Special notice
Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base
W912BV25S0014
Department of the Army, W076 Endist Tulsa. Commercial and Institutional Building Construction.
Response deadline
February 18, 2025 at 9:00 AM EST
Closed 646 days ago. Posted January 23, 2025. Scheduled to archive March 5, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
193 like it are open now in commercial and institutional building construction
- Child Development Center (CDC), Tinker Air Force Base, Oklahoma
Department of the Army, W076 Endist Tulsa
Due in 5 daysDec 1 - Thomas P. Stafford Building (TPS) Restroom Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK
Federal Aviation Administration, 6973GH Franchise Acquisition SVCS
Sources soughtNAICS 236220OklahomaTPSBathroomUpgradesCloses in 8 daysDec 4 - McGee Creek Natural Scenic Recreation Area (NSRA) Improvements
Departmental Offices, Reclamation Contracting Activity
Sources soughtNAICS 236220Oklahoma140RR027R0020Closes in 8 daysDec 4
All 193 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
The United States Army Corps of Engineers (USACE) Tulsa District will be hosting a Virtual Industry Forum on 18 February 2025 from 9am to 10am (Central Time) to provide information and gauge interest on the construction of the future bomber campus at Tinker Air Force Base, Oklahoma City, OK. Tulsa District also seeks industry feedback concerning the possible development of a Hangar MATOC.
The Tulsa District has identified the need to reach out to the construction community and highlight this opportunity available to industry. All prospective prime contractors or subcontractors interested to learn more about the Tulsa District’s upcoming Bomber Agile Common Hangar (BACH) and other hangar projects are invited to attend.
The meeting will be held virtually (MS Teams). Contracting and technical representatives will provide information on this project.
If you would like to attend, please send an email to Jon Larvick (contract specialist) at Jon.A.Larvick@usace.army.mil and provide names, company name, and emails of individuals you'd like invited.
This Bomber Agile Common Hangar (BACH) project constructs a 4-dock hangar for program depot maintenance. The hangar will be 18,302 SM (197,003sf) with associated 39,052 SM (420,352sf) of Apron Paving. The facility consists of a single-story structural steel framed hangar bay with full span trusses on a cast-in-place concrete slab. Support spaces include a single-story shop side with a two-story administration side constructed as a steel framed system, including restrooms and lockers, private offices, administrative space, breakroom and FEMA storm shelter, and hazardous material storage space. The hangar bay will be comprised of a standing seam metal roof with the support areas having a low slope single ply membrane roof. Special deep foundations consisting of piers & driven piles are required. Supporting facilities include all necessary utilities and connections, site demolition and earthwork, apron pavements, fencing, and site improvements to provide a complete and useable facility. This project will utilize natural gas instead of an all-electric design per Executive Order 14057 since the project was at 35% design on 16 Jan 24. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01. An existing airfield pavement tow-way is being expanded to connect across S Douglas Blvd to the existing airfield.
The 65% design documents and Industry Forum slide deck are attached to this special notice for your information and question preparation.
In accordance with FAR 36/DFARs 236.204, the estimated construction price range for this project is between $250 million and $500 million dollars.
Industry Forum Virtual Meeting Information:
Interested parties must email Jon Larvick (jon.a.larvick@usace.army.mil) to get a MS TEAMS invite prior to the scheduled forum.
After the Industry Forum, interested parties may ask questions via the Bidder Inquiry system (ProjNet).
Bidder Inquiry in ProjNet at https://www.projnet.org/projnet:
Project Name: BACH Industry Forum
Bidder Inquiry Key: QJF6H2-BW29SP
ProjNet will be open for inquiries from 14 Feb 25 through 7 Mar 25.
All Government responses to inquiries submitted in ProjNet will be posted in ProjNet for all interested parties to review. Enter only one question per entry. If multiple questions are entered per inquiry, the inquiry will not be acknowledged.
Following the Industry Forum, the Government is interested in speaking with prime construction contractors and subcontractors and will host one-on-one meetings. Interested firms shall submit an email no later than the close of business on the day of the Industry Forum with the following information: their interest in the project, a description of any recent and relevant experience they have performed, and a capabilities statement. If selected, firms shall be prepared to discuss their interest, experience and capabilities during their one-on-one sessions with the Government. These meetings are intended to allow interested firms to provide specification feedback that may be proprietary or otherwise inappropriate for ProjNet publication and will not be a question-and-answer format. The Government will not answer questions or share additional specification clarification during one-on-one discussions. Submit responses to Shay Hill at julie.s.hill@usace.army.mil and Jon Larvick at jon.a.larvick@usace.army.mil.
The anticipated North American Industry Classification System code for this procurement is 236220, Commercial and Institutional Building Construction, which has a small business size standard of $45M.
