Solicitation
Demolish Surplus Military Family Housing Units
FA557525B0017
Department of the Air Force, FA5575 496 Abs PK. Site Preparation Contractors.
Response deadline
September 2, 2025 at 4:00 AM EDT
Closed 449 days ago. Posted August 25, 2025, first published July 31, 2025. Scheduled to archive September 17, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
8 like it are open now in site preparation contractors
- Trenching, Conduit and Ground-well Installation
Department of State, U.S. Embassy Kingston
SolicitationNAICS 238910Outside the US19JM3727Q0002Due todayNov 25 - Facility 1345 Demo
Department of the Air Force, FA4800 633 Cons PKP
Sources soughtSmall businessNAICS 238910VirginiaFA480027S0010Due todayNov 25 - Camptonville Housing Decommissioning
Forest Service, USDA Forest Serivce
Combined synopsis and solicitationSmall businessNAICS 238910Nevada City, CA127EAX26Q0076Closes in 10 daysDec 5
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238910 (site preparation contractors), means no more than $19 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 33 days from the day the solicitation was posted, July 31, 2025, to the deadline. The deadline moved once: it was first September 1, 2025 and ended as September 2, 2025.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
AMENDMENT 1: The purpose of this amendment is to change the bid opening date to 2 September 2025 @1000 hours.
Project QUUG 24-1003, Demolish Surplus MFH Units, Multi
The magnitude of this project is between $250,000 and $500,000. The projected period of performance is 190 days, which includes the 10 days the awardee has to provide the required bank guarantee following receipt of contract award. This is furnished for the convenience of prospective contractors. The actual extent of work requirements will be governed by the specifications and drawings. See section L for complete information regarding referenced project. Offers will be
evaluated according to the criteria in Section M, Evaluation criteria for award.
A pre-proposal Conference / Site Visit will be held 6 August 2025, 10:00 hours local time, in the Contracting Conference room, bldg 106. Please RSVP via email at least 24 hours prior to the site visit. Unless you have access to Moron Air Base, you will need an escort. If you require an escort, please request access via email at least 72 hours prior to the site visit. Questions in regards to this solicitation must be submitted via email no later than 12 August 2025. Bids must be received no later than 10:00 hours local time on 2 September 2025. Bids submitted by facsimile will NOT be accepted. Please ensure bids adhere to all requirements found in Section L of this solicitation. Nonconforming bids will not be accepted or evaluated.
Please submit a request by email for the following attachment: 3. Record Drawings
The Contracting POCs are:
Ms. Elia Portz: elia.portz_cueli.1.es@us.af.mil
TSgt Augustus Shinn: augustus.shinn@us.af.mil
SSgt Ryan Hopkin: ryan.hopkin@us.af.mil
SrA Ryan Kulpa: ryan.kulpa@us.af.mil
In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United
States of America, any contract resulting from this notice/solicitation can only be entered into with companies
authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements
established by Spanish legislation for execution of Government works. In addition, in accordance with the
Agreement of Defense Cooperation between the U.S.A. and the Kingdom of Spain, Annex 6, Article 1 (3) "The
contractors must meet the requirements established by Spanish legislation for execution of government works. A
breach of contract on the part of a contractor shall have the same consequences for the contractor for purposes of
future contracting with the Spanish government as would occur with a breach of a contract with the Spanish public
administration." and (5) " Spanish material, labor, and equipment shall be used whenever feasible and consistent
with the requirements".
NOTE: THIS SOLICITATION IS INTENDED ONLY FOR LOCAL SOURCES IN ACCORDANCE WITH FEDERAL
ACQUISITION REGULATION 5.202(a)(12). LOCAL SOURCES ARE THOSE SOURCES NORMALLY RESIDENT,
LICENSED AND REGISTERED TO CONDUCT CONSTRUCTION BUSINESS IN SPAIN. OFFERS FROM NONLOCAL
SOURCES WILL NOT BE CONSIDERED UNDER THIS SOLICITATION.
Notice to Offerors: Funds are not presently available within USAFE to fund this project, so bid acceptance period
should be valid through 31 Dec 2025. The Government reserves the right to cancel this solicitation, at any time with
no obligation to the offeror by the government.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 9. Statement of Work (Spa).pdf5.4 MB, July 31, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 31, 2025
Solicitation
Due September 1, 2025 at 4:00 AM EDT. SAM.gov, notice db27a4069deb40b7aef7d69764da911f
2 revisions on SAM
- August 25, 2025: publish, solicitation
- July 31, 2025: publish, solicitation
August 25, 2025
Solicitation
Due September 2, 2025 at 4:00 AM EDT. SAM.gov, notice e7f1206fba524cf79d97f3b0e31c29f3
2 revisions on SAM
- August 25, 2025: publish, solicitation
- July 31, 2025: publish, solicitation
Points of contact
- Elia Portzelia.portz_cueli.1.es@us.af.mil34955848017
- Augustus Shinnaugustus.shinn@us.af.mil34955848481