Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,711 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

CGC KATMAI BAY LOADBANKING TESTING

70Z085Q250012813

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Response deadline

May 19, 2025 at 11:00 AM EDT

Closed 556 days ago. Posted May 14, 2025, first published May 7, 2025. Scheduled to archive May 19, 2025.

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one closed in 2025

107 like it are open now in ship building and repairing

  • USNS CITY OF BISMARCK (T-EPF 9) VRA KR

    Department of the Navy, NAVSUP FLT Log CTR Yokosuka

    SolicitationNAICS 336611Outside the USN6264927RK003
    Due tomorrowNov 27
  • Ship Repair

    Department of the Navy, NAVSUP FLC Sigonella Naples Office

    SolicitationNAICS 336611Outside the USN6817127QN013
    Due tomorrowNov 27
  • WATCH SUPV CHAIR

    Department of the Navy, NAVSUP Weapon Systems Support Mech

    SolicitationNAICS 336611Ship to the buyerN0010427QBB55
    Due tomorrowNov 27

All 107 open in ship building and repairing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 12 days from the day the solicitation was posted, May 7, 2025, to the deadline. The deadline moved 2 times: it was first May 12, 2025 and ended as May 19, 2025.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

THIS IS TO BE AWARDED BASED OFF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.

FAIRBANK MORSE MODEL 8 1/8 OPPOSED PISTON/WESTINGHOUSE MAIN PROPULSION GENERATOR BREAK IN LOAD BANKING

SPECIFICATION FOR DOCKSIDE MAINTENANCE

Developed By: IBCT Product Line

(Rev-0, 27 Feb 2025)

TABLE OF CONTENTS

Revisions Record. iii

Consolidated List of References. iv

Consolidated List of Government-furnished Property. v

Consolidated List of Critical Inspection Items. vi

General Requirements. 8

WORK ITEM 1:  Main Diesel Engine (MDE, Hot Lube Oil Flush…………………...………………….16

Revisions Record

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.  Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE

REV#

WORK ITEM#

CHANGES MADE

NOTE :  All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision.  This revised specification is self-contained with all of the above listed changes incorporated.

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein.  Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge.  Other Government documents may be accessed – free of charge – as follows:

  • MIL/DOD/CID Specifications:  http://www.assistdocs.com/search/search_basic.cfm
  • Commandant Instruction Manuals:  http://www.uscg.mil/directives/default.asp
  • Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::  www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

  • American Welding Society (AWS):  http://www.awspubs.com/index.php
  • ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards:  http://www.techstreet.com/
  • NFPA:  http://www.nfpa.org
  • SSPC Standards and pictorial guides:  http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes & Details

Coast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement

Coast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Coast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine – Model 38D8-1/8

Coast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation

Coast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators & Motors

OTHER REFERENCES

None

Consolidated List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

None

Consolidated List of Critical Inspection Items

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

None

23300_SSDG #1 and #2Overhl_0819_IBCT

General Requirements

1. SCOPE

1.1 Intent. The work item describes the requirement for the contractor to conduct load bank on #1 Main Propulsion Generator and #2 Main Propulsion Generator to allow for the proper breaking in of #1 Main Diesel Engine and #2 Main Diesel Engine, post Center Section Overhaul and balance both propulsion generators.  Main Propulsion Generator is Westinghouse 1000KW propulsion generator (Prop Gen)

Table 1. Engine(s) to Fl

Engine #

Manufacturer

Characteristics

Serial #

#1 Main Propulsion Generator

Westinghouse

1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles

N/A

#2 Main Propulsion Generator

Westinghouse

1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles

N/A

 1.2 Government-furnished property.

None

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes & Details

Coast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement

Coast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement

Coast Guard Publications

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Coast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine – Model 38D8-1/8

Coast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation

Coast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators & Motors

Other References

None

REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.  The Contractor must provide the services of a qualified technician, who is familiar with load banking equipment including all equipment set up

3.1.2.1 Removed.

3.1.2.2 Removed.

3.1.3 Protective measures.  The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences.  The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

  • Deck plates.
  • Deck framing.
  • Piping.
  • Handrails.
  • Electrical wiring and cables/cableways.
  • Miscellaneous machinery.

3.1.5 Contamination prevention.  The Contractor must take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.

WARNING

Do not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.

