{"canonical":"https://sealedbidder.com/opportunities/70z085q250012813","key":"70Z085Q250012813","url":"https://sealedbidder.com/opportunities/70z085q250012813","title":"CGC KATMAI BAY LOADBANKING TESTING","solicitation_number":"70Z085Q250012813","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-05-19T15:00:00Z","first_posted":"2025-05-07","last_posted":"2025-05-14","department":"HOMELAND SECURITY, DEPARTMENT OF","subagency":"US COAST GUARD","office":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"J020","set_aside":"SBA","place_state":"MI","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"26033","place_county_name":"Chippewa County","place_city":"2671740","place_city_name":"Sault Ste. Marie","winner":null,"award_amount":null,"publications":[{"notice_id":"64217bdf483349a9abcf4387d90f4372","title":"CGC KATMAI BAY LOADBANKING TESTING","solicitation_number":"70Z085Q250012813","notice_type":"k","base_type":"k","posted":"2025-05-07","posted_at":"2025-05-07T15:25:29.884Z","due_at":"2025-05-12T15:00:00Z","due_date":"2025-05-12","cancelled":false,"archived":true,"archive_date":"2025-05-12","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/64217bdf483349a9abcf4387d90f4372/view","enriched":true,"history":[{"index":4,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:58:39.751Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d3ad0f9a799c46dda71f8cb6e165e59d","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":2,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:00:02.006Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a1fcc0bdf6fc493bb53d9f0ba2ac2ad8","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":1,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-07T15:25:29.884Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64217bdf483349a9abcf4387d90f4372","solicitation_number":"70Z085Q250012813"}]},{"notice_id":"a1fcc0bdf6fc493bb53d9f0ba2ac2ad8","title":"CGC KATMAI BAY LOADBANKING TESTING","solicitation_number":"70Z085Q250012813","notice_type":"k","base_type":"k","posted":"2025-05-12","posted_at":"2025-05-12T19:00:02.006Z","due_at":"2025-05-14T15:00:00Z","due_date":"2025-05-14","cancelled":false,"archived":true,"archive_date":"2025-05-14","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a1fcc0bdf6fc493bb53d9f0ba2ac2ad8/view","enriched":true,"history":[{"index":4,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:58:39.751Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d3ad0f9a799c46dda71f8cb6e165e59d","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":2,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:00:02.006Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a1fcc0bdf6fc493bb53d9f0ba2ac2ad8","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":1,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-07T15:25:29.884Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64217bdf483349a9abcf4387d90f4372","solicitation_number":"70Z085Q250012813"}]},{"notice_id":"d3ad0f9a799c46dda71f8cb6e165e59d","title":"CGC KATMAI BAY LOADBANKING TESTING","solicitation_number":"70Z085Q250012813","notice_type":"k","base_type":"k","posted":"2025-05-14","posted_at":"2025-05-14T17:58:39.751Z","due_at":"2025-05-19T15:00:00Z","due_date":"2025-05-19","cancelled":false,"archived":true,"archive_date":"2025-05-19","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d3ad0f9a799c46dda71f8cb6e165e59d/view","enriched":true,"history":[{"index":4,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:58:39.751Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d3ad0f9a799c46dda71f8cb6e165e59d","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":2,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:00:02.006Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a1fcc0bdf6fc493bb53d9f0ba2ac2ad8","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":1,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-07T15:25:29.884Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64217bdf483349a9abcf4387d90f4372","solicitation_number":"70Z085Q250012813"}]}],"latest_notice_id":"d3ad0f9a799c46dda71f8cb6e165e59d","first_type":"k","notices":[{"dates":{"posted":"2025-05-07","posted_at":"2025-05-07T15:25:29.884Z","created_at":"2025-05-07T15:07:32.892Z","modified_at":"2025-05-20T03:56:03.496Z","response_deadline":{"raw":"2025-05-12T08:00:00-07:00","utc":"2025-05-12T15:00:00Z","date":"2025-05-12","time":"08:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/64217bdf483349a9abcf4387d90f4372/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"CGC KATMAI BAY LOADBANKING