{"canonical":"https://sealedbidder.com/opportunities/aa202701","key":"AA202701","url":"https://sealedbidder.com/opportunities/aa202701","title":"SR Power Supplies Rack Detailed Design for ALS-U","solicitation_number":"AA-2027-01","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-10-20T06:59:00Z","first_posted":"2026-09-20","last_posted":"2026-10-12","department":"ENERGY, DEPARTMENT OF","subagency":"ENERGY, DEPARTMENT OF","office":"BERKELEY NATL LAB - DOE CONTRACTOR","naics":"541330","psc":"C222","set_aside":null,"place_state":"CA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"06001","place_county_name":"Alameda County","place_city":"0606000","place_city_name":"Berkeley","winner":null,"award_amount":null,"publications":[{"notice_id":"0a12322895ef4c39af903ac8bc55404c","title":"SR Power Supplies Rack Detailed Design for ALS-U","solicitation_number":"AA-2027-01","notice_type":"k","base_type":"k","posted":"2026-09-20","posted_at":"2026-09-20T19:27:47.124Z","due_at":"2026-10-03T00:00:00Z","due_date":"2026-10-02","cancelled":false,"archived":true,"archive_date":"2026-10-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0a12322895ef4c39af903ac8bc55404c/view","enriched":true,"history":[{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}]},{"notice_id":"50f33599ceea4a469164f74bf889d36f","title":"SR Power Supplies Rack Detailed Design for ALS-U","solicitation_number":"AA-2027-01","notice_type":"k","base_type":"k","posted":"2026-09-20","posted_at":"2026-09-20T12:27:07.292Z","due_at":"2026-10-03T00:00:00Z","due_date":"2026-10-02","cancelled":false,"archived":true,"archive_date":"2026-10-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/50f33599ceea4a469164f74bf889d36f/view","enriched":true,"history":[{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}]},{"notice_id":"a646318ed8184d6f87f5e12a8c18a92a","title":"SR Power Supplies Rack Detailed Design for ALS-U","solicitation_number":"AA-2027-01","notice_type":"k","base_type":"k","posted":"2026-09-20","posted_at":"2026-09-20T19:21:02.254Z","due_at":"2026-10-03T00:00:00Z","due_date":"2026-10-02","cancelled":false,"archived":true,"archive_date":"2026-10-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a646318ed8184d6f87f5e12a8c18a92a/view","enriched":true,"history":[{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}]},{"notice_id":"36fa3dd664ef4553b63146eb4711c602","title":"SR Power Supplies Rack Detailed Design for ALS-U","solicitation_number":"AA-2027-01","notice_type":"k","base_type":"k","posted":"2026-09-22","posted_at":"2026-09-22T16:24:26.616Z","due_at":"2026-10-03T06:59:00Z","due_date":"2026-10-02","cancelled":false,"archived":true,"archive_date":"2026-10-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/36fa3dd664ef4553b63146eb4711c602/view","enriched":true,"history":[{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}]},{"notice_id":"3921f5cab42e4e0a9dc24d0d08c51d22","title":"SR Power Supplies Rack Detailed Design for ALS-U","solicitation_number":"AA-2027-01","notice_type":"k","base_type":"k","posted":"2026-09-23","posted_at":"2026-09-23T23:42:03.655Z","due_at":"2026-10-03T06:59:00Z","due_date":"2026-10-02","cancelled":false,"archived":true,"archive_date":"2026-10-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3921f5cab42e4e0a9dc24d0d08c51d22/view","enriched":true,"history":[{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}]},{"notice_id":"1a1f753815bd4340a6cbd385c8406b9d","title":"SR Power Supplies Rack Detailed Design for ALS-U","solicitation_number":"AA-2027-01","notice_type":"k","base_type":"k","posted":"2026-09-25","posted_at":"2026-09-25T14:27:58.643Z","due_at":"2026-10-03T06:59:00Z","due_date":"2026-10-02","cancelled":false,"archived":true,"archive_date":"2026-10-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1a1f753815bd4340a6cbd385c8406b9d/view","enriched":true,"history":[{"index":6,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T14:27:58.643Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"1a1f753815bd4340a6cbd385c8406b9d","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}]},{"notice_id":"d6b582b4c9824c12a74a68af54cb40a8","title":"SR Power Supplies Rack Detailed Design for ALS-U","solicitation_number":"AA-2027-01","notice_type":"k","base_type":"k","posted":"2026-10-01","posted_at":"2026-10-01T13:44:12.679Z","due_at":"2026-10-20T06:59:00Z","due_date":"2026-10-19","cancelled":false,"archived":true,"archive_date":"2026-11-03","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d6b582b4c9824c12a74a68af54cb40a8/view","enriched":true,"history":[{"index":7,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-01T13:44:12.679Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d6b582b4c9824c12a74a68af54cb40a8","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":6,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T14:27:58.643Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"1a1f753815bd4340a6cbd385c8406b9d","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}]},{"notice_id":"60317a62bb4a42f680730d70f3b43574","title":"SR Power Supplies Rack Detailed Design for ALS-U","solicitation_number":"AA-2027-01","notice_type":"k","base_type":"k","posted":"2026-10-06","posted_at":"2026-10-06T13:33:56.286Z","due_at":"2026-10-20T06:59:00Z","due_date":"2026-10-19","cancelled":false,"archived":true,"archive_date":"2026-11-03","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/60317a62bb4a42f680730d70f3b43574/view","enriched":true,"history":[{"index":8,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T13:33:56.286Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"60317a62bb4a42f680730d70f3b43574","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":7,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-01T13:44:12.679Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d6b582b4c9824c12a74a68af54cb40a8","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":6,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T14:27:58.643Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"1a1f753815bd4340a6cbd385c8406b9d","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}]},{"notice_id":"b3eba28eed6e436384918d688651276b","title":"SR Power Supplies Rack Detailed Design for ALS-U","solicitation_number":"AA-2027-01","notice_type":"k","base_type":"k","posted":"2026-10-08","posted_at":"2026-10-08T17:54:57.230Z","due_at":"2026-10-20T06:59:00Z","due_date":"2026-10-19","cancelled":false,"archived":true,"archive_date":"2026-11-03","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b3eba28eed6e436384918d688651276b/view","enriched":true,"history":[{"index":9,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-08T17:54:57.230Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"b3eba28eed6e436384918d688651276b","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":8,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T13:33:56.286Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"60317a62bb4a42f680730d70f3b43574","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":7,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-01T13:44:12.679Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d6b582b4c9824c12a74a68af54cb40a8","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":6,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T14:27:58.643Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"1a1f753815bd4340a6cbd385c8406b9d","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}]},{"notice_id":"90ad22b027af43988c27ea3e9513dbfc","title":"SR Power Supplies Rack Detailed Design for ALS-U","solicitation_number":"AA-2027-01","notice_type":"k","base_type":"k","posted":"2026-10-12","posted_at":"2026-10-12T18:34:35.043Z","due_at":"2026-10-20T06:59:00Z","due_date":"2026-10-19","cancelled":false,"archived":true,"archive_date":"2026-11-03","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/90ad22b027af43988c27ea3e9513dbfc/view","enriched":true,"history":[{"index":10,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-12T18:34:35.043Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"90ad22b027af43988c27ea3e9513dbfc","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":9,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-08T17:54:57.230Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"b3eba28eed6e436384918d688651276b","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":8,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T13:33:56.286Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"60317a62bb4a42f680730d70f3b43574","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":7,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-01T13:44:12.679Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d6b582b4c9824c12a74a68af54cb40a8","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":6,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T14:27:58.643Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"1a1f753815bd4340a6cbd385c8406b9d","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}]}],"latest_notice_id":"90ad22b027af43988c27ea3e9513dbfc","first_type":"k","notices":[{"dates":{"posted":"2026-09-20","posted_at":"2026-09-20T19:27:47.124Z","created_at":"2026-09-20T19:25:44.454Z","modified_at":"2026-09-20T19:27:47.131Z","response_deadline":{"raw":"2026-10-02T17:00:00-07:00","utc":"2026-10-03T00:00:00Z","date":"2026-10-02","time":"17:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/0a12322895ef4c39af903ac8bc55404c/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"SR Power Supplies Rack Detailed Design for ALS-U","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"publication":"published","archive_date":"2026-10-17","archive_type":"auto15"},"history":[{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}],"contacts":[{"name":"Arielle Anoop","role":"primary","email":"aanoop@lbl.