# Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base

Canonical: https://sealedbidder.com/opportunities/w912bv25s0014

- Solicitation number: W912BV25S0014
- Notice type: Special notice
- Status: Closed. Deadline was February 18, 2025 at 9:00 AM EST
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W076 Endist Tulsa (W912BV)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Y1BZ Construction Of Other Airfield Structures
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236220)
- Place of performance: Oklahoma City, Oklahoma
- City: Oklahoma City. https://sealedbidder.com/cities/oklahoma-city-ok-4055000
- First posted: January 23, 2025
- Last posted: January 23, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/e8ff9c45d0f04296b0740b8ace0fe7b2/view

## Reading this notice

- Kind of notice: Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation.

## Description

The United States Army Corps of Engineers (USACE) Tulsa District will be hosting a Virtual Industry Forum on 18 February 2025 from 9am to 10am (Central Time) to provide information and gauge interest on the construction of the future bomber campus at Tinker Air Force Base, Oklahoma City, OK.  Tulsa District also seeks industry feedback concerning the possible development of a Hangar MATOC.

The Tulsa District has identified the need to reach out to the construction community and highlight this opportunity available to industry.  All prospective prime contractors or subcontractors interested to learn more about the Tulsa District&rsquo;s upcoming Bomber Agile Common Hangar (BACH) and other hangar projects are invited to attend.

The meeting will be held virtually (MS Teams).  Contracting and technical representatives will provide information on this project.

If you would like to attend, please send an email to Jon Larvick (contract specialist) at Jon.A.Larvick@usace.army.mil and provide names, company name, and emails of individuals you'd like invited.

This Bomber Agile Common Hangar (BACH) project constructs a 4-dock hangar for program depot maintenance. The hangar will be 18,302 SM (197,003sf) with associated 39,052 SM (420,352sf) of Apron Paving. The facility consists of a single-story structural steel framed hangar bay with full span trusses on a cast-in-place concrete slab. Support spaces include a single-story shop side with a two-story administration side constructed as a steel framed system, including restrooms and lockers, private offices, administrative space, breakroom and FEMA storm shelter, and hazardous material storage space. The hangar bay will be comprised of a standing seam metal roof with the support areas having a low slope single ply membrane roof. Special deep foundations consisting of piers & driven piles are required. Supporting facilities include all necessary utilities and connections, site demolition and earthwork, apron pavements, fencing, and site improvements to provide a complete and useable facility.  This project will utilize natural gas instead of an all-electric design per Executive Order 14057 since the project was at 35% design on 16 Jan 24.  Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01. An existing airfield pavement tow-way is being expanded to connect across S Douglas Blvd to the existing airfield.

The 65% design documents and Industry Forum slide deck are attached to this special notice for your information and question preparation.

In accordance with FAR 36/DFARs 236.204, the estimated construction price range for this project is between $250 million and $500 million dollars.

Industry Forum Virtual Meeting Information:

Interested parties must email Jon Larvick (jon.a.larvick@usace.army.mil) to get a MS TEAMS invite prior to the scheduled forum.

After the Industry Forum, interested parties may ask questions via the Bidder Inquiry system (ProjNet).

Bidder Inquiry in ProjNet at https://www.projnet.org/projnet:

Project Name:   BACH Industry Forum

Bidder Inquiry Key:  QJF6H2-BW29SP

ProjNet will be open for inquiries from 14 Feb 25 through 7 Mar 25.

All Government responses to inquiries submitted in ProjNet will be posted in ProjNet for all interested parties to review.  Enter only one question per entry. If multiple questions are entered per inquiry, the inquiry will not be acknowledged.

Following the Industry Forum, the Government is interested in speaking with prime construction contractors and subcontractors and will host one-on-one meetings.  Interested firms shall submit an email no later than the close of business on the day of the Industry Forum with the following information: their interest in the project, a description of any recent and relevant experience they have performed, and a capabilities statement.  If selected, firms shall be prepared to discuss their interest, experience and capabilities during their one-on-one sessions with the Government. These meetings are intended to allow interested firms to provide specification feedback that may be proprietary or otherwise inappropriate for ProjNet publication and will not be a question-and-answer format.  The Government will not answer questions or share additional specification clarification during one-on-one discussions. Submit responses to Shay Hill at julie.s.hill@usace.army.mil and Jon Larvick at jon.a.larvick@usace.army.mil.