TESTING","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-12","archive_type":"auto_custom"},"history":[{"index":4,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:58:39.751Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d3ad0f9a799c46dda71f8cb6e165e59d","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":2,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:00:02.006Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a1fcc0bdf6fc493bb53d9f0ba2ac2ad8","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":1,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-07T15:25:29.884Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64217bdf483349a9abcf4387d90f4372","solicitation_number":"70Z085Q250012813"}],"contacts":[{"name":"GEORGE, JERAMYAH","role":"primary","email":"JERAMYAH.W.GEORGE@USCG.MIL","phone":"5716102958"},{"name":"DONNA O'NEAL","role":"secondary","email":"Donna.J.O'Neal@uscg.mil","phone":"5103931145"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"64217bdf483349a9abcf4387d90f4372","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"64217bdf483349a9abcf4387d90f4372","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T11:57:41.570035511Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c795f80eaea81d7de0f407bb86ffac42ad655c20312943383eeafb3e6a520746","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T11:57:41.570035511Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong><em>THIS IS TO BE AWARDED BASED OFF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.</em></strong></p>\n\n<p>FAIRBANK MORSE MODEL 8 1/8 OPPOSED PISTON/WESTINGHOUSE MAIN PROPULSION GENERATOR BREAK IN LOAD BANKING</p>\n\n<p>SPECIFICATION FOR DOCKSIDE MAINTENANCE</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p>Developed By: IBCT Product Line</p>\n\n<p>(Rev-0, 27 Feb 2025)</p>\n\n<p></p>\n\n<p><strong>TABLE OF CONTENTS</strong></p>\n\n<p>Revisions Record. iii</p>\n\n<p>Consolidated List of References. iv</p>\n\n<p>Consolidated List of Government-furnished Property. v</p>\n\n<p>Consolidated List of Critical Inspection Items. vi</p>\n\n<p>General Requirements. 8</p>\n\n<p>WORK ITEM 1:&nbsp; Main Diesel Engine (MDE, Hot Lube Oil Flush&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;...&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;.16</p>\n\n<p></p>\n\n<p>Revisions Record</p>\n\n<p>This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.&nbsp; Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.</p>\n\n<p><strong>DATE</strong></p>\n\n<p><strong>REV#</strong></p>\n\n<p><strong>WORK ITEM#</strong></p>\n\n<p><strong>CHANGES MADE</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>NOTE :&nbsp; All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision.&nbsp; This revised specification is self-contained with all of the above listed changes incorporated.</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p>Consolidated List of References</p>\n\n<p>The below-listed documents form a part of this specification to the extent specified herein.&nbsp; Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.</p>\n\n<p>All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge.&nbsp;&nbsp;Other Government documents may be accessed &ndash; free of charge &ndash; as follows:</p>\n\n<ul>\n\t<li>MIL/DOD/CID Specifications:&nbsp; http://www.assistdocs.com/search/search_basic.cfm</li>\n\t<li>Commandant Instruction Manuals:&nbsp; http://www.uscg.mil/directives/default.asp</li>\n\t<li>Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::&nbsp; www.gpoaccess.gov</li>\n</ul>\n\n<p>The Government is aware of the following internet web links where contractors may procure commercial specifications:</p>\n\n<ul>\n\t<li>American Welding Society (AWS):&nbsp; http://www.awspubs.com/index.php</li>\n\t<li>ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards:&nbsp; http://www.techstreet.com/</li>\n\t<li>NFPA:&nbsp; http://www.nfpa.org</li>\n\t<li>SSPC Standards and pictorial guides:&nbsp; http://shopping.netsuite.com/sspcmarketplace<strong> </strong></li>\n</ul>\n\n<p><strong>COAST GUARD DRAWINGS</strong></p>\n\n<p>Coast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes &amp; Details</p>\n\n<p>Coast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement</p>\n\n<p>Coast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement</p>\n\n<p><strong>COAST GUARD PUBLICATIONS</strong></p>\n\n<p>Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements</p>\n\n<p>Coast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine &ndash; Model 38D8-1/8</p>\n\n<p>Coast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation</p>\n\n<p>Coast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment</p>\n\n<p>Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators &amp; Motors</p>\n\n<p><strong>OTHER REFERENCES</strong></p>\n\n<p>None</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p>Consolidated List of Government-furnished Property</p>\n\n<p>The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.