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"0a12322895ef4c39af903ac8bc55404c","lineage_id":"50f33599ceea4a469164f74bf889d36f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-21T04:24:45.868253512Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"be5b55b19b729af7bdd453e30d78434d-26\"","fetched_at":"2026-10-06T03:48:34.605332942Z","row_sha256":"1ffaa452918710304ef3335b7722e014a851ea97748b9be2bf65980c2025ebaa","last_modified":"2026-10-06T03:30:43Z"},"updated_at":"2026-10-06T03:48:34.605332942Z","first_seen_at":"2026-09-21T04:08:22.069689491Z"},"description":{"html":"<p>This RFP has been revised 9/20/26 to include a Questions &amp; Clarifications (QA) document.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Dear Prospective Offeror,</p>\n\n<p></p>\n\n<p>The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in&nbsp;<strong>Request for Proposal&nbsp;(RFP)</strong>&nbsp;No.&nbsp;AA-2027-01 for&nbsp;ALS-U&nbsp;​Storage Ring Power Supplies Rack Designs.</p>\n\n<p><br />\n<em><u>The RFP&nbsp;and associated documents (listed below) are attached hereto:</u></em></p>\n\n<p>0.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;RFP&nbsp;and Proposal Preparation Instructions</p>\n\n<p>1.&nbsp; &nbsp; &nbsp; &nbsp;​&nbsp; &nbsp; ​&nbsp;Statement of Work; inclusive of all ​r​eferenced documents.</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Please view the following&nbsp;Google Drive&nbsp;for complete Technical documentation:</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;Sample Subcontract</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;​ALS-U Quality Evaluation Survey (<em><u>required with submission)</u></em>&nbsp;</p>\n\n<p>​4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; ​​​Rep Cert Form&nbsp;<em><u>(required with submission)</u></em></p>\n\n<p></p>\n\n<p><em><u>Timeline of Events:</u></em></p>\n\n<p>Questions for Clarification - no later than&nbsp;​S​eptember 24, 2026</p>\n\n<p>Pre-Proposal Conference - Week of September 28, 2026, if necessary</p>\n\n<p><strong>Submissions due&nbsp;- no later than&nbsp;​October 2, 2026.</strong></p>","text":"This RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.\n\n______________________________________________________________________\n\nDear Prospective Offeror,\n\nThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs.\n\nThe RFP and associated documents (listed below) are attached hereto:\n\n0. RFP and Proposal Preparation Instructions\n\n1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents.\n\nPlease view the following Google Drive for complete Technical documentation:\n\nhttps://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj\n\n2. Sample Subcontract\n\n3. ​ALS-U Quality Evaluation Survey (required with submission)\n\n​4. ​​​Rep Cert Form (required with submission)\n\nTimeline of Events:\n\nQuestions for Clarification - no later than ​S​eptember 24, 2026\n\nPre-Proposal Conference - Week of September 28, 2026, if necessary\n\nSubmissions due - no later than ​October 2, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"AA-2027-01","place_of_performance":{"city":{"name":"Berkeley"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"C222"},{"dates":{"posted":"2026-09-20","posted_at":"2026-09-20T12:27:07.292Z","created_at":"2026-09-20T12:19:58.323Z","modified_at":"2026-09-20T19:21:02.254Z","response_deadline":{"raw":"2026-10-02T17:00:00-07:00","utc":"2026-10-03T00:00:00Z","date":"2026-10-02","time":"17:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/50f33599ceea4a469164f74bf889d36f/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"SR Power Supplies Rack Detailed Design for ALS-U","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":false,"publication":"published","archive_date":"2026-10-17","archive_type":"auto15"},"history":[{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}],"contacts":[{"name":"Arielle Anoop","role":"primary","email":"aanoop@lbl.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"50f33599ceea4a469164f74bf889d36f","lineage_id":"50f33599ceea4a469164f74bf889d36f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-21T04:25:13.369891396Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"be5b55b19b729af7bdd453e30d78434d-26\"","fetched_at":"2026-10-06T03:48:34.605332942Z","row_sha256":"d2e55bb5db4bbf951247b648a233108185fd5b1199f3d50309068172f18ea697","last_modified":"2026-10-06T03:30:43Z"},"updated_at":"2026-10-06T03:48:34.605332942Z","first_seen_at":"2026-09-21T04:08:22.069689491Z"},"description":{"html":"<p>Dear Prospective Offeror,</p>\n\n<p></p>\n\n<p>The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in&nbsp;<strong>Request for Proposal&nbsp;(RFP)</strong>&nbsp;No.&nbsp;AA-2027-01 for&nbsp;ALS-U&nbsp;​Storage Ring Power Supplies Rack Designs.</p>\n\n<p><br />\n<em><u>The RFP&nbsp;and associated documents (listed below) are attached hereto:</u></em></p>\n\n<p>0.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;RFP&nbsp;and Proposal Preparation Instructions</p>\n\n<p>1.&nbsp; &nbsp; &nbsp; &nbsp;​&nbsp; &nbsp; ​&nbsp;Statement of Work; inclusive of all ​r​eferenced documents.</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Please view the following&nbsp;Google Drive&nbsp;for complete Technical documentation:</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;Sample Subcontract</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;​ALS-U Quality Evaluation Survey (<em><u>required with submission)</u></em>&nbsp;</p>\n\n<p>​4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; ​​​Rep Cert Form&nbsp;<em><u>(required with submission)</u></em></p>\n\n<p></p>\n\n<p><em><u>Timeline of Events:</u></em></p>\n\n<p>Questions for Clarification - no later than&nbsp;​S​eptember 24, 2026</p>\n\n<p>Pre-Proposal Conference - Week of September 28, 2026, if necessary</p>\n\n<p><strong>Submissions due&nbsp;- no later than&nbsp;​October 2, 2026.</strong></p>","text":"Dear Prospective Offeror,\n\nThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs.\n\nThe RFP and associated documents (listed below) are attached hereto:\n\n0. RFP and Proposal Preparation Instructions\n\n1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents.\n\nPlease view the following Google Drive for complete Technical documentation:\n\nhttps://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj\n\n2. Sample Subcontract\n\n3. ​ALS-U Quality Evaluation Survey (required with submission)\n\n​4. ​​​Rep Cert Form (required with submission)\n\nTimeline of Events:\n\nQuestions for Clarification - no later than ​S​eptember 24, 2026\n\nPre-Proposal Conference - Week of September 28, 2026, if necessary\n\nSubmissions due - no later than ​October 2, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"AA-2027-01","place_of_performance":{"city":{"name":"Berkeley"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"C222"},{"dates":{"posted":"2026-09-20","posted_at":"2026-09-20T19:21:02.254Z","created_at":"2026-09-20T19:18:44.445Z","modified_at":"2026-09-20T19:27:47.124Z","response_deadline":{"raw":"2026-10-02T17:00:00-07:00","utc":"2026-10-03T00:00:00Z","date":"2026-10-02","time":"17:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a646318ed8184d6f87f5e12a8c18a92a/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"SR Power Supplies Rack Detailed Design for ALS-U","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":false,"publication":"published","archive_date":"2026-10-17","archive_type":"auto15"},"history":[{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}],"contacts":[{"name":"Arielle Anoop","role":"primary","email":"aanoop@lbl.