Combined synopsis and solicitation
SR Power Supplies Rack Detailed Design for ALS-U
AA-2027-01
Department of Energy, Berkeley Natl Lab - DOE Contractor. Engineering Services.
Response deadline
October 20, 2026 at 2:59 AM EDT
Closed 36 days ago. Posted October 12, 2026, first published September 20, 2026. Scheduled to archive November 3, 2026.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed 36 days ago
100 like it are open now in engineering services
- Universal Robotics e-Series Arm
National Aeronautics and Space Administration, NASA Shared Services Center
Combined synopsis and solicitationSmall businessNAICS 541330Ship to CA80NSSC27949205QDue todayNov 25 - Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA
Federal Aviation Administration, 697DCK Regional Acquisitions SVCS
SolicitationSmall businessNAICS 541330California697DCK-27-R-00022ADue in 7 daysDec 2 - PUBLIC WORKS ENERGY A-E SERVICES CONTRACTS
Department of the Navy, NAVFAC Systems and Exp Warfare CTR
Sources soughtNAICS 541330Port Hueneme, CAN39430AEIDIQCloses in 8 daysDec 3
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 541330 (engineering services), means no more than $25.5 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 29 days from the day the solicitation was posted, September 20, 2026, to the deadline. The deadline moved once: it was first October 2, 2026 and ended as October 19, 2026.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This RFP has been revised 10/12/26 to include a Questions & Clarifications (QA) document No. 5.
All other terms and conditions of this RFP remain the same.
______________________________________________________________________
This RFP has been revised 10/8/26 to include (3) updated documents - SOW Rev. B, Sample Subcontract & ACL.
A video recording of our 10/8/26 pre-proposal conference is also attached hereto.
All other terms and conditions of this RFP remain the same.
______________________________________________________________________
LBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information.
Attendance is optional and will not be evaluated negatively against any submitted proposal.
The conference is intended to be recorded and publicized after it concludes.
Zoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1
All other terms and conditions of this RFP remain the same.
______________________________________________________________________
This RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.
All other terms and conditions of this RFP remain the same.
______________________________________________________________________
This RFP has been revised 9/25/26 to include a Questions & Clarifications (QA) document No. 4.
All other terms and conditions of this RFP remain the same.
______________________________________________________________________
This RFP has been revised 9/23/26 to include a Questions & Clarifications (QA) document No. 3.
All other terms and conditions of this RFP remain the same.
______________________________________________________________________
This RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2.
All other terms and conditions of this RFP remain the same.
______________________________________________________________________
This RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.
All other terms and conditions of this RFP remain the same.
______________________________________________________________________
Dear Prospective Offeror,
The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U Storage Ring Power Supplies Rack Designs.
The RFP and associated documents (listed below) are attached hereto:
0. RFP and Proposal Preparation Instructions
1. Statement of Work; inclusive of all referenced documents.
Please view the following Google Drive for complete Technical documentation:
https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj
2. Sample Subcontract
3. ALS-U Quality Evaluation Survey (required with submission)
4. Rep Cert Form (required with submission)
Timeline of Events:
Questions for Clarification - no later than September 24, 2026
Pre-Proposal Conference - Week of September 28, 2026, if necessary
Submissions due - no later than October 2, 2026.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 4. Standard Form Rep Cert, RFP AA-2027-01.docx66 KB, September 20, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 20, 2026
Combined synopsis and solicitation
Due October 2, 2026 at 8:00 PM EDT. SAM.gov, notice 0a12322895ef4c39af903ac8bc55404c
3 revisions on SAM
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
September 20, 2026
Combined synopsis and solicitation
Due October 2, 2026 at 8:00 PM EDT. SAM.gov, notice 50f33599ceea4a469164f74bf889d36f
3 revisions on SAM
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
September 20, 2026
Combined synopsis and solicitation
Due October 2, 2026 at 8:00 PM EDT. SAM.gov, notice a646318ed8184d6f87f5e12a8c18a92a
3 revisions on SAM
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
September 22, 2026
Combined synopsis and solicitation
Due October 3, 2026 at 2:59 AM EDT. SAM.gov, notice 36fa3dd664ef4553b63146eb4711c602
4 revisions on SAM
- September 22, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
September 23, 2026
Combined synopsis and solicitation
Due October 3, 2026 at 2:59 AM EDT. SAM.gov, notice 3921f5cab42e4e0a9dc24d0d08c51d22
5 revisions on SAM
- September 23, 2026: publish, combined synopsis and solicitation
- September 22, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
September 25, 2026
Combined synopsis and solicitation
Due October 3, 2026 at 2:59 AM EDT. SAM.gov, notice 1a1f753815bd4340a6cbd385c8406b9d
6 revisions on SAM
- September 25, 2026: publish, combined synopsis and solicitation
- September 23, 2026: publish, combined synopsis and solicitation
- September 22, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
October 1, 2026
Combined synopsis and solicitation
Due October 20, 2026 at 2:59 AM EDT. SAM.gov, notice d6b582b4c9824c12a74a68af54cb40a8
7 revisions on SAM
- October 1, 2026: publish, combined synopsis and solicitation
- September 25, 2026: publish, combined synopsis and solicitation
- September 23, 2026: publish, combined synopsis and solicitation
- September 22, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
October 6, 2026
Combined synopsis and solicitation
Due October 20, 2026 at 2:59 AM EDT. SAM.gov, notice 60317a62bb4a42f680730d70f3b43574
8 revisions on SAM
- October 6, 2026: publish, combined synopsis and solicitation
- October 1, 2026: publish, combined synopsis and solicitation
- September 25, 2026: publish, combined synopsis and solicitation
- September 23, 2026: publish, combined synopsis and solicitation
- September 22, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
October 8, 2026
Combined synopsis and solicitation
Due October 20, 2026 at 2:59 AM EDT. SAM.gov, notice b3eba28eed6e436384918d688651276b
9 revisions on SAM
- October 8, 2026: publish, combined synopsis and solicitation
- October 6, 2026: publish, combined synopsis and solicitation
- October 1, 2026: publish, combined synopsis and solicitation
- September 25, 2026: publish, combined synopsis and solicitation
- September 23, 2026: publish, combined synopsis and solicitation
- September 22, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
October 12, 2026
Combined synopsis and solicitation
Due October 20, 2026 at 2:59 AM EDT. SAM.gov, notice 90ad22b027af43988c27ea3e9513dbfc
10 revisions on SAM
- October 12, 2026: publish, combined synopsis and solicitation
- October 8, 2026: publish, combined synopsis and solicitation
- October 6, 2026: publish, combined synopsis and solicitation
- October 1, 2026: publish, combined synopsis and solicitation
- September 25, 2026: publish, combined synopsis and solicitation
- September 23, 2026: publish, combined synopsis and solicitation
- September 22, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
- September 20, 2026: publish, combined synopsis and solicitation
Points of contact
- Arielle Anoopaanoop@lbl.gov