</p>\n\n<p>None</p>\n\n<p>Consolidated List of Critical Inspection Items</p>\n\n<p>The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):</p>\n\n<p>None</p>\n\n<p></p>\n\n<p></p>\n\n<p><em>23300_SSDG #1 and #2Overhl_0819_IBCT</em></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>General Requirements</strong></p>\n\n<p><strong>1. SCOPE</strong></p>\n\n<p>1.1 <u>Intent</u>. The work item describes the requirement for the contractor to conduct load bank on #1 Main Propulsion Generator and #2 Main Propulsion Generator to allow for the proper breaking in of #1 Main Diesel Engine and #2 Main Diesel Engine, post Center Section Overhaul and balance both propulsion generators.&nbsp; Main Propulsion Generator is Westinghouse 1000KW propulsion generator (Prop Gen)</p>\n\n<p><strong>Table 1. Engine(s) to Fl</strong></p>\n\n<p>Engine #</p>\n\n<p>Manufacturer</p>\n\n<p></p>\n\n<p>Characteristics</p>\n\n<p>Serial #</p>\n\n<p>#1 Main Propulsion Generator</p>\n\n<p>Westinghouse</p>\n\n<p></p>\n\n<p>1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles</p>\n\n<p>N/A</p>\n\n<p>#2 Main Propulsion Generator</p>\n\n<p>Westinghouse</p>\n\n<p>1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles</p>\n\n<p>N/A</p>\n\n<p>&nbsp;1.2 <u>Government-furnished property</u>.</p>\n\n<p>None</p>\n\n<p><strong>2. REFERENCES</strong></p>\n\n<p><strong>Coast Guard Drawings</strong></p>\n\n<p>Coast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes &amp; Details</p>\n\n<p>Coast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement</p>\n\n<p>Coast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>Coast Guard Publications</strong></p>\n\n<p>Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements</p>\n\n<p>Coast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine &ndash; Model 38D8-1/8</p>\n\n<p>Coast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation</p>\n\n<p>Coast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment</p>\n\n<p>Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators &amp; Motors</p>\n\n<p></p>\n\n<p><strong>Other References</strong></p>\n\n<p>None</p>\n\n<p><strong>REQUIREMENTS</strong></p>\n\n<p>3.1 <u>General</u>.</p>\n\n<p>3.1.1 <u>CIR.</u></p>\n\n<p>None.</p>\n\n<p>3.1.2 <u>Tech Rep</u>.&nbsp; The Contractor must provide the services of a qualified technician, who is familiar with load banking equipment including all equipment set up</p>\n\n<p>3.1.2.1 <em>Removed.</em></p>\n\n<p>3.1.2.2 <em>Removed</em>.</p>\n\n<p>3.1.3 <u>Protective measures</u>.&nbsp; The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).</p>\n\n<p>3.1.4 <u>Interferences</u>.&nbsp; The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:</p>\n\n<ul>\n\t<li>Deck plates.</li>\n\t<li>Deck framing.</li>\n\t<li>Piping.</li>\n\t<li>Handrails.</li>\n\t<li>Electrical wiring and cables/cableways.</li>\n\t<li>Miscellaneous machinery.</li>\n</ul>\n\n<p>3.1.5 <u>Contamination prevention</u>.&nbsp; The Contractor must take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.</p>\n\n<p></p>\n\n<p><strong>WARNING</strong></p>\n\n<p><strong>Do not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.</strong></p>\n\n<p>3.2 &nbsp;<u>Work plan</u>. &nbsp;The Contractor shall provide a work plan to the Contracting Officer (KO), at the time of solicitation submission, which lists all procedures, plans, and equipment the Contractor will utilize in support of flushing requirements. At a minimum, the plan shall include the following:</p>\n\n<ul>\n\t<li>Qualifications of Technicians</li>\n\t<li>Submission of equipment being used to conduct load banking</li>\n</ul>\n\n<p>3.3&nbsp; None</p>\n\n<p>3.4 <u>Load Banking Procedure requirements</u>.</p>\n\n<p>3.4.1 <u>Load Banking equipment</u>.&nbsp; The Contractor shall provide all equipment required to support load banking both Main Propulsion Generators in single operation and parallel operations including (but not limited to), the following:</p>\n\n<p>3.4.1.1 <u>Load Bank(s)</u>. &nbsp;Load Bank meeting the characteristics of the Main Propulsion Generator</p>\n\n<p>3.4.1.2 <u>Wiring</u>. &nbsp;Electric wiring of proper sizing to hook up load bank to Main Propulsion Generator (approx. 150 ft).</p>\n\n<p>3.4.1.3 <u>Portable Particle Counter</u>.&nbsp; A particle counter capable of continuously measuring fluid contamination with output in NAS code.</p>\n\n<p>3.4.5 <u>COR notification</u>.&nbsp; The Contractor shall notify the Senior Chief Ian Duthie (MAT Supervsior) when load bank is connected to appropriate machinery.