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"a646318ed8184d6f87f5e12a8c18a92a","lineage_id":"50f33599ceea4a469164f74bf889d36f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-21T04:26:12.370891942Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"be5b55b19b729af7bdd453e30d78434d-26\"","fetched_at":"2026-10-06T03:48:34.605332942Z","row_sha256":"cc85c6a293b6802a511f7ae39fabbb19e14e36b1e36bc5c0edb87aef8c16ad59","last_modified":"2026-10-06T03:30:43Z"},"updated_at":"2026-10-06T03:48:34.605332942Z","first_seen_at":"2026-09-21T04:08:22.069689491Z"},"description":{"html":"<p>This RFP has been revised 9/20/26 to include a Questions &amp; Clarifications (QA) document.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Dear Prospective Offeror,</p>\n\n<p></p>\n\n<p>The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in&nbsp;<strong>Request for Proposal&nbsp;(RFP)</strong>&nbsp;No.&nbsp;AA-2027-01 for&nbsp;ALS-U&nbsp;​Storage Ring Power Supplies Rack Designs.</p>\n\n<p><br />\n<em><u>The RFP&nbsp;and associated documents (listed below) are attached hereto:</u></em></p>\n\n<p>0.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;RFP&nbsp;and Proposal Preparation Instructions</p>\n\n<p>1.&nbsp; &nbsp; &nbsp; &nbsp;​&nbsp; &nbsp; ​&nbsp;Statement of Work; inclusive of all ​r​eferenced documents.</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Please view the following&nbsp;Google Drive&nbsp;for complete Technical documentation:</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;Sample Subcontract</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;​ALS-U Quality Evaluation Survey (<em><u>required with submission)</u></em>&nbsp;</p>\n\n<p>​4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; ​​​Rep Cert Form&nbsp;<em><u>(required with submission)</u></em></p>\n\n<p></p>\n\n<p><em><u>Timeline of Events:</u></em></p>\n\n<p>Questions for Clarification - no later than&nbsp;​S​eptember 24, 2026</p>\n\n<p>Pre-Proposal Conference - Week of September 28, 2026, if necessary</p>\n\n<p><strong>Submissions due&nbsp;- no later than&nbsp;​October 2, 2026.</strong></p>","text":"This RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.\n\n______________________________________________________________________\n\nDear Prospective Offeror,\n\nThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs.\n\nThe RFP and associated documents (listed below) are attached hereto:\n\n0. RFP and Proposal Preparation Instructions\n\n1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents.\n\nPlease view the following Google Drive for complete Technical documentation:\n\nhttps://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj\n\n2. Sample Subcontract\n\n3. ​ALS-U Quality Evaluation Survey (required with submission)\n\n​4. ​​​Rep Cert Form (required with submission)\n\nTimeline of Events:\n\nQuestions for Clarification - no later than ​S​eptember 24, 2026\n\nPre-Proposal Conference - Week of September 28, 2026, if necessary\n\nSubmissions due - no later than ​October 2, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"AA-2027-01","place_of_performance":{"city":{"name":"Berkeley"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"C222"},{"dates":{"posted":"2026-09-22","posted_at":"2026-09-22T16:24:26.616Z","created_at":"2026-09-22T16:14:54.153Z","modified_at":"2026-09-22T16:24:26.619Z","response_deadline":{"raw":"2026-10-02T23:59:00-07:00","utc":"2026-10-03T06:59:00Z","date":"2026-10-02","time":"23:59:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/36fa3dd664ef4553b63146eb4711c602/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"SR Power Supplies Rack Detailed Design for ALS-U","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-10-17","archive_type":"auto15"},"history":[{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}],"contacts":[{"name":"Arielle Anoop","role":"primary","email":"aanoop@lbl.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"36fa3dd664ef4553b63146eb4711c602","lineage_id":"50f33599ceea4a469164f74bf889d36f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-23T04:14:41.543346281Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"be5b55b19b729af7bdd453e30d78434d-26\"","fetched_at":"2026-10-06T03:48:34.605332942Z","row_sha256":"aae8deb02211d2d65a11919854e46ab6f6c587632151b5b939e1aa02f2e38c5e","last_modified":"2026-10-06T03:30:43Z"},"updated_at":"2026-10-06T03:48:34.605332942Z","first_seen_at":"2026-09-23T03:49:19.112235372Z"},"description":{"html":"<p>This RFP has been revised 9/22/26 to include a Questions &amp; Clarifications (QA) document No. 2.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/20/26 to include a Questions &amp; Clarifications (QA) document.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Dear Prospective Offeror,</p>\n\n<p></p>\n\n<p>The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in&nbsp;<strong>Request for Proposal&nbsp;(RFP)</strong>&nbsp;No.&nbsp;AA-2027-01 for&nbsp;ALS-U&nbsp;​Storage Ring Power Supplies Rack Designs.</p>\n\n<p><br />\n<em><u>The RFP&nbsp;and associated documents (listed below) are attached hereto:</u></em></p>\n\n<p>0.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;RFP&nbsp;and Proposal Preparation Instructions</p>\n\n<p>1.&nbsp; &nbsp; &nbsp; &nbsp;​&nbsp; &nbsp; ​&nbsp;Statement of Work; inclusive of all ​r​eferenced documents.</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Please view the following&nbsp;Google Drive&nbsp;for complete Technical documentation:</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;Sample Subcontract</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;​ALS-U Quality Evaluation Survey (<em><u>required with submission)</u></em>&nbsp;</p>\n\n<p>​4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; ​​​Rep Cert Form&nbsp;<em><u>(required with submission)</u></em></p>\n\n<p></p>\n\n<p><em><u>Timeline of Events:</u></em></p>\n\n<p>Questions for Clarification - no later than&nbsp;​S​eptember 24, 2026</p>\n\n<p>Pre-Proposal Conference - Week of September 28, 2026, if necessary</p>\n\n<p><strong>Submissions due&nbsp;- no later than&nbsp;​October 2, 2026.</strong></p>","text":"This RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nDear Prospective Offeror,\n\nThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs.\n\nThe RFP and associated documents (listed below) are attached hereto:\n\n0. RFP and Proposal Preparation Instructions\n\n1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents.\n\nPlease view the following Google Drive for complete Technical documentation:\n\nhttps://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj\n\n2. Sample Subcontract\n\n3. ​ALS-U Quality Evaluation Survey (required with submission)\n\n​4. ​​​Rep Cert Form (required with submission)\n\nTimeline of Events:\n\nQuestions for Clarification - no later than ​S​eptember 24, 2026\n\nPre-Proposal Conference - Week of September 28, 2026, if necessary\n\nSubmissions due - no later than ​October 2, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"AA-2027-01","place_of_performance":{"city":{"name":"Berkeley"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"C222"},{"dates":{"posted":"2026-09-23","posted_at":"2026-09-23T23:42:03.655Z","created_at":"2026-09-23T23:40:38.550Z","modified_at":"2026-09-23T23:42:03.657Z","response_deadline":{"raw":"2026-10-02T23:59:00-07:00","utc":"2026-10-03T06:59:00Z","date":"2026-10-02","time":"23:59:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3921f5cab42e4e0a9dc24d0d08c51d22/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"SR Power Supplies Rack Detailed Design for ALS-U","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-10-17","archive_type":"auto15"},"history":[{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}],"contacts":[{"name":"Arielle Anoop","role":"primary","email":"aanoop@lbl.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"3921f5cab42e4e0a9dc24d0d08c51d22","lineage_id":"50f33599ceea4a469164f74bf889d36f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-24T04:47:50.693333941Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"be5b55b19b729af7bdd453e30d78434d-26\"","fetched_at":"2026-10-06T03:48:34.605332942Z","row_sha256":"7bba8ae24a49d99ef87e5ad5f7104429dcff31ac519744caadf2e3583c56e751","last_modified":"2026-10-06T03:30:43Z"},"updated_at":"2026-10-06T03:48:34.605332942Z","first_seen_at":"2026-09-24T04:21:46.782462570Z"},"description":{"html":"<p>This RFP has been revised 9/23/26 to include a Questions &amp; Clarifications (QA) document No. 3.