Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,657 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation, total small business set-aside, first published as presolicitation

LTUY232039 Replace Boiler with Heat Pump, Bldg 290 (DESIGN-BUILD) - CANCELLED

W50S8K25RA003

Department of the Army, W7NJ Uspfo Activity Moang 131. Plumbing, Heating, and Air-Conditioning Contractors.

Status

Cancelled

The agency cancelled this solicitation, so it takes no offers. Responses had been due September 12, 2025 at 11:00 AM EDT. Last posted September 24, 2025, first published July 9, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

58 like it are open now in plumbing, heating, and air-conditioning contractors

All 58 open in plumbing, heating, and air-conditioning contractors

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 35 days from the day the solicitation was posted, August 8, 2025, to the deadline.
Before the solicitation
The agency published a presolicitation on July 9, 2025, 30 days before the solicitation.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The primary objective of this project is to replace the existing hot water boiler, heating fan coil units, and window air conditioning units with a centralized energy efficient air source heat pump system. The selected contractor shall design and install the new heating and cooling system for Building 290, Jefferson Barracks Air National Guard Station (ANGS) via a Design-Build contract.
The following items will be included in this project:

- existing hotwater boiler, pumps, and piping within the boiler room are to removed
- seven (7) lighting occupancy sensors for office spaces are to be installed replacing existing manual light switches
- replace existing domestic water heater
- install Direct Digital Controls (DDC) in order to operate the air source heating and cooling system
- any required upgrades to the Building 290 facility's system, for example, electrical system, if required.

The contract duration will be 180 calendar days after notice to proceed to include inspections and punch list, which is negotiable. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 238220, with a small business size standard of $19 million. The magnitude of construction is between $100,000 and $250,000. The Government's budget for this project is $150,000.

NOTE: To access Attachment #2 to the RFP, Design Sustainability Scoresheet, please email the POCs on this notice to request a copy. Due to file type, the document cannot be uploaded to SAM.

In accordance with FAR 36.211(b), the following information is provided:

(1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.

(2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.

DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non-Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor’s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see “History” section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.

Update 5 September 2025: A PDF drawing of the building from a previus project has been added to files per contractor request. Associated CAD files are available, please email the POCs on this notice to be sent them. SAM.gov does not support uploading these files. DISCLAIMER: The Government does not guarantee the accuracy of these drawings and files. They are provided for informational purposes only and will not be incorporated into the contract. The Government does not have complete as-builts for this facility. If anyone need to view the site again to confirm existing site conditions prior to submitting a proposal, please contact the POCs on this notice to schedule.

Update 24 September 2025: This project has been cancelled for FY25.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 9, 2025

    Presolicitation

    LTUY232039 Replace Boiler with Heat Pump, Bldg 290 (DESIGN-BUILD)

    SAM.gov, notice 1db49ab9aaa545379288b4ec78abef91

    2 revisions on SAM
    • August 8, 2025: publish, solicitation
    • July 9, 2025: publish, presolicitation
  2. August 8, 2025

    Solicitation, originally presolicitation

    LTUY232039 Replace Boiler with Heat Pump, Bldg 290 (DESIGN-BUILD)

    Due September 12, 2025 at 11:00 AM EDT. SAM.gov, notice 78fc3e56a06d4bfd8133b0723d8e9465

    4 revisions on SAM
    • September 24, 2025: publish, solicitation
    • September 5, 2025: publish, solicitation
    • August 8, 2025: publish, solicitation
    • July 9, 2025: publish, presolicitation
  3. September 5, 2025

    Solicitation

    LTUY232039 Replace Boiler with Heat Pump, Bldg 290 (DESIGN-BUILD)

    Due September 12, 2025 at 11:00 AM EDT. SAM.gov, notice a26b1f720f5d4adeb4dc287c27527f85

    4 revisions on SAM
    • September 24, 2025: publish, solicitation
    • September 5, 2025: publish, solicitation
    • August 8, 2025: publish, solicitation
    • July 9, 2025: publish, presolicitation
  4. September 24, 2025

    Solicitation

    Due September 12, 2025 at 11:00 AM EDT. SAM.gov, notice 1dd77616888949b89635937dbe75a0f5

    4 revisions on SAM
    • September 24, 2025: publish, solicitation
    • September 5, 2025: publish, solicitation
    • August 8, 2025: publish, solicitation
    • July 9, 2025: publish, presolicitation

Points of contact