Combined synopsis and solicitation, total small business set-aside
30 CES - Pad Mount Transformers (1 of 2)
FA461025Q0041
Department of the Air Force, FA4610 30 Cons PK. Power, Distribution, and Specialty Transformer Manufacturing.
Response deadline
May 30, 2025 at 4:00 PM EDT
Closed 544 days ago. Posted May 14, 2025. Scheduled to archive June 14, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
63 like it are open now in power, distribution, and specialty transformer manufacturing
- DISTRIBUTING SYSTEM
Defense Logistics Agency, DLA Aviation at Philadelphia, PA
SolicitationNAICS 335311Ship to the buyerSPRPA127QVA05Due todayNov 25 - CABLE ASSEMBLY,SPEC
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationNAICS 335311Ship to the buyerSPE4A627T113SDue tomorrowNov 25 - POWER SUPPLY
Defense Logistics Agency, DLA Aviation at Philadelphia, PA
SolicitationNAICS 335311Ship to the buyerSPRPA127QYA43Due in 2 daysNov 27
All 63 open in power, distribution, and specialty transformer manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 335311 (power, distribution, and specialty transformer manufacturing), means no more than 800 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 16 days from the day the solicitation was posted, May 14, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
Five (5) phase pad-mounted transformers shall have the following voltage ratings:
•112.5 KVA, 208Y/120, 12 kV
•150 KVA, 480Y/277, 12 kV
•300 KVA, 480Y/277, 12 kV
•500 KVA, 480Y/277, 12.47 kV
•750 KVA, 480Y/277, 12 kV
In addition, the five phase pad-mounted transformers shall meet VSFB electrical requirements below:
•All stainless-steel construction (includes tank, cabinet, base, radiators, fasteners, hinges, etc.),stainless-steel grade shall be 304L or 316L (if available).
•"Pentahead" cabinet locking mechanism/device.
•Dead-Front construction (HV-200A load break elbows with shield adapters).
•Externally clamped LV bushings with threaded copper stud for full load current below 2,100.amperes - NEMA spades shall be provided per ANSI hole requirements.
•Radial feed or Loop feed
•Frequency: 60Hz.
•Windings: HV/LV copper
•Mineral Oil-filled (Non-PCB): Type FR-3 Fluid.
•Standard impedance.
•Mild steel high-voltage/low-voltage compartment barriers.
•Cooling fins.
•Proper grounding provisions.
•Dial type gauges for oil temperature, liquid level and pressure/vacuum.
•Bay-O-Net fuses & current-limiting fuses: properly sized - additionally, the transformer shouldbe equipped with three spare fuses.
•Two-position "ON/OFF" load break primary switch
•5-position tap changer: (-5%, -2 ½ %, 0, +2 ½ %, +5%)
•Automatic pressure relief device mounted on the terminal compartment.
•Oil drain valve with sampling device, and an oil-fill/oil-level plug.
•Nameplate and NEMA safety labels: include a "UL Listed" symbol on ratings label andnameplate.
•Compliant with 2016 DOE Efficiency Standard.
•Four (4) lifting lugs.
•Entire exterior of the pad-mount transformer and terminal components shall be painted with aMunsell-Green, outdoor color-finish.
•Guaranteed to have an average coil winding temperature of 65°C rise over an average ambient airtemperature of 30°C when operated at rated voltage and load conditions.
•Provide DGA test to verify conformance to performance requirements as outlined in the latestrevisions of ANSI C57.12.00 and ANSI C57.12.90.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Atch 3_Clauses Provisions.pdf24.5 MB, May 14, 2025
- Atch 2_PricingSheet.xlsx28 KB, May 14, 2025
- Atch 1_Transformers SOW.pdf191 KB, May 14, 2025
- Transformers_RFQ.pdf148 KB, May 14, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 14, 2025
Combined synopsis and solicitation
Due May 30, 2025 at 4:00 PM EDT. SAM.gov, notice 4165a3fd1e15480aaa9a985e47206ccd
1 revision on SAM
- May 14, 2025: publish, combined synopsis and solicitation