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/22/26 to include a Questions &amp; Clarifications (QA) document No. 2.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/20/26 to include a Questions &amp; Clarifications (QA) document.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Dear Prospective Offeror,</p>\n\n<p></p>\n\n<p>The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in&nbsp;<strong>Request for Proposal&nbsp;(RFP)</strong>&nbsp;No.&nbsp;AA-2027-01 for&nbsp;ALS-U&nbsp;​Storage Ring Power Supplies Rack Designs.</p>\n\n<p><br />\n<em><u>The RFP&nbsp;and associated documents (listed below) are attached hereto:</u></em></p>\n\n<p>0.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;RFP&nbsp;and Proposal Preparation Instructions</p>\n\n<p>1.&nbsp; &nbsp; &nbsp; &nbsp;​&nbsp; &nbsp; ​&nbsp;Statement of Work; inclusive of all ​r​eferenced documents.</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Please view the following&nbsp;Google Drive&nbsp;for complete Technical documentation:</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;Sample Subcontract</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;​ALS-U Quality Evaluation Survey (<em><u>required with submission)</u></em>&nbsp;</p>\n\n<p>​4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; ​​​Rep Cert Form&nbsp;<em><u>(required with submission)</u></em></p>\n\n<p></p>\n\n<p><em><u>Timeline of Events:</u></em></p>\n\n<p>Questions for Clarification - no later than&nbsp;​S​eptember 24, 2026</p>\n\n<p>Pre-Proposal Conference - Week of September 28, 2026, if necessary</p>\n\n<p><strong>Submissions due&nbsp;- no later than&nbsp;​October 2, 2026.</strong></p>","text":"This RFP has been revised 9/23/26 to include a Questions & Clarifications (QA) document No. 3.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nDear Prospective Offeror,\n\nThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs.\n\nThe RFP and associated documents (listed below) are attached hereto:\n\n0. RFP and Proposal Preparation Instructions\n\n1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents.\n\nPlease view the following Google Drive for complete Technical documentation:\n\nhttps://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj\n\n2. Sample Subcontract\n\n3. ​ALS-U Quality Evaluation Survey (required with submission)\n\n​4. ​​​Rep Cert Form (required with submission)\n\nTimeline of Events:\n\nQuestions for Clarification - no later than ​S​eptember 24, 2026\n\nPre-Proposal Conference - Week of September 28, 2026, if necessary\n\nSubmissions due - no later than ​October 2, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"AA-2027-01","place_of_performance":{"city":{"name":"Berkeley"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"C222"},{"dates":{"posted":"2026-09-25","posted_at":"2026-09-25T14:27:58.643Z","created_at":"2026-09-25T14:26:24.113Z","modified_at":"2026-09-25T14:27:58.647Z","response_deadline":{"raw":"2026-10-02T23:59:00-07:00","utc":"2026-10-03T06:59:00Z","date":"2026-10-02","time":"23:59:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1a1f753815bd4340a6cbd385c8406b9d/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"SR Power Supplies Rack Detailed Design for ALS-U","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-10-17","archive_type":"auto15"},"history":[{"index":6,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T14:27:58.643Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"1a1f753815bd4340a6cbd385c8406b9d","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}],"contacts":[{"name":"Arielle Anoop","role":"primary","email":"aanoop@lbl.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"1a1f753815bd4340a6cbd385c8406b9d","lineage_id":"50f33599ceea4a469164f74bf889d36f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-26T04:05:36.317663533Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"be5b55b19b729af7bdd453e30d78434d-26\"","fetched_at":"2026-10-06T03:48:34.605332942Z","row_sha256":"6e391d1aa8e4ec84b7216ae4c6b186dfbde68dbffd974cd9335787de7c843c45","last_modified":"2026-10-06T03:30:43Z"},"updated_at":"2026-10-06T03:48:34.605332942Z","first_seen_at":"2026-09-26T03:45:49.441710488Z"},"description":{"html":"<p>This RFP has been revised 9/25/26 to include a Questions &amp; Clarifications (QA) document No. 4.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/23/26 to include a Questions &amp; Clarifications (QA) document No. 3.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/22/26 to include a Questions &amp; Clarifications (QA) document No. 2.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/20/26 to include a Questions &amp; Clarifications (QA) document.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Dear Prospective Offeror,</p>\n\n<p></p>\n\n<p>The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in&nbsp;<strong>Request for Proposal&nbsp;(RFP)</strong>&nbsp;No.&nbsp;AA-2027-01 for&nbsp;ALS-U&nbsp;​Storage Ring Power Supplies Rack Designs.</p>\n\n<p><br />\n<em><u>The RFP&nbsp;and associated documents (listed below) are attached hereto:</u></em></p>\n\n<p>0.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;RFP&nbsp;and Proposal Preparation Instructions</p>\n\n<p>1.&nbsp; &nbsp; &nbsp; &nbsp;​&nbsp; &nbsp; ​&nbsp;Statement of Work; inclusive of all ​r​eferenced documents.</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Please view the following&nbsp;Google Drive&nbsp;for complete Technical documentation:</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;Sample Subcontract</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;​ALS-U Quality Evaluation Survey (<em><u>required with submission)</u></em>&nbsp;</p>\n\n<p>​4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; ​​​Rep Cert Form&nbsp;<em><u>(required with submission)</u></em></p>\n\n<p></p>\n\n<p><em><u>Timeline of Events:</u></em></p>\n\n<p>Questions for Clarification - no later than&nbsp;​S​eptember 24, 2026</p>\n\n<p>Pre-Proposal Conference - Week of September 28, 2026, if necessary</p>\n\n<p><strong>Submissions due&nbsp;- no later than&nbsp;​October 2, 2026.</strong></p>","text":"This RFP has been revised 9/25/26 to include a Questions & Clarifications (QA) document No. 4.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/23/26 to include a Questions & Clarifications (QA) document No. 3.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nDear Prospective Offeror,\n\nThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs.\n\nThe RFP and associated documents (listed below) are attached hereto:\n\n0. RFP and Proposal Preparation Instructions\n\n1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents.\n\nPlease view the following Google Drive for complete Technical documentation:\n\nhttps://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj\n\n2. Sample Subcontract\n\n3. ​ALS-U Quality Evaluation Survey (required with submission)\n\n​4. ​​​Rep Cert Form (required with submission)\n\nTimeline of Events:\n\nQuestions for Clarification - no later than ​S​eptember 24, 2026\n\nPre-Proposal Conference - Week of September 28, 2026, if necessary\n\nSubmissions due - no later than ​October 2, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"AA-2027-01","place_of_performance":{"city":{"name":"Berkeley"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"C222"},{"dates":{"posted":"2026-10-01","posted_at":"2026-10-01T13:44:12.679Z","created_at":"2026-10-01T13:43:07.617Z","modified_at":"2026-10-01T13:44:12.683Z","response_deadline":{"raw":"2026-10-19T23:59:00-07:00","utc":"2026-10-20T06:59:00Z","date":"2026-10-19","time":"23:59:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d6b582b4c9824c12a74a68af54cb40a8/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"SR Power Supplies Rack Detailed Design for ALS-U","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-11-03","archive_type":"auto15"},"history":[{"index":7,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-01T13:44:12.679Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d6b582b4c9824c12a74a68af54cb40a8","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":6,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T14:27:58.643Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"1a1f753815bd4340a6cbd385c8406b9d","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}],"contacts":[{"name":"Arielle Anoop","role":"primary","email":"aanoop@lbl.