The anticipated North American Industry Classification System code for this procurement is 236220, Commercial and Institutional Building Construction, which has a small business size standard of $45M.

As a reminder, this notice does not constitute a solicitation. This announcement and the industry day event are for planning purposes only, and response to this notice is strictly voluntary. The Government will not reimburse any party attending or participating for costs incurred for this event or marketing efforts.

## Attachments

- [WWYK263009_65_NG_energy model results.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3602368f66f64a218f8a58291f4739e8/download)
- [WWYK263009_65_NG-LCCA_BLCC results.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/859526020fb44a8595691930d081ca20/download)
- [WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0dc31f105c3746dbba148c6543ab6b25/download)
- [WWYK263009_Geotechnical Report_Draft with Appendices.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9ca6c906d6f947439751abc5dd286307/download)
- [WWYK263009_65 Redlined Specifications_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/abe5f5be14a24a86b2f6f6cc1cc11a29/download)
- [WWYK263009_65 Redlined Specifications_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c3b9433700e74cd7a9d0febc3e679347/download)
- [WWYK263009_65 Drawings_Volume 2_Part6.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/39500f1e58434d5b9895d54b7ebff4ca/download)
- [WWYK263009_65 Drawings_Volume 2_Part5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/09887c4aedc9492ca1f9c5c59a55dc94/download)
- [WWYK263009_65 Drawings_Volume 2_Part4.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d04cf0e378d3428297482d6e8a11154c/download)
- [WWYK263009_65 Drawings_Volume 2_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f2ad36be42454e599993bd5380d4ce27/download)
- [WWYK263009_65 Drawings_Volume 2_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d3945fc471454af9a3a33244b72eb824/download)
- [WWYK263009_65 Drawings_Volume 2_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c721e938f43e431f812b1c99c1999003/download)
- [WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0fc55a25b4af4763871e95104199212a/download)
- [WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part6.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/90ace26ea01f4594acb2441ffc5d02f4/download)
- [WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e3f7e11d038646faa34b182e12621512/download)
- [WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4d6326e6834c4a579a15edabcd2b6f6b/download)
- [WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e8a60bb734ae4bb7b644f9c775c28162/download)
- [WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c872413f24ab4019939dd831b43d81f8/download)
- [WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1e2053228e864b2199f212940e49a1ce/download)
- [WWYK263009_65 Drawings_Volume 1_Part7_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/98e7b2b220e74827a7c0a8f524e27ee6/download)
- [WWYK263009_65 Drawings_Volume 1_Part7_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cf180cbfb60a4e68bb4e827fc12bbaed/download)
- [WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/80ea94d5a6d548708418d8f4735db979/download)
- [WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/542a2e67760a4ade881d5c30656a70a5/download)
- [WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ecb1f03df3c34b7e92884af92664cb8e/download)
- [WWYK263009_65 Drawings_Volume 1_Part6_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c6afa54fbc0944a8931cdd0100cf25bd/download)
- [WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0c3d6676090b414aa8db43d7fa6353e1/download)
- [WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/01eb9a73092f4a019760e41e8b1c5dc3/download)
- [WWYK263009_65 Drawings_Volume 1_Part5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e0dbc9cf5e184f63998c87fb1c700a77/download)
- [WWYK263009_65 Drawings_Volume 1_Part4.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/144d0108b41a4edc92ae74758cebc56b/download)
- [WWYK263009_65 Drawings_Volume 1_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5b8c0df0723049a9a4a9f8836452bd1e/download)
- [WWYK263009_65 Drawings_Volume 1_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/29685d1b0a2c47f88ee9c6494354ec62/download)
- [WWYK263009_65 Drawings_Volume 1_Part1_Part10.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d06e801a15af40d4880efea4d1da46a6/download)
- [WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7d320b2fb9a2401b83d43ea6267e956a/download)
- [WWYK263009_65 Drawings_Volume 1_Part1_Part8.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9725cac18eb44006956f7172a56a780a/download)