As a reminder, this notice does not constitute a solicitation. This announcement and the industry day event are for planning purposes only, and response to this notice is strictly voluntary. The Government will not reimburse any party attending or participating for costs incurred for this event or marketing efforts.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- WWYK263009_65_NG_energy model results.pdf187 KB, January 23, 2025
- WWYK263009_65_NG-LCCA_BLCC results.pdf207 KB, January 23, 2025
- WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf303 KB, January 23, 2025
- WWYK263009_Geotechnical Report_Draft with Appendices.pdf6.0 MB, January 23, 2025
- WWYK263009_65 Redlined Specifications_Part2.pdf7.8 MB, January 23, 2025
- WWYK263009_65 Redlined Specifications_Part1.pdf16.1 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 2_Part6.pdf5.6 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 2_Part5.pdf4.1 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 2_Part4.pdf8.8 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 2_Part3.pdf6.8 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 2_Part2.pdf9.7 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 2_Part1.pdf15.1 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf159 KB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part6.pdf13.4 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part5.pdf1.4 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf13.3 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part3.pdf13.4 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part2.pdf14.3 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf16.2 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part7_Part3.pdf6.5 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part7_Part2.pdf3.2 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf5.6 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf10.2 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part1.pdf7.9 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part6_Part3.pdf9.3 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf6.1 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf2.5 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part5.pdf8.2 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part4.pdf9.6 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part3.pdf18.2 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part2.pdf17.2 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part1_Part10.pdf2.1 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf7.8 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part1_Part8.pdf7.3 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf4.5 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part1_Part6.pdf4.7 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf4.8 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part1_Part4.pdf5.0 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part1_Part3.pdf4.8 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf5.8 MB, January 23, 2025
- WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf7.9 MB, January 23, 2025
- WWYK263009_65 Design Analysis Part 28_Part5.pdf3.4 MB, January 23, 2025
- WWYK263009_65 Design Analysis Part 28_Part4.pdf194 KB, January 23, 2025
- WWYK263009_65 Design Analysis Part 28_Part3.pdf3.9 MB, January 23, 2025
- WWYK263009_65 Design Analysis Part 28_Part2.pdf12.3 MB, January 23, 2025
- WWYK263009_65 Design Analysis Part 28_Part1.pdf7.3 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part27.pdf11.5 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part26.pdf8.1 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part25.pdf2.4 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part24.pdf1.1 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part23.pdf6.8 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part22_Part5.pdf2.7 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part22_Part4_Part4.pdf2.6 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf8.4 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf8.1 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part22_Part4_Part1.pdf627 KB, January 23, 2025
- WWYK263009_65 Design Analysis_Part22_Part3.pdf2.6 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part22_Part2.pdf2.4 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part22_Part1.pdf3.2 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part21.pdf16.8 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part20.pdf14.1 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part19_Part6.pdf1.7 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part19_Part5.pdf514 KB, January 23, 2025
- WWYK263009_65 Design Analysis_Part19_Part4.pdf2.2 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part19_Part3.pdf7.0 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part19_Part2.pdf9.2 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part19_Part1.pdf13.4 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part18_Part6.pdf7.2 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part18_Part5.pdf10.6 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part18_Part4.pdf12.3 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part18_Part3.pdf195 KB, January 23, 2025
- WWYK263009_65 Design Analysis_Part18_Part2.pdf515 KB, January 23, 2025
- WWYK263009_65 Design Analysis_Part18_Part1.pdf495 KB, January 23, 2025
- WWYK263009_65 Design Analysis_Part17.pdf725 KB, January 23, 2025
- WWYK263009_65 Design Analysis_Part16.pdf2.7 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part15.pdf1.5 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part14.pdf3.1 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part13.pdf871 KB, January 23, 2025
- WWYK263009_65 Design Analysis_Part12_Part6.pdf375 KB, January 23, 2025
- WWYK263009_65 Design Analysis_Part12_Part5.pdf376 KB, January 23, 2025
- WWYK263009_65 Design Analysis_Part12_Part4.pdf375 KB, January 23, 2025
- WWYK263009_65 Design Analysis_Part12_Part3.pdf1.8 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part12_Part2.pdf13.6 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part12_Part1.pdf8.9 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part11.pdf12.4 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part10.pdf6.7 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part9.pdf6.3 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part8.pdf9.4 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part7.pdf7.0 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part6.pdf5.8 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part5.pdf4.2 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part4.pdf10.4 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part3.pdf4.3 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part2.pdf3.5 MB, January 23, 2025
- WWYK263009_65 Design Analysis_Part1.pdf1.8 MB, January 23, 2025
- Bomber Agile Common Hangar Industry Forum Presentation.pdf4.1 MB, January 23, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 23, 2025
Special notice
Due February 18, 2025 at 9:00 AM EST. SAM.gov, notice e8ff9c45d0f04296b0740b8ace0fe7b2
1 revision on SAM
- January 23, 2025: publish, special notice
Points of contact
- Jon Larvickjon.a.larvick@usace.army.mil9186694316
- Julie S. Hilljulie.s.hill@usace.army.mil9186697699