Solicitation
Overhaul of B-1 Fairing Seal Pressure Regulating Valve
FA811824R0048
Department of the Air Force, FA8118 AFSC Pzabb. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Response deadline
August 15, 2024 at 4:00 PM EDT
Closed 832 days ago. Posted July 9, 2024, first published June 13, 2024. Scheduled to archive August 30, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
566 like it are open now in other aircraft parts and auxiliary equipment manufacturing
- OVERHAUL B-1 ELECTRO-MECHANICAL ACTUATORS
Department of the Air Force, FA8118 AFSC Pzabb
SolicitationNAICS 336413OklahomaFA811827RB001Due in 2 daysNov 27 - Cylinder Assembly, A
Defense Logistics Agency, DLA Aviation at Oklahoma City, Ok
SolicitationNAICS 336413Ship to OKSPRTA127R0016Due in 4 daysNov 29 - Repair of E-3 Temperature Indicator
Department of the Air Force, FA8117 AFSC Pzaba
PresolicitationNAICS 336413OklahomaFA811727RB002Due in 4 daysNov 29
All 566 open in other aircraft parts and auxiliary equipment manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336413 (other aircraft parts and auxiliary equipment manufacturing), means no more than 1,250 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 63 days from the day the solicitation was posted, June 13, 2024, to the deadline. The deadline moved once: it was first July 15, 2024 and ended as August 15, 2024.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Bl regulating valve is unique to the Bl aircraft. The regulating valve provides pressure regulation of the air supply to the wing fairing inflatable seals. Heat is transferred from a hot ethylene glycol water (EGW) circuit to cold ram air to maintain the desired EGW outlet temperature. The load heat exchanger is a four pass liquid to air through the cold air inlet and flows through the multilayer core, exiting through the cold air outlet.
EGW liquid enters the multilayer core, perpendicular to the cold circuit in a circuit along the cold inlet core face. The EGW fluid then enters an external header and flows to the cold outlet end of the load heat exchanger. The EGW fluid makes four passes through the core before exiting through the EGW outlet. Please see attached for more information.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Jessica Vinyardjessica.vinyard.1@us.af.mil
- Jacqueline Westjacqueline.west@us.af.mil4057362431