- [WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/504f94e38c4443529733c242580afcc6/download)
- [WWYK263009_65 Drawings_Volume 1_Part1_Part6.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/91553c19f4174f858866d35fee4b21ed/download)
- [WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/82beb46d393a406f8a3c788fb0566c60/download)
- [WWYK263009_65 Drawings_Volume 1_Part1_Part4.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f797f28aea8c419282d23fba28cc5e78/download)
- [WWYK263009_65 Drawings_Volume 1_Part1_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f097a516a61c45fb864d648f9c4a59cf/download)
- [WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/27b896545409422f9bcf021b161a900d/download)
- [WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/304b75409ba5408da6f2054b7a758cdc/download)
- [WWYK263009_65 Design Analysis Part 28_Part5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a74178d250e3449fa73d6942b5a790c0/download)
- [WWYK263009_65 Design Analysis Part 28_Part4.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/79e9eee569be46749a9bbff5a643f9f4/download)
- [WWYK263009_65 Design Analysis Part 28_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0750a7ffc98e493985187594acdf4d8b/download)
- [WWYK263009_65 Design Analysis Part 28_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5d609d3ac8e44d389d3f97b6674e0382/download)
- [WWYK263009_65 Design Analysis Part 28_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b976761ec1534c6fa1766e9a3c115feb/download)
- [WWYK263009_65 Design Analysis_Part27.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/708b879ba50f46a987fe8b30ca9b6e7f/download)
- [WWYK263009_65 Design Analysis_Part26.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5dede06669ce4c44ae21350870f50d6b/download)
- [WWYK263009_65 Design Analysis_Part25.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/97feeba2f8054f72bbbeee5f66360b55/download)
- [WWYK263009_65 Design Analysis_Part24.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0f1345c8decb4aef889c13535ebe02a6/download)
- [WWYK263009_65 Design Analysis_Part23.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/545ab02af80440769aa272b4b7697153/download)
- [WWYK263009_65 Design Analysis_Part22_Part5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e33ff4b42e924059a4307610a6a4859e/download)
- [WWYK263009_65 Design Analysis_Part22_Part4_Part4.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d0796f0af1dd4d1c898845cb6f1498a5/download)
- [WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1acd25f146c645bab68be47ed39bd63a/download)
- [WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/417ecd8c73d54e5fb4acbe10a85ac533/download)
- [WWYK263009_65 Design Analysis_Part22_Part4_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f531da2502fd426884c4b8ec6a149745/download)
- [WWYK263009_65 Design Analysis_Part22_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ba04c53cc2d5446e9e00196b9cb03c84/download)
- [WWYK263009_65 Design Analysis_Part22_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/574032e2456f4a00aeeb1425c29c66a6/download)
- [WWYK263009_65 Design Analysis_Part22_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c4e008fdec974ce08d6b0eea2a449bf6/download)
- [WWYK263009_65 Design Analysis_Part21.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/52ace60e80e640b3af16579d1ffc4511/download)
- [WWYK263009_65 Design Analysis_Part20.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5cd04814d7ef485c8794a1fea94aaaf5/download)
- [WWYK263009_65 Design Analysis_Part19_Part6.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cb23e3d8676a44dd99f59a6c23971584/download)
- [WWYK263009_65 Design Analysis_Part19_Part5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8f42a7f99c4446d9b3b8bf5e698c8b61/download)
- [WWYK263009_65 Design Analysis_Part19_Part4.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6a7e11d1021746a7a7bd2068a8d4f326/download)
- [WWYK263009_65 Design Analysis_Part19_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2807b7e393534b45a9eedc8e4b22b905/download)
- [WWYK263009_65 Design Analysis_Part19_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5936e99c896245168af7b128f5dbbb6c/download)
- [WWYK263009_65 Design Analysis_Part19_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/99181428a80642588d18ce1e3f37f403/download)
- [WWYK263009_65 Design Analysis_Part18_Part6.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/03cbc2247ddf4c2ba429104b8dbaf7f6/download)
- [WWYK263009_65 Design Analysis_Part18_Part5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7206d49b12b8490fa1dac76a732e5c58/download)