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"d6b582b4c9824c12a74a68af54cb40a8","lineage_id":"50f33599ceea4a469164f74bf889d36f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-02T07:07:14.096021476Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"be5b55b19b729af7bdd453e30d78434d-26\"","fetched_at":"2026-10-06T03:48:34.605332942Z","row_sha256":"d16451edc77e655e62fb22c9f7eb5cca9384f4394dedfdb04be39e8b7e55e8e5","last_modified":"2026-10-06T03:30:43Z"},"updated_at":"2026-10-06T03:48:34.605332942Z","first_seen_at":"2026-10-02T04:14:23.923188772Z"},"description":{"html":"<p>This RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/25/26 to include a Questions &amp; Clarifications (QA) document No. 4.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/23/26 to include a Questions &amp; Clarifications (QA) document No. 3.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/22/26 to include a Questions &amp; Clarifications (QA) document No. 2.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/20/26 to include a Questions &amp; Clarifications (QA) document.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Dear Prospective Offeror,</p>\n\n<p></p>\n\n<p>The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in&nbsp;<strong>Request for Proposal&nbsp;(RFP)</strong>&nbsp;No.&nbsp;AA-2027-01 for&nbsp;ALS-U&nbsp;​Storage Ring Power Supplies Rack Designs.</p>\n\n<p><br />\n<em><u>The RFP&nbsp;and associated documents (listed below) are attached hereto:</u></em></p>\n\n<p>0.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;RFP&nbsp;and Proposal Preparation Instructions</p>\n\n<p>1.&nbsp; &nbsp; &nbsp; &nbsp;​&nbsp; &nbsp; ​&nbsp;Statement of Work; inclusive of all ​r​eferenced documents.</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Please view the following&nbsp;Google Drive&nbsp;for complete Technical documentation:</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;Sample Subcontract</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;​ALS-U Quality Evaluation Survey (<em><u>required with submission)</u></em>&nbsp;</p>\n\n<p>​4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; ​​​Rep Cert Form&nbsp;<em><u>(required with submission)</u></em></p>\n\n<p></p>\n\n<p><em><u>Timeline of Events:</u></em></p>\n\n<p>Questions for Clarification - no later than&nbsp;​S​eptember 24, 2026</p>\n\n<p>Pre-Proposal Conference - Week of September 28, 2026, if necessary</p>\n\n<p><strong>Submissions due&nbsp;- no later than&nbsp;​October 2, 2026.</strong></p>","text":"This RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/25/26 to include a Questions & Clarifications (QA) document No. 4.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/23/26 to include a Questions & Clarifications (QA) document No. 3.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nDear Prospective Offeror,\n\nThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs.\n\nThe RFP and associated documents (listed below) are attached hereto:\n\n0. RFP and Proposal Preparation Instructions\n\n1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents.\n\nPlease view the following Google Drive for complete Technical documentation:\n\nhttps://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj\n\n2. Sample Subcontract\n\n3. ​ALS-U Quality Evaluation Survey (required with submission)\n\n​4. ​​​Rep Cert Form (required with submission)\n\nTimeline of Events:\n\nQuestions for Clarification - no later than ​S​eptember 24, 2026\n\nPre-Proposal Conference - Week of September 28, 2026, if necessary\n\nSubmissions due - no later than ​October 2, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"AA-2027-01","place_of_performance":{"city":{"code":"6000","name":"Berkeley"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"C222"},{"dates":{"posted":"2026-10-06","posted_at":"2026-10-06T13:33:56.286Z","created_at":"2026-10-06T13:31:04.603Z","modified_at":"2026-10-06T13:33:56.290Z","response_deadline":{"raw":"2026-10-19T23:59:00-07:00","utc":"2026-10-20T06:59:00Z","date":"2026-10-19","time":"23:59:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/60317a62bb4a42f680730d70f3b43574/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"SR Power Supplies Rack Detailed Design for ALS-U","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_id":"500047665","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-11-03","archive_type":"auto15"},"history":[{"index":8,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T13:33:56.286Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"60317a62bb4a42f680730d70f3b43574","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":7,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-01T13:44:12.679Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d6b582b4c9824c12a74a68af54cb40a8","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":6,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T14:27:58.643Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"1a1f753815bd4340a6cbd385c8406b9d","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}],"contacts":[{"name":"Arielle Anoop","role":"primary","email":"aanoop@lbl.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"60317a62bb4a42f680730d70f3b43574","lineage_id":"50f33599ceea4a469164f74bf889d36f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-08T00:05:49.525762228Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"15afe663524d2ffb47ccbdc309d52851-26\"","fetched_at":"2026-10-07T04:24:57.467375089Z","row_sha256":"727ccf0b3b561d2da9fe095a4542a3ac7c78cf6f54ba8ebbea6c5b26a55a1c29","last_modified":"2026-10-07T03:30:44Z"},"updated_at":"2026-10-08T00:05:49.525762228Z","first_seen_at":"2026-10-07T04:24:57.467375089Z"},"description":{"html":"<p>LBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information.</p>\n\n<p>Attendance is optional and will not be evaluated negatively against any submitted proposal.</p>\n\n<p>The conference is intended to be recorded and publicized after it concludes.</p>\n\n<p></p>\n\n<p>Zoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1</p>\n\n<p></p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/25/26 to include a Questions &amp; Clarifications (QA) document No. 4.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/23/26 to include a Questions &amp; Clarifications (QA) document No. 3.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/22/26 to include a Questions &amp; Clarifications (QA) document No. 2.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/20/26 to include a Questions &amp; Clarifications (QA) document.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Dear Prospective Offeror,</p>\n\n<p></p>\n\n<p>The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in&nbsp;<strong>Request for Proposal&nbsp;(RFP)</strong>&nbsp;No.&nbsp;AA-2027-01 for&nbsp;ALS-U&nbsp;​Storage Ring Power Supplies Rack Designs.</p>\n\n<p><br />\n<em><u>The RFP&nbsp;and associated documents (listed below) are attached hereto:</u></em></p>\n\n<p>0.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;RFP&nbsp;and Proposal Preparation Instructions</p>\n\n<p>1.&nbsp; &nbsp; &nbsp; &nbsp;​&nbsp; &nbsp; ​&nbsp;Statement of Work; inclusive of all ​r​eferenced documents.</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Please view the following&nbsp;Google Drive&nbsp;for complete Technical documentation:</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;Sample Subcontract</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;​ALS-U Quality Evaluation Survey (<em><u>required with submission)</u></em>&nbsp;</p>\n\n<p>​4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; ​​​Rep Cert Form&nbsp;<em><u>(required with submission)</u></em></p>\n\n<p></p>\n\n<p><em><u>Timeline of Events:</u></em></p>\n\n<p>Questions for Clarification - no later than&nbsp;​S​eptember 24, 2026</p>\n\n<p>Pre-Proposal Conference - Week of September 28, 2026, if necessary</p>\n\n<p><strong>Submissions due&nbsp;- no later than&nbsp;​October 2, 2026.</strong></p>","text":"LBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information.\n\nAttendance is optional and will not be evaluated negatively against any submitted proposal.\n\nThe conference is intended to be recorded and publicized after it concludes.\n\nZoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/25/26 to include a Questions & Clarifications (QA) document No. 4.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/23/26 to include a Questions & Clarifications (QA) document No. 3.