# Overhaul of B-1 Fairing Seal Pressure Regulating Valve

Canonical: https://sealedbidder.com/opportunities/fa811824r0048

- Solicitation number: FA811824R0048
- Notice type: Solicitation
- Status: Closed. Deadline was August 15, 2024 at 4:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA8118 AFSC Pzabb (FA8118)
- NAICS: 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Product or service code: 4810 Valves, Powered
- Small business size standard: 1,250 employees (13 CFR 121.201, NAICS 336413)
- Place of performance: Tinker AFB, Oklahoma
- Who can bid, by location: Anywhere in the US. Location does not limit who can bid: a product shipped to the buyer, research at the performer's facility, or work at the contractor's site. A state shown is the delivery point.
- First posted: June 13, 2024
- Last posted: July 9, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/c2efc69c531142c6af21f6601af1e53b/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336413 (other aircraft parts and auxiliary equipment manufacturing), means no more than 1,250 employees, counted with affiliates.
- Time to respond: Bidders had 63 days from the day the solicitation was posted, June 13, 2024, to the deadline. The deadline moved once: it was first July 15, 2024 and ended as August 15, 2024.

## Description

The Bl regulating valve is unique to the Bl aircraft. The regulating valve provides pressure regulation of the air supply to the wing fairing inflatable seals. Heat is transferred from a hot ethylene glycol water (EGW) circuit to cold ram air to maintain the desired EGW outlet temperature. The load heat exchanger is a four pass liquid to air through the cold air inlet and flows through the multilayer core, exiting through the cold air outlet.

EGW liquid enters the multilayer core, perpendicular to the cold circuit in a circuit along the cold inlet core face. The EGW fluid then enters an external header and flows to the cold outlet end of the load heat exchanger. The EGW fluid makes four passes through the core before exiting through the EGW outlet. Please see attached for more information.

## Open now in the same industry

546 open in NAICS 336413.

- OVERHAUL B-1 ELECTRO-MECHANICAL ACTUATORS (FA811827RB001), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/fa811827rb001
- Cylinder Assembly, A (SPRTA127R0016), due November 29, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/sprta127r0016
- Repair of E-3 Temperature Indicator (FA811727RB002), due November 29, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/fa811727rb002

## Publications

- June 13, 2024: Solicitation, due July 15, 2024 at 4:00 PM EDT. Notice bedd2ba609684702bd0273034f343bbd. https://sam.gov/workspace/contract/opp/bedd2ba609684702bd0273034f343bbd/view
- July 9, 2024: Solicitation, due August 15, 2024 at 4:00 PM EDT. Notice c2efc69c531142c6af21f6601af1e53b. https://sam.gov/workspace/contract/opp/c2efc69c531142c6af21f6601af1e53b/view

## Points of contact

- Jessica Vinyard, jessica.vinyard.1@us.af.mil
- Jacqueline West, jacqueline.west@us.af.mil, 4057362431

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/fa811824r0048.