3.2  Work plan.  The Contractor shall provide a work plan to the Contracting Officer (KO), at the time of solicitation submission, which lists all procedures, plans, and equipment the Contractor will utilize in support of flushing requirements. At a minimum, the plan shall include the following:

  • Qualifications of Technicians
  • Submission of equipment being used to conduct load banking

3.3  None

3.4 Load Banking Procedure requirements.

3.4.1 Load Banking equipment.  The Contractor shall provide all equipment required to support load banking both Main Propulsion Generators in single operation and parallel operations including (but not limited to), the following:

3.4.1.1 Load Bank(s).  Load Bank meeting the characteristics of the Main Propulsion Generator

3.4.1.2 Wiring.  Electric wiring of proper sizing to hook up load bank to Main Propulsion Generator (approx. 150 ft).

3.4.1.3 Portable Particle Counter.  A particle counter capable of continuously measuring fluid contamination with output in NAS code.

3.4.5 COR notification.  The Contractor shall notify the Senior Chief Ian Duthie (MAT Supervsior) when load bank is connected to appropriate machinery. 

3.4.6 Inspector witnessing and approval.  The Contractor shall ensure that the Coast Guard Inspector is present during all load banking procedures.  The Contractor’s will submit written report upon completion of load bank of all parameters at each interval.

3.4.7 Requirements

3.4.7.1 See below table of load banking loads and timelines

Engine Speed (RPMs)

Time (min)

Main Propulsion Generator Load

Mechanical Checks

300

5

No Load

B

350

15

No Load

A,B

450

15

No Load

550

15

No Load

650

15

No Load

720

15

No Load

A, B

720

60 (1 hour)

25%

A, B

720

60 (1 hour)

37.5%

A

720

120 (2 hour)

50%

A

720

180 (3 hour)

62.5%

A

720

180 (3 hour)

75%

A

720

180 (3 hour)

87.5%

A

720

180 (3 hour)

100%

A,B

3.4.7.2 Load banking Main Propulsion Generators in parallel.  Load banking in parallel will be to support grooming of MPCMS by Affinity Power System.  Groom will take approx.. 8 hours.

3.4.7.3 Once all MDE break in period and MPCMS groom is completed contractor shall disconnect all equipment and return MPG back to original configuration. 

3.4.7.4 Wipe clean any surfaces contaminated by load bank equipment. 

4.  NOTES

4.1 Equipment operation. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests besides load bank.

4.2 Coast Guard can assist with loading and unloading equipment from trailers.

4.3 Security Requirements

4.3.1 Citizenship. Each individual employed under the contract shall be a citizen of the United States of America, or an alien who has been lawfully admitted for permanent residence as evidenced by a Permanent Resident Card (USCIS I-551). Any exceptions must be approved by the Coast Guard’s Security Officer or designee.  Contractors shall identify in their proposals, the names and citizenship of all non-U.S. citizens proposed to work under the contract. Any additions or deletions of non-U.S. citizens after contract award shall also be reported to the Contracting Officer.

4.3.2 Identification. In accordance with federal facility access control policies, all contractor personnel, including subcontractors and any individuals employed by the contractor who require access to the installation, must possess a valid form of identification that complies with the REAL ID Act of 2005. Access will be denied to any individual presenting non-compliant identification. It is the responsibility of the contractor to ensure that all personnel meet this requirement prior to arrival at the federal installation.

4.4 Location. USCGC Katmai Bay.  337 East Water Street, Sault Sainte Marie, MI 49783.

4.5. Period of Performance. Contract awardee will begin work within three (3) calendar days of award notification. Work will be completed within three (3) calendar days of the start date.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 7, 2025

    Combined synopsis and solicitation

    Due May 12, 2025 at 11:00 AM EDT. SAM.gov, notice 64217bdf483349a9abcf4387d90f4372

    3 revisions on SAM
    • May 14, 2025: publish, combined synopsis and solicitation
    • May 12, 2025: publish, combined synopsis and solicitation
    • May 7, 2025: publish, combined synopsis and solicitation
  2. May 12, 2025

    Combined synopsis and solicitation

    Due May 14, 2025 at 11:00 AM EDT. SAM.gov, notice a1fcc0bdf6fc493bb53d9f0ba2ac2ad8

    3 revisions on SAM
    • May 14, 2025: publish, combined synopsis and solicitation
    • May 12, 2025: publish, combined synopsis and solicitation
    • May 7, 2025: publish, combined synopsis and solicitation
  3. May 14, 2025

    Combined synopsis and solicitation

    Due May 19, 2025 at 11:00 AM EDT. SAM.gov, notice d3ad0f9a799c46dda71f8cb6e165e59d

    3 revisions on SAM
    • May 14, 2025: publish, combined synopsis and solicitation
    • May 12, 2025: publish, combined synopsis and solicitation
    • May 7, 2025: publish, combined synopsis and solicitation

Points of contact