Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,627 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation, total small business set-aside

Repair Fire Suppression

W50S8W-25-Q-A004

Department of the Army, W7N9 Uspfo Activity Wyang 153. Plumbing, Heating, and Air-Conditioning Contractors.

Response deadline

May 6, 2025 at 12:00 PM EDT

Closed 568 days ago. Posted April 24, 2025, first published April 9, 2025. Scheduled to archive May 21, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

58 like it are open now in plumbing, heating, and air-conditioning contractors

All 58 open in plumbing, heating, and air-conditioning contractors

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 27 days from the day the solicitation was posted, April 9, 2025, to the deadline. The deadline moved once: it was first April 25, 2025 and ended as May 6, 2025.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

Fire Pump Inspection and Isolation

  • Contractor shall perform a visual inspection of the fire pump(s), including but not limited to:
    • Pump casing for signs of leaks, cracks, or corrosion
    • Pump shaft and bearings for signs of wear or damage
    • Suction and discharge valves for proper operation
    • Pressure gauges and flow switches for proper function
  • Contractor shall isolate the fire pump(s) from the fire suppression system, ensuring the system remains operational through backup or temporary means during the work.
  • Contractor shall obtain client approval before proceeding with any work.

Seal and Solenoid Replacement

  •  Contractor shall replace the following components on each fire pump:
    • All mechanical seals
    • All solenoid valves
  • Contractor shall use only new, manufacturer-recommended replacement parts.
  • Contractor shall clean and inspect all mating surfaces before installing new seals and solenoids.
  • Contractor shall follow manufacturer specifications and industry best practices for installation and torquing procedures.

Clean Up and Demobilization

  • After replacing the seals and solenoids, the contractor shall reinstate the fire pump(s) into the fire suppression system.
  • Contractor shall perform a comprehensive test of the fire pump(s) and associated systems, including but not limited to:
    • Flow tests to verify pump performance
    • Pressure tests to verify system integrity
    • Alarm and control system functionality
  • Contractor shall record and submit all test results to the client for review and approval.

Amendment 1 - Question asked to add photo's of Fire Pump data plate, Mechanical seals and Solenoids. Photo's added as Attachment #1

Amendment #2 - Due date is being changed to 6 May 2025, a site visit is being scheduled for next week. If you would like to participate in site visit contact; Kristopher Kahle - kristopher.kahle@us.af.mil for date and time. The attached EAL (Attachment #2) form will need to be completed and returned prior to visit in order to be allowed on base. 

Site Visit:

29 Apr 2025 

217 Dell Range Blvd

Cheyenne, WY 82009

Question: The provided images include the fire pump and its data plate, as well as some pictures of the solenoids; however, the images do not clearly show what the solenoids are connected to. Based on the available information, we are assuming these are solenoids for the fire pump controllers.

Answer: These solenoids are for the pre-action system.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 9, 2025

    Solicitation, originally sources sought

    Due April 25, 2025 at 12:00 PM EDT. SAM.gov, notice f68ba9c7deb94cf39c054e959eef9bda

    5 revisions on SAM
    • April 24, 2025: publish, solicitation
    • April 23, 2025: publish, solicitation
    • March 31, 2025: publish, sources sought
    • April 13, 2025: publish, solicitation
    • April 9, 2025: publish, solicitation
  2. April 13, 2025

    Solicitation

    Due April 25, 2025 at 12:00 PM EDT. SAM.gov, notice e7e1a294d6af4e4fbbde3130408e7e1f

    5 revisions on SAM
    • April 24, 2025: publish, solicitation
    • April 23, 2025: publish, solicitation
    • March 31, 2025: publish, sources sought
    • April 13, 2025: publish, solicitation
    • April 9, 2025: publish, solicitation
  3. April 23, 2025

    Solicitation

    Due May 6, 2025 at 12:00 PM EDT. SAM.gov, notice 1c7f50af4f1e499fa8678d0dba3d4db4

    5 revisions on SAM
    • April 24, 2025: publish, solicitation
    • April 23, 2025: publish, solicitation
    • March 31, 2025: publish, sources sought
    • April 13, 2025: publish, solicitation
    • April 9, 2025: publish, solicitation
  4. April 24, 2025

    Solicitation

    Due May 6, 2025 at 12:00 PM EDT. SAM.gov, notice 3832ac79ed21452fab297735445f96fa

    6 revisions on SAM
    • October 8, 2025: publish, award notice
    • April 24, 2025: publish, solicitation
    • April 23, 2025: publish, solicitation
    • March 31, 2025: publish, sources sought
    • April 13, 2025: publish, solicitation
    • April 9, 2025: publish, solicitation

Points of contact