Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,666 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Solicitation

SUBASE Kings Bay Car Wash Equipment Replacement

NAVMWR-25-Q-0018

Department of the Navy, Commander Navy Installations CMD. Car Washes.

Response deadline

January 23, 2025 at 4:00 PM EST

Closed 673 days ago. Posted January 13, 2025, first published December 26, 2024. Scheduled to archive February 7, 2025.

Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 811192 (car washes), means no more than $9 million in average annual receipts, counted with affiliates. What a set-aside is
Time to respond
Bidders had 28 days from the day the solicitation was posted, December 26, 2024, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The Contractor shall provide all services, including materials, labor and installation required for the complete removal and replacement of a four (4) bay self-service car wash system located at SUBASE Kings Bay.

Work shall include but is not limited to the following:

1. Site Investigation: The Contractor shall provide and perform all necessary site investigation and utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Point of Contact (POC).

2. Materials: The Contractor shall provide all materials, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work.

3. Disposal: The Contractor is responsible for the disposal of all waste materials generated as part of this project and shall remove all waste and equipment to an offsite area. All and laydown area will be designated for the new equipment and disposal containers. Also, the Contractor shall clean up the work site daily to the satisfaction of the POC.

4. Demolition: The Contractor shall remove all materials not required for the operation of the proposed systems within all four (4) existing car wash bays and supporting spaces, while retaining all code required items. The existing Self-Service Multi-Pressure Car Wash system including water hoses and plumbing lines, all existing bay controls and meters, and all existing 360 degree and 180 degree pressure booms. The Contractor shall remove the existing bill changer and dispose of as stated above. The Contractor shall also remove and dispose of all existing operational wall signage, and all wall accessories typical for all four (4) bays.

5. Renovation: The Contractor shall furnish install a new Self-Service Multi-Pressure Car Wash System. The new Self-Service Car Wash System shall include all new hoses and plumbing lines to support the new system. The system shall include the minimum of the following functions:

  • Tire Cleaner
  • Presoak
  • High Pressure Soap
  • Wax
  • Rinse
  • Spot-Free Rinse
  • Bug Off
  • Foam Brush
  • Foam Conditioner

6. The Contractor shall provide all the chemicals and detergents for the duration of start-up testing and inspections to ensure the Self-Service Car Wash System is fully operational.

7. The Contractor shall furnish and install four (4) new 360-degree Pressure Spray Wand Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required. The Contactor shall install four (4) new 180- degree Foam Conditioner Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required.


8. Renovation: The Contractor shall furnish and install in all four (4) bays the following accessories:

  • Foam Brush Buckets
  • High Pressure Wand Holders
  • Bay Hooks
  • Matt Clamps
  • Menu Board and Operational Signage

9. Renovation: The Contractor shall furnish and install four (4) new Self-Serve Car Wash
POS Control Meters. The new Bay Control Meters shall have a coin and credit card option.
The individual credit card reader must be compatible with NAYAX payment and
management system. The Contractor shall insure that the Point of Sale (POS) system is
compatible with the Installation Morale Welfare and Recreation (MWR) department’s
existing NAYAX system. The Government will provide 3rd party encryption and process
separately from this contract.


10. Renovation: The Contractor shall install a new weatherproof electrical vending machine
that will be compatible with the same payment option as line item ten (10) above. The
vending machine options shall include items such as:

  • Towels
  • Wipes
  • Protectants
  • Shines
  • Cleaners
  • Deodorizers
  • Air Fresheners

11. The Contractor shall furnish and install a new bill changer matching existing unit
configurations at the same location as existing.


12. Renovation: The Contractor shall install all new equipment and related accessories, as
per manufacturer’s installation guidelines.
If the Contractor is quoting an “equal” to the listed product herein, the Contractor shall
submit complete specifications on the “equal” product with the response to this RFQ. The
specifications will be reviewed by the POC and Contracting Officer (KO) for possible use
on this project.


13. Submittal: The Contractor shall submit a Signage Graphics package to the POC for
approval fifteen (15) days prior to fabrication. All new merchandising and operational
signage must comply with the MWR Brand Standards.


14. Preservation: The Contractor shall protect existing adjacent materials, especially wall and
floor surfaces, from any and all damage during the work, by utilizing walk pads,
construction screens and other industry best practices protection methods.


15. Restoration: The Contractor shall repair and/or replace all facility elements impacted
and/or damaged by work, to the satisfaction of the POC. The Contractor shall patch, paint
and/or otherwise restore all building materials, including but not limited to, wall and floor
surfaces damaged by work; to the satisfaction of the POC.


16. Warranties: The Contractor shall provide a warranty on all materials i.e chemicals and
detergents/equipment and labor for a period of one (1) year, or longer if standard for materials/equipment, from the date of acceptance by the KO. The Contractor shall refer to Section H and I for additional information regarding warranties and extended warranties.


17. The Contractor shall provide an Operations and Maintenance (O&M) Manual to the POC and KO, as instructed. Also, the Contractor shall provide instruction and training to the POC, MWR facility staff and PWD representatives on the care and maintenance of all installed equipment and systems, using the O&M Manual as the training basis.

Site Inspection

The Contractor shall examine the site and determine for themselves the existing conditions and
general character of the site. Claims for additional costs due to conditions that could have been
verified by site investigation will not be authorized. Contractor shall contact the POC to schedule
the Site Inspection.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. December 26, 2024

    Solicitation

    Due January 23, 2025 at 4:00 PM EST. SAM.gov, notice 8004162a6cfb4f6281566412f43ddfc0

  2. January 6, 2025

    Solicitation

    Due January 23, 2025 at 4:00 PM EST. SAM.gov, notice 9525c31dbea349e68cc20235903b5848

    3 revisions on SAM
    • January 13, 2025: publish, solicitation
    • January 6, 2025: publish, solicitation
    • December 26, 2024: publish, solicitation
  3. January 13, 2025

    Solicitation

    Due January 23, 2025 at 4:00 PM EST. SAM.gov, notice 1362801666dc4e8bad9174006f5280f9

    3 revisions on SAM
    • January 13, 2025: publish, solicitation
    • January 6, 2025: publish, solicitation
    • December 26, 2024: publish, solicitation

Points of contact