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nDear Prospective Offeror,\n\nThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs.\n\nThe RFP and associated documents (listed below) are attached hereto:\n\n0. RFP and Proposal Preparation Instructions\n\n1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents.\n\nPlease view the following Google Drive for complete Technical documentation:\n\nhttps://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj\n\n2. Sample Subcontract\n\n3. ​ALS-U Quality Evaluation Survey (required with submission)\n\n​4. ​​​Rep Cert Form (required with submission)\n\nTimeline of Events:\n\nQuestions for Clarification - no later than ​S​eptember 24, 2026\n\nPre-Proposal Conference - Week of September 28, 2026, if necessary\n\nSubmissions due - no later than ​October 2, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"AA-2027-01","place_of_performance":{"city":{"code":"6000","name":"Berkeley"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"C222"},{"dates":{"posted":"2026-10-08","posted_at":"2026-10-08T17:54:57.230Z","created_at":"2026-10-08T17:15:46.612Z","modified_at":"2026-10-08T17:54:57.235Z","response_deadline":{"raw":"2026-10-19T23:59:00-07:00","utc":"2026-10-20T06:59:00Z","date":"2026-10-19","time":"23:59:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b3eba28eed6e436384918d688651276b/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"SR Power Supplies Rack Detailed Design for ALS-U","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_id":"500047665","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-11-03","archive_type":"auto15"},"history":[{"index":9,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-08T17:54:57.230Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"b3eba28eed6e436384918d688651276b","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":8,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T13:33:56.286Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"60317a62bb4a42f680730d70f3b43574","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":7,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-01T13:44:12.679Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d6b582b4c9824c12a74a68af54cb40a8","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":6,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T14:27:58.643Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"1a1f753815bd4340a6cbd385c8406b9d","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}],"contacts":[{"name":"Arielle Anoop","role":"primary","email":"aanoop@lbl.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"b3eba28eed6e436384918d688651276b","lineage_id":"50f33599ceea4a469164f74bf889d36f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-10T00:28:07.346476480Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"88a39a008f4c126e532dc85ce516a626-26\"","fetched_at":"2026-10-09T04:25:46.346911714Z","row_sha256":"b32151574a1ac1f051a10f36323eb65ae821fa099ee9a9ec15345c226f2fb068","last_modified":"2026-10-09T03:30:27Z"},"updated_at":"2026-10-10T00:28:07.346476480Z","first_seen_at":"2026-10-09T04:25:46.346911714Z"},"description":{"html":"<p>This RFP has been revised 10/8/26 to include (3) updated documents - SOW Rev. B, Sample Subcontract &amp; ACL.</p>\n\n<p>A video recording of our 10/8/26 pre-proposal conference is also attached hereto.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>LBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information.</p>\n\n<p>Attendance is optional and will not be evaluated negatively against any submitted proposal.</p>\n\n<p>The conference is intended to be recorded and publicized after it concludes.</p>\n\n<p></p>\n\n<p>Zoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1</p>\n\n<p></p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/25/26 to include a Questions &amp; Clarifications (QA) document No. 4.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/23/26 to include a Questions &amp; Clarifications (QA) document No. 3.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/22/26 to include a Questions &amp; Clarifications (QA) document No. 2.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/20/26 to include a Questions &amp; Clarifications (QA) document.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Dear Prospective Offeror,</p>\n\n<p></p>\n\n<p>The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in&nbsp;<strong>Request for Proposal&nbsp;(RFP)</strong>&nbsp;No.&nbsp;AA-2027-01 for&nbsp;ALS-U&nbsp;​Storage Ring Power Supplies Rack Designs.</p>\n\n<p><br />\n<em><u>The RFP&nbsp;and associated documents (listed below) are attached hereto:</u></em></p>\n\n<p>0.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;RFP&nbsp;and Proposal Preparation Instructions</p>\n\n<p>1.&nbsp; &nbsp; &nbsp; &nbsp;​&nbsp; &nbsp; ​&nbsp;Statement of Work; inclusive of all ​r​eferenced documents.</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Please view the following&nbsp;Google Drive&nbsp;for complete Technical documentation:</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;Sample Subcontract</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;​ALS-U Quality Evaluation Survey (<em><u>required with submission)</u></em>&nbsp;</p>\n\n<p>​4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; ​​​Rep Cert Form&nbsp;<em><u>(required with submission)</u></em></p>\n\n<p></p>\n\n<p><em><u>Timeline of Events:</u></em></p>\n\n<p>Questions for Clarification - no later than&nbsp;​S​eptember 24, 2026</p>\n\n<p>Pre-Proposal Conference - Week of September 28, 2026, if necessary</p>\n\n<p><strong>Submissions due&nbsp;- no later than&nbsp;​October 2, 2026.</strong></p>","text":"This RFP has been revised 10/8/26 to include (3) updated documents - SOW Rev. B, Sample Subcontract & ACL.\n\nA video recording of our 10/8/26 pre-proposal conference is also attached hereto.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nLBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information.\n\nAttendance is optional and will not be evaluated negatively against any submitted proposal.\n\nThe conference is intended to be recorded and publicized after it concludes.\n\nZoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/25/26 to include a Questions & Clarifications (QA) document No. 4.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/23/26 to include a Questions & Clarifications (QA) document No. 3.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nDear Prospective Offeror,\n\nThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs.\n\nThe RFP and associated documents (listed below) are attached hereto:\n\n0. RFP and Proposal Preparation Instructions\n\n1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents.\n\nPlease view the following Google Drive for complete Technical documentation:\n\nhttps://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj\n\n2. Sample Subcontract\n\n3. ​ALS-U Quality Evaluation Survey (required with submission)\n\n​4. ​​​Rep Cert Form (required with submission)\n\nTimeline of Events:\n\nQuestions for Clarification - no later than ​S​eptember 24, 2026\n\nPre-Proposal Conference - Week of September 28, 2026, if necessary\n\nSubmissions due - no later than ​October 2, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"AA-2027-01","place_of_performance":{"city":{"code":"6000","name":"Berkeley"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"C222"},{"dates":{"posted":"2026-10-12","posted_at":"2026-10-12T18:34:35.043Z","created_at":"2026-10-12T18:32:10.797Z","modified_at":"2026-10-12T18:34:35.047Z","response_deadline":{"raw":"2026-10-19T23:59:00-07:00","utc":"2026-10-20T06:59:00Z","date":"2026-10-19","time":"23:59:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/90ad22b027af43988c27ea3e9513dbfc/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"SR Power Supplies Rack Detailed Design for ALS-U","agency":{"office":{"code":"899032","name":"BERKELEY NATL LAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"organization_id":"500047665","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-11-03","archive_type":"auto15"},"history":[{"index":10,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-12T18:34:35.043Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"90ad22b027af43988c27ea3e9513dbfc","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":9,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-08T17:54:57.230Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"b3eba28eed6e436384918d688651276b","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":8,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-06T13:33:56.286Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"60317a62bb4a42f680730d70f3b43574","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":7,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-01T13:44:12.679Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d6b582b4c9824c12a74a68af54cb40a8","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":6,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T14:27:58.643Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"1a1f753815bd4340a6cbd385c8406b9d","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":5,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-23T23:42:03.655Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3921f5cab42e4e0a9dc24d0d08c51d22","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":4,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-22T16:24:26.616Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"36fa3dd664ef4553b63146eb4711c602","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":3,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:27:47.124Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"0a12322895ef4c39af903ac8bc55404c","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":2,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T19:21:02.254Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a646318ed8184d6f87f5e12a8c18a92a","solicitation_number":"AA-2027-01","parent_opportunity_id":"50f33599ceea4a469164f74bf889d36f"},{"index":1,"title":"SR Power Supplies Rack Detailed Design for ALS-U","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-20T12:27:07.292Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"50f33599ceea4a469164f74bf889d36f","solicitation_number":"AA-2027-01"}],"contacts":[{"name":"Arielle Anoop","role":"primary","email":"aanoop@lbl.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"90ad22b027af43988c27ea3e9513dbfc","lineage_id":"50f33599ceea4a469164f74bf889d36f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T00:01:05.993181120Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"8b18aae6c12e4932f92505e53149e3af-25\"","fetched_at":"2026-10-13T04:30:22.179133037Z","row_sha256":"58864ecf480617570beae2f0d2ba0008420956f0eb17370bf92069fc16bbe937","last_modified":"2026-10-13T03:30:28Z"},"updated_at":"2026-10-14T00:01:05.993181120Z","first_seen_at":"2026-10-13T04:30:22.179133037Z"},"description":{"html":"<p>This RFP has been revised 10/12/26 to include a Questions &amp; Clarifications (QA) document No. 5.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 10/8/26 to include (3) updated documents - SOW Rev. B, Sample Subcontract &amp; ACL.</p>\n\n<p>A video recording of our 10/8/26 pre-proposal conference is also attached hereto.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>LBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information.</p>\n\n<p>Attendance is optional and will not be evaluated negatively against any submitted proposal.</p>\n\n<p>The conference is intended to be recorded and publicized after it concludes.</p>\n\n<p></p>\n\n<p>Zoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1</p>\n\n<p></p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/25/26 to include a Questions &amp; Clarifications (QA) document No. 4.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/23/26 to include a Questions &amp; Clarifications (QA) document No. 3.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/22/26 to include a Questions &amp; Clarifications (QA) document No. 2.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/20/26 to include a Questions &amp; Clarifications (QA) document.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Dear Prospective Offeror,</p>\n\n<p></p>\n\n<p>The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in&nbsp;<strong>Request for Proposal&nbsp;(RFP)</strong>&nbsp;No.&nbsp;AA-2027-01 for&nbsp;ALS-U&nbsp;​Storage Ring Power Supplies Rack Designs.</p>\n\n<p><br />\n<em><u>The RFP&nbsp;and associated documents (listed below) are attached hereto:</u></em></p>\n\n<p>0.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;RFP&nbsp;and Proposal Preparation Instructions</p>\n\n<p>1.&nbsp; &nbsp; &nbsp; &nbsp;​&nbsp; &nbsp; ​&nbsp;Statement of Work; inclusive of all ​r​eferenced documents.</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Please view the following&nbsp;Google Drive&nbsp;for complete Technical documentation:</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;Sample Subcontract</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;​ALS-U Quality Evaluation Survey (<em><u>required with submission)</u></em>&nbsp;</p>\n\n<p>​4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; ​​​Rep Cert Form&nbsp;<em><u>(required with submission)</u></em></p>\n\n<p></p>\n\n<p><em><u>Timeline of Events:</u></em></p>\n\n<p>Questions for Clarification - no later than&nbsp;​S​eptember 24, 2026</p>\n\n<p>Pre-Proposal Conference - Week of September 28, 2026, if necessary</p>\n\n<p><strong>Submissions due&nbsp;- no later than&nbsp;​October 2, 2026.</strong></p>","text":"This RFP has been revised 10/12/26 to include a Questions & Clarifications (QA) document No. 5.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 10/8/26 to include (3) updated documents - SOW Rev. B, Sample Subcontract & ACL.\n\nA video recording of our 10/8/26 pre-proposal conference is also attached hereto.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nLBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information.\n\nAttendance is optional and will not be evaluated negatively against any submitted proposal.\n\nThe conference is intended to be recorded and publicized after it concludes.\n\nZoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/25/26 to include a Questions & Clarifications (QA) document No. 4.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/23/26 to include a Questions & Clarifications (QA) document No. 3.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nDear Prospective Offeror,\n\nThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs.\n\nThe RFP and associated documents (listed below) are attached hereto:\n\n0. RFP and Proposal Preparation Instructions\n\n1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents.\n\nPlease view the following Google Drive for complete Technical documentation:\n\nhttps://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj\n\n2. Sample Subcontract\n\n3. ​ALS-U Quality Evaluation Survey (required with submission)\n\n​4. ​​​Rep Cert Form (required with submission)\n\nTimeline of Events:\n\nQuestions for Clarification - no later than ​S​eptember 24, 2026\n\nPre-Proposal Conference - Week of September 28, 2026, if necessary\n\nSubmissions due - no later than ​October 2, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"AA-2027-01","place_of_performance":{"city":{"code":"6000","name":"Berkeley"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"C222"}],"due_at":"2026-10-20T06:59:00Z","due_date":"2026-10-19","closes_at":"2026-10-20T06:59:00Z","awardable":true,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899032","office_name":"BERKELEY NATL LAB - DOE CONTRACTOR","state":"CA","county":"06001","county_name":"Alameda County","city":"0606000","city_name":"Berkeley","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-04T06:19:02.349798Z","principal_notice_id":"90ad22b027af43988c27ea3e9513dbfc","description":{"text":"This RFP has been revised 10/12/26 to include a Questions & Clarifications (QA) document No. 5.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 10/8/26 to include (3) updated documents - SOW Rev. B, Sample Subcontract & ACL.\n\nA video recording of our 10/8/26 pre-proposal conference is also attached hereto.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nLBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information.\n\nAttendance is optional and will not be evaluated negatively against any submitted proposal.\n\nThe conference is intended to be recorded and publicized after it concludes.\n\nZoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/25/26 to include a Questions & Clarifications (QA) document No. 4.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/23/26 to include a Questions & Clarifications (QA) document No. 3.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nThis RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.\n\nAll other terms and conditions of this RFP remain the same.