- [WWYK263009_65 Design Analysis_Part18_Part4.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bf1ee4126ad749e28633ea670cdb967e/download)
- [WWYK263009_65 Design Analysis_Part18_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/92bbe76d774e4a63875711a297b2da51/download)
- [WWYK263009_65 Design Analysis_Part18_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4ba22d683d95480196529fddde18b88d/download)
- [WWYK263009_65 Design Analysis_Part18_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/86ed5337811446b29cc6170483457eae/download)
- [WWYK263009_65 Design Analysis_Part17.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/273d3f4b9f084d29b0eed8212fcc21fe/download)
- [WWYK263009_65 Design Analysis_Part16.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ffdeb210e80b4cc88d0fd82a5dcb7830/download)
- [WWYK263009_65 Design Analysis_Part15.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7323d43550094a368301d3d7636a2952/download)
- [WWYK263009_65 Design Analysis_Part14.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ab51ffa8622a429a813d7264d4de4cdc/download)
- [WWYK263009_65 Design Analysis_Part13.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a6947f0558a944c3b94652c8f7244e4e/download)
- [WWYK263009_65 Design Analysis_Part12_Part6.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/db09f2991bf64f888fb6cf719e968e48/download)
- [WWYK263009_65 Design Analysis_Part12_Part5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/61e28675fbc54345a8afc5f0e1043fdc/download)
- [WWYK263009_65 Design Analysis_Part12_Part4.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/80e607fa733649c487092a6ff0205bf9/download)
- [WWYK263009_65 Design Analysis_Part12_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7922854abd414d68b5805995e2b89056/download)
- [WWYK263009_65 Design Analysis_Part12_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/011224ee84f84139871015c77d048112/download)
- [WWYK263009_65 Design Analysis_Part12_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/05337c9fc7074217b4eaeb000ed656d3/download)
- [WWYK263009_65 Design Analysis_Part11.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bfc181efd721438aaed99666ec6b3e8c/download)
- [WWYK263009_65 Design Analysis_Part10.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2888f291f1a54b3ea8bb22c03b4d71e7/download)
- [WWYK263009_65 Design Analysis_Part9.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/802e867cfdde4ea5b7142e4d0ffe7e40/download)
- [WWYK263009_65 Design Analysis_Part8.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2dc2a16b4e0a405fa5355df2697b0a0b/download)
- [WWYK263009_65 Design Analysis_Part7.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8603f978ab1d437dadf9b5272b48a1bc/download)
- [WWYK263009_65 Design Analysis_Part6.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b79f4ebd9cb644f1b4f810e7beb7756c/download)
- [WWYK263009_65 Design Analysis_Part5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d48ac7c296c045fb802339fdbc9835cc/download)
- [WWYK263009_65 Design Analysis_Part4.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5821d4ed6b6c4b5480bdca36ab1a4923/download)
- [WWYK263009_65 Design Analysis_Part3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b590dc34adf34d71813d5a3bb6b0c2c8/download)
- [WWYK263009_65 Design Analysis_Part2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9ae4e60cfc4947eeb0c8ac6f5716bb28/download)
- [WWYK263009_65 Design Analysis_Part1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/da566f06118f4866907ed2f2b3e9f9fb/download)
- [Bomber Agile Common Hangar Industry Forum Presentation.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/391b19c3ab5f4c1395e541ef784d297c/download)

## Open now in the same industry

193 open in NAICS 236220.

- Child Development Center (CDC), Tinker Air Force Base, Oklahoma (W912BV26RA016), due December 1, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/w912bv26ra016
- Thomas P. Stafford Building (TPS) Restroom Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK (TPSBathroomUpgrades), due December 4, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/tpsbathroomupgrades
- McGee Creek Natural Scenic Recreation Area (NSRA) Improvements (140RR027R0020), due December 4, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/140rr027r0020

## Publications

- January 23, 2025: Special notice, due February 18, 2025 at 9:00 AM EST. Notice e8ff9c45d0f04296b0740b8ace0fe7b2. https://sam.gov/workspace/contract/opp/e8ff9c45d0f04296b0740b8ace0fe7b2/view

## Points of contact

- Jon Larvick, jon.a.larvick@usace.army.mil, 9186694316
- Julie S. Hill, julie.s.hill@usace.army.mil, 9186697699

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/w912bv25s0014.
