Advance Notice - Maintenance Dredging of Sandy Hook Channel, New York Harbor, Federal Navigation Project
W912DS25BA007
Department of the Army, W2SD Endist New York. Other Heavy and Civil Engineering Construction.
Response deadline
April 29, 2025 at 2:00 PM EDT
Closed 575 days ago. Posted April 14, 2025. Scheduled to archive June 5, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
143 like it are open now in other heavy and civil engineering construction
- Maintenance Dredging of New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project
Department of the Army, W2SD Endist New York
Sources soughtNAICS 237990New YorkW912DS27S0009Due in 7 daysDec 2 - RFI USMMA Campus Modernization Program SATOC Seawall Project
Department of the Army, W2SD Endist New York
Sources soughtNAICS 237990Kings Point, NYW912DS27S0006Closes in 9 daysDec 4 - Dredge Entrance Channel (FY27) - Station Eatons Neck
US Coast Guard, Ceu Providence
PresolicitationSmall businessNAICS 237990Northport, NY70ZS0627BSLIS0031Closes in 48 daysJan 12, 2027
All 143 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
Background Information
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the New York Harbor, Sandy Hook Federal Navigation Channel. The dredged material would be dredged and subsequently transported to and placed at the Sea Bright Offshore Borrow Area (SBOBA), 5 miles southeast of Sandy Hook Point, NJ, and a stockpile placement at Lot J of the National Park Service (NPS) Sandy Hook Gateway National Recreation Area or at other stockpile site(s) identified by NPS. All stockpile site(s) are subject to change at the discretion of NPS and/or USACE. The proposed maintenance dredging would remove approximately 200,000 cubic yards of selected critical shoals from the Sandy Hook Channel. An estimated 15,000 to 20,000 CY of dredged material would be placed within the stockpile site identified above. Dredging would be required to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable overdepth. The dredged material is expected to consist primarily of sand and gravel.
The purpose of the proposed work is to alleviate the effects of shoaling and restore the authorized project dimensions, thereby providing safe and economical use of Sandy Hook Channel by military, commercial and recreational boating interests while providing future beneficial use of the dredged material.
Based on past dredging cycles, it is recommended that the proposed work only be performed by utilizing a mechanical dredge with a clamshell bucket. Additionally, multiple ocean-going barges, tug boats and ancillary equipment will be needed to perform the dredging, transport and placement activities. Placement at the stockpile site(s) may require scow, barge, or similar equipment with pump out capabilities. The entire channel will generally not require maintenance dredging; only areas where shoaling has reduced the depth of the channel will require dredging. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the placement site is located.
The Contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and to prosecute said work diligently and to complete all basic work ready for use not later than ninety (90) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 8,000 cubic yards per calendar day.
The work is estimated to cost between $1,000,000 and $5,000,000. Solicitation for the subject project is expected to be available in June 2025, with bid opening in July 2025. It is the intention of the government to award in August 2025 and issue the NTP within fourteen (14) calendar days of the award date.
Liquidated Damages of $2,810.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete.
This is an unrestricted Procurement.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 14, 2025
Special notice
Due April 29, 2025 at 2:00 PM EDT. SAM.gov, notice ebb11eb538a74de49fbab581781680f3
5 revisions on SAM
- April 15, 2025: publish, special notice
- March 17, 2025: publish, sources sought
- April 15, 2025: publish, special notice
- April 14, 2025: publish, special notice
- April 14, 2025: publish, special notice