# SUBASE Kings Bay Car Wash Equipment Replacement

Canonical: https://sealedbidder.com/opportunities/navmwr25q0018

- Solicitation number: NAVMWR-25-Q-0018
- Notice type: Solicitation
- Status: Closed. Deadline was January 23, 2025 at 4:00 PM EST
- Department: Department of the Navy
- Agency: Department of the Navy
- Contracting office: Commander Navy Installations CMD (N4571A)
- NAICS: 811192 Car Washes
- Product or service code: J025 Maintenance, Repair and Rebuilding of Equipment: Vehicular Equipment Components
- Small business size standard: $9 million in average annual receipts (13 CFR 121.201, NAICS 811192)
- Place of performance: Kings Bay, Georgia
- County: Camden County (FIPS 13039). https://sealedbidder.com/counties/camden-county-ga-13039
- City: Kings Bay Base. https://sealedbidder.com/cities/kings-bay-base-ga-1343580
- First posted: December 26, 2024
- Last posted: January 13, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/1362801666dc4e8bad9174006f5280f9/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 811192 (car washes), means no more than $9 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 28 days from the day the solicitation was posted, December 26, 2024, to the deadline.

## Description

The Contractor shall provide all services, including materials, labor and installation required for the complete removal and replacement of a four (4) bay self-service car wash system located at SUBASE Kings Bay.

Work shall include but is not limited to the following:

1. Site Investigation: The Contractor shall provide and perform all necessary site investigation and utility locates (including, but not limited to, sub-surface utility &ldquo;pot holing&rdquo;) as required to complete the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Point of Contact (POC).

2. Materials: The Contractor shall provide all materials, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work.

3. Disposal: The Contractor is responsible for the disposal of all waste materials generated as part of this project and shall remove all waste and equipment to an offsite area. All and laydown area will be designated for the new equipment and disposal containers. Also, the Contractor shall clean up the work site daily to the satisfaction of the POC.

4. Demolition: The Contractor shall remove all materials not required for the operation of the proposed systems within all four (4) existing car wash bays and supporting spaces, while retaining all code required items. The existing Self-Service Multi-Pressure Car Wash system including water hoses and plumbing lines, all existing bay controls and meters, and all existing 360 degree and 180 degree pressure booms. The Contractor shall remove the existing bill changer and dispose of as stated above. The Contractor shall also remove and dispose of all existing operational wall signage, and all wall accessories typical for all four (4) bays.

5. Renovation: The Contractor shall furnish install a new Self-Service Multi-Pressure Car Wash System. The new Self-Service Car Wash System shall include all new hoses and plumbing lines to support the new system. The system shall include the minimum of the following functions:

	Tire Cleaner

	Presoak

	High Pressure Soap

	Wax

	Rinse

	Spot-Free Rinse

	Bug Off

	Foam Brush

	Foam Conditioner

6. The Contractor shall provide all the chemicals and detergents for the duration of start-up testing and inspections to ensure the Self-Service Car Wash System is fully operational.

7. The Contractor shall furnish and install four (4) new 360-degree Pressure Spray Wand Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required. The Contactor shall install four (4) new 180- degree Foam Conditioner Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required.

8. Renovation: The Contractor shall furnish and install in all four (4) bays the following accessories:

	Foam Brush Buckets

	High Pressure Wand Holders

	Bay Hooks

	Matt Clamps

	Menu Board and Operational Signage

9. Renovation: The Contractor shall furnish and install four (4) new Self-Serve Car Wash

POS Control Meters. The new Bay Control Meters shall have a coin and credit card option.

The individual credit card reader must be compatible with NAYAX payment and

management system. The Contractor shall insure that the Point of Sale (POS) system is

compatible with the Installation Morale Welfare and Recreation (MWR) department&rsquo;s

existing NAYAX system. The Government will provide 3rd party encryption and process

separately from this contract.

10. Renovation: The Contractor shall install a new weatherproof electrical vending machine

that will be compatible with the same payment option as line item ten (10) above. The

vending machine options shall include items such as:

	Towels

	Wipes

	Protectants

	Shines

	Cleaners

	Deodorizers

	Air Fresheners

11. The Contractor shall furnish and install a new bill changer matching existing unit

configurations at the same location as existing.

12. Renovation: The Contractor shall install all new equipment and related accessories, as

per manufacturer&rsquo;s installation guidelines.

If the Contractor is quoting an &ldquo;equal&rdquo; to the listed product herein, the Contractor shall

submit complete specifications on the &ldquo;equal&rdquo; product with the response to this RFQ. The

specifications will be reviewed by the POC and Contracting Officer (KO) for possible use

on this project.

13. Submittal: The Contractor shall submit a Signage Graphics package to the POC for

approval fifteen (15) days prior to fabrication. All new merchandising and operational

signage must comply with the MWR Brand Standards.

14. Preservation: The Contractor shall protect existing adjacent materials, especially wall and

floor surfaces, from any and all damage during the work, by utilizing walk pads,

construction screens and other industry best practices protection methods.

15. Restoration: The Contractor shall repair and/or replace all facility elements impacted

and/or damaged by work, to the satisfaction of the POC. The Contractor shall patch, paint

and/or otherwise restore all building materials, including but not limited to, wall and floor

surfaces damaged by work; to the satisfaction of the POC.

16. Warranties: The Contractor shall provide a warranty on all materials i.e chemicals and

detergents/equipment and labor for a period of one (1) year, or longer if standard for materials/equipment, from the date of acceptance by the KO. The Contractor shall refer to Section H and I for additional information regarding warranties and extended warranties.

17. The Contractor shall provide an Operations and Maintenance (O&M) Manual to the POC and KO, as instructed. Also, the Contractor shall provide instruction and training to the POC, MWR facility staff and PWD representatives on the care and maintenance of all installed equipment and systems, using the O&M Manual as the training basis.

Site Inspection

The Contractor shall examine the site and determine for themselves the existing conditions and

general character of the site. Claims for additional costs due to conditions that could have been

verified by site investigation will not be authorized. Contractor shall contact the POC to schedule

the Site Inspection.

## Attachments

- [NAVMWR-25-Q-0018.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/52128b1c3dfa4e3287ee5e96ced5ccd6/download)
- [NAVMWR-25-Q-0018-0001.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9a1039f55b184666b606e25830892457/download)

## Publications

- December 26, 2024: Solicitation, due January 23, 2025 at 4:00 PM EST. Notice 8004162a6cfb4f6281566412f43ddfc0. https://sam.gov/workspace/contract/opp/8004162a6cfb4f6281566412f43ddfc0/view
- January 6, 2025: Solicitation, due January 23, 2025 at 4:00 PM EST. Notice 9525c31dbea349e68cc20235903b5848. https://sam.gov/workspace/contract/opp/9525c31dbea349e68cc20235903b5848/view
- January 13, 2025: Solicitation, due January 23, 2025 at 4:00 PM EST. Notice 1362801666dc4e8bad9174006f5280f9. https://sam.gov/workspace/contract/opp/1362801666dc4e8bad9174006f5280f9/view

## Points of contact

- Nika Maldonado, nika.n.maldonado.naf@us.navy.mil, 9019307728

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/navmwr25q0018.