\n\n______________________________________________________________________\n\nDear Prospective Offeror,\n\nThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs.\n\nThe RFP and associated documents (listed below) are attached hereto:\n\n0. RFP and Proposal Preparation Instructions\n\n1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents.\n\nPlease view the following Google Drive for complete Technical documentation:\n\nhttps://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj\n\n2. Sample Subcontract\n\n3. ​ALS-U Quality Evaluation Survey (required with submission)\n\n​4. ​​​Rep Cert Form (required with submission)\n\nTimeline of Events:\n\nQuestions for Clarification - no later than ​S​eptember 24, 2026\n\nPre-Proposal Conference - Week of September 28, 2026, if necessary\n\nSubmissions due - no later than ​October 2, 2026.","html":"<p>This RFP has been revised 10/12/26 to include a Questions &amp; Clarifications (QA) document No. 5.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 10/8/26 to include (3) updated documents - SOW Rev. B, Sample Subcontract &amp; ACL.</p>\n\n<p>A video recording of our 10/8/26 pre-proposal conference is also attached hereto.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>LBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information.</p>\n\n<p>Attendance is optional and will not be evaluated negatively against any submitted proposal.</p>\n\n<p>The conference is intended to be recorded and publicized after it concludes.</p>\n\n<p></p>\n\n<p>Zoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1</p>\n\n<p></p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/25/26 to include a Questions &amp; Clarifications (QA) document No. 4.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/23/26 to include a Questions &amp; Clarifications (QA) document No. 3.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/22/26 to include a Questions &amp; Clarifications (QA) document No. 2.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>This RFP has been revised 9/20/26 to include a Questions &amp; Clarifications (QA) document.</p>\n\n<p>All other terms and conditions of this RFP remain the same.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Dear Prospective Offeror,</p>\n\n<p></p>\n\n<p>The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in&nbsp;<strong>Request for Proposal&nbsp;(RFP)</strong>&nbsp;No.&nbsp;AA-2027-01 for&nbsp;ALS-U&nbsp;​Storage Ring Power Supplies Rack Designs.</p>\n\n<p><br />\n<em><u>The RFP&nbsp;and associated documents (listed below) are attached hereto:</u></em></p>\n\n<p>0.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;RFP&nbsp;and Proposal Preparation Instructions</p>\n\n<p>1.&nbsp; &nbsp; &nbsp; &nbsp;​&nbsp; &nbsp; ​&nbsp;Statement of Work; inclusive of all ​r​eferenced documents.</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Please view the following&nbsp;Google Drive&nbsp;for complete Technical documentation:</p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;Sample Subcontract</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;&nbsp;&nbsp; &nbsp; &nbsp;&nbsp;​ALS-U Quality Evaluation Survey (<em><u>required with submission)</u></em>&nbsp;</p>\n\n<p>​4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; ​​​Rep Cert Form&nbsp;<em><u>(required with submission)</u></em></p>\n\n<p></p>\n\n<p><em><u>Timeline of Events:</u></em></p>\n\n<p>Questions for Clarification - no later than&nbsp;​S​eptember 24, 2026</p>\n\n<p>Pre-Proposal Conference - Week of September 28, 2026, if necessary</p>\n\n<p><strong>Submissions due&nbsp;- no later than&nbsp;​October 2, 2026.</strong></p>","origin":"detail"},"contacts":[{"name":"Arielle Anoop","role":"primary","email":"aanoop@lbl.gov"}],"place_of_performance":{"city":{"code":"6000","name":"Berkeley"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"94720","city":"Berkeley","state":"CA","country":"USA"},"naics_codes":["541330"],"award":null,"attachments":[{"resource_id":"1fa292c2426b464db8f417edc980c74d","name":"4. Standard Form Rep Cert, RFP AA-2027-01.docx","kind":"file","mime_type":".docx","size_bytes":67215,"posted_at":"2026-09-20T12:27:07.292Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1fa292c2426b464db8f417edc980c74d/download","mirrored":false}],"awards":[],"related":[{"key":"AA202702","latest_notice_id":"82ba018cdef0464e8c504512681fa22c","title":"Fabricated Components for the SR Embedded Floor Plates for the ALS-U Project","solicitation_number":"AA-2027-02","notice_type":"k","first_type":"k","first_posted":"2026-10-19","last_posted":"2026-11-19","notices":7,"due_at":"2026-11-26T01:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899032","office_name":"BERKELEY NATL LAB - DOE CONTRACTOR","naics":"332999","psc":"6640","set_aside":null,"state":"CA","county":"06001","county_name":"Alameda County","city":"0606000","city_name":"Berkeley","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"BZ202702","latest_notice_id":"2adcc9edc63d4b44bd8c02ec45f2fdb6","title":"Direct Write Lithography System","solicitation_number":"BZ-2027-02","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-02T22:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899032","office_name":"BERKELEY NATL LAB - DOE CONTRACTOR","naics":"333242","psc":"3670","set_aside":null,"state":"CA","county":"06001","county_name":"Alameda County","city":"0606000","city_name":"Berkeley","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"MG11192026","latest_notice_id":"8f3d5eef1fe34a6d85b78cf7dc3a3695","title":"Advanced Light Source Upgrade (ALS-U) STORAGE RING (SR) BENDB AND BENDC MAGNETS","solicitation_number":"MG-11192026","notice_type":"o","first_type":"o","first_posted":"2026-11-18","last_posted":"2026-11-19","notices":2,"due_at":"2026-12-21T23:00:00Z","due_date":"2026-12-21","closes_at":"2026-12-21T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899032","office_name":"BERKELEY NATL LAB - DOE CONTRACTOR","naics":"332999","psc":"5999","set_aside":null,"state":"CA","county":"06001","county_name":"Alameda County","city":"0606000","city_name":"Berkeley","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"2026PTGFACPR","latest_notice_id":"08b23b2676624773a82f5ef5e64db152","title":"Fire Alarm Control Panel Replacement Project (FACPR)","solicitation_number":"2026-PTG-FACPR","notice_type":"o","first_type":"o","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2027-01-09T01:00:00Z","due_date":"2027-01-08","closes_at":"2027-01-09T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899032","office_name":"BERKELEY NATL LAB - DOE CONTRACTOR","naics":"238210","psc":"1230","set_aside":null,"state":"CA","county":"06001","county_name":"Alameda County","city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open":[{"key":"80NSSC27949205Q","latest_notice_id":"23182628fc84473aa336c4cd21585a65","title":"Universal Robotics e-Series Arm","solicitation_number":"80NSSC27949205Q","notice_type":"k","first_type":"k","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-080","dept_name":"NATIONAL AERONAUTICS AND SPACE ADMINISTRATION","sub_key":"s-8000","sub_name":"NATIONAL AERONAUTICS AND SPACE ADMINISTRATION","office_key":"o-80NSSC","office_name":"NASA SHARED SERVICES CENTER","naics":"541330","psc":"7E21","set_aside":"SBA","state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"697DCK27R00022A","latest_notice_id":"555bbe8d6aa64108bca5569444c05dad","title":"Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA","solicitation_number":"697DCK-27-R-00022A","notice_type":"o","first_type":"o","first_posted":"2026-10-26","last_posted":"2026-11-23","notices":7,"due_at":"2026-12-02T22:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","naics":"541330","psc":"C215","set_aside":"SBA","state":"CA","county":"06079","county_name":"San Luis Obispo County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"N39430AEIDIQ","latest_notice_id":"14e64d47a82141a7a29b0e663bbae7a8","title":"PUBLIC WORKS ENERGY A-E SERVICES CONTRACTS","solicitation_number":"N39430AEIDIQ","notice_type":"r","first_type":"r","first_posted":"2026-11-03","last_posted":"2026-11-03","notices":1,"due_at":"2026-12-03T20:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N39430","office_name":"NAVFAC SYSTEMS AND EXP WARFARE CTR","naics":"541330","psc":"C219","set_aside":null,"state":"CA","county":"06111","county_name":"Ventura County","city":"0658296","city_name":"Port Hueneme","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-04T05:14:00.353426Z"}],"similar_open_total":100,"indexable":false}