","psc":"Z1KF","set_aside":null,"state":"GA","county":"13051","county_name":"Chatham County","city":"1378036","city_name":"Tybee Island","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"W912HN26MIPEMB","latest_notice_id":"f4c0c908f2ac4b29a21ca8e2586a8b58","title":"Market Intelligence Notice – Pre-Engineered Metal Buildings (PEMB)","solicitation_number":"W912HN26MIPEMB","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-12-18T21:00:00Z","due_date":"2026-12-18","closes_at":"2026-12-18T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","naics":null,"psc":null,"set_aside":null,"state":"GA","county":"13051","county_name":"Chatham County","city":"1369000","city_name":"Savannah","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"W912HN27GREENSBORONCRELO6004","latest_notice_id":"b28b9d01ec82469b8c05b850aa4bc522","title":"Armed Forces Career Center - Greensboro, North Carolina","solicitation_number":"W912HN-27-GREENSBORO-NC-RELO-6004","notice_type":"o","first_type":"o","first_posted":"2026-08-24","last_posted":"2026-08-24","notices":1,"due_at":"2027-09-15T03:59:00Z","due_date":"2027-09-14","closes_at":"2027-09-15T03:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","naics":"5311","psc":"X1AA","set_aside":null,"state":"NC","county":"37081","county_name":"Guilford County","city":"3728000","city_name":"Greensboro","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"removed_at":null,"updated_at":"2026-09-24T11:44:22.582285Z"}],"similar_open":[{"key":"W912HN27RA006","latest_notice_id":"4bded44eb9c9468288a673d06601aeda","title":"Dredged Material Containment Area (DMCA) O&M Construction IDC","solicitation_number":"W912HN27RA006","notice_type":"r","first_type":"r","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-27T23:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","naics":"237990","psc":"Z2KF","set_aside":null,"state":"GA","county":"13051","county_name":"Chatham County","city":"1369000","city_name":"Savannah","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"W912HN27BA001","latest_notice_id":"ff8f0c4044c2447dbbe50d49a42f3e46","title":"Tybee Island Shoreline Protection Project","solicitation_number":"W912HN27BA001","notice_type":"o","first_type":"r","first_posted":"2026-10-02","last_posted":"2026-11-23","notices":9,"due_at":"2026-12-10T18:00:00Z","due_date":"2026-12-10","closes_at":"2026-12-10T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","naics":"237990","psc":"Z1KF","set_aside":null,"state":"GA","county":"13051","county_name":"Chatham County","city":"1378036","city_name":"Tybee Island","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"NAF128F27B0001","latest_notice_id":"bcd7ea49ff0245908f0930219b98a7ad","title":"United States Air Force Academy (USAFA) Varsity Baseball Stadium","solicitation_number":"NAF128F27B0001","notice_type":"p","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":2,"due_at":"2026-11-27T08:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T08:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9128F","office_name":"W071 ENDIST OMAHA","naics":"237990","psc":"Y1FB","set_aside":"SBA","state":"CO","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"ERDLE FIELD, UNITED STATES AIR FORCE ACADEMY, COLORADO","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"}],"similar_open_total":143,"indexable":false}