&nbsp;</p>\n\n<p>3.4.6 <u>Inspector witnessing and approval</u>.&nbsp; The Contractor shall ensure that the Coast Guard Inspector is present during all load banking procedures.&nbsp; The Contractor&rsquo;s will submit written report upon completion of load bank of all parameters at each interval.</p>\n\n<p>3.4.7 Requirements</p>\n\n<p>3.4.7.1 See below table of load banking loads and timelines</p>\n\n<p></p>\n\n<p>Engine Speed (RPMs)</p>\n\n<p>Time (min)</p>\n\n<p>Main Propulsion Generator Load</p>\n\n<p>Mechanical Checks</p>\n\n<p>300</p>\n\n<p>5</p>\n\n<p>No Load</p>\n\n<p>B</p>\n\n<p>350</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p>A,B</p>\n\n<p>450</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>550</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>650</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>720</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p>A, B</p>\n\n<p>720</p>\n\n<p>60 (1 hour)</p>\n\n<p>25%</p>\n\n<p>A, B</p>\n\n<p>720</p>\n\n<p>60 (1 hour)</p>\n\n<p>37.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>120 (2 hour)</p>\n\n<p>50%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>62.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>75%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>87.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>100%</p>\n\n<p>A,B</p>\n\n<p></p>\n\n<p></p>\n\n<p>3.4.7.2 Load banking Main Propulsion Generators in parallel.&nbsp; Load banking in parallel will be to support grooming of MPCMS by Affinity Power System.&nbsp; Groom will take approx.. 8 hours.</p>\n\n<p>3.4.7.3 Once all MDE break in period and MPCMS groom is completed contractor shall disconnect all equipment and return MPG back to original configuration.&nbsp;</p>\n\n<p>3.4.7.4 Wipe clean any surfaces contaminated by load bank equipment.&nbsp;</p>\n\n<p><strong>4.&nbsp; NOTES</strong></p>\n\n<p>4.1 <u>Equipment operation</u>. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests besides load bank.</p>\n\n<p>4.2 <u>Coast Guard can assist with loading and unloading equipment from trailers.</u></p>\n\n<p><u>4.3 Security Requirements</u></p>\n\n<p><u>4.3.1 Citizenship. Each individual employed under the contract shall be a citizen of the United States of America, or an alien who has been lawfully admitted for permanent residence as evidenced by a Permanent Resident Card (USCIS I-551). Any exceptions must be approved by the Coast Guard&rsquo;s Security Officer or designee.&nbsp; </u>Contractors shall identify in their proposals, the names and citizenship of all non-U.S. citizens proposed to work under the contract. Any additions or deletions of non-U.S. citizens after contract award shall also be reported to the Contracting Officer.</p>\n\n<p>4.3.2 <u>Identification</u>. In accordance with federal facility access control policies, all contractor personnel, including subcontractors and any individuals employed by the contractor who require access to the installation, must possess a valid form of identification that complies with the REAL ID Act of 2005. Access will be denied to any individual presenting non-compliant identification. It is the responsibility of the contractor to ensure that all personnel meet this requirement prior to arrival at the federal installation.</p>\n\n<p></p>\n\n<p><em>4.4 <u>Location</u>. USCGC Katmai Bay.&nbsp; 337 East Water Street, Sault Sainte Marie, MI 49783.</em></p>\n\n<p></p>\n\n<p><em>4.5. <u>Period of Performance</u>. Contract awardee will begin work within three (3) calendar days of award notification. Work will be completed within three (3) calendar days of the start date. </em></p>","text":"THIS IS TO BE AWARDED BASED OFF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.\n\nFAIRBANK MORSE MODEL 8 1/8 OPPOSED PISTON/WESTINGHOUSE MAIN PROPULSION GENERATOR BREAK IN LOAD BANKING\n\nSPECIFICATION FOR DOCKSIDE MAINTENANCE\n\nDeveloped By: IBCT Product Line\n\n(Rev-0, 27 Feb 2025)\n\nTABLE OF CONTENTS\n\nRevisions Record. iii\n\nConsolidated List of References. iv\n\nConsolidated List of Government-furnished Property. v\n\nConsolidated List of Critical Inspection Items. vi\n\nGeneral Requirements. 8\n\nWORK ITEM 1: Main Diesel Engine (MDE, Hot Lube Oil Flush…………………...………………….16\n\nRevisions Record\n\nThis page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.\n\nDATE\n\nREV#\n\nWORK ITEM#\n\nCHANGES MADE\n\nNOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.\n\nConsolidated List of References\n\nThe below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.\n\nAll Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:\n\n• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm\n\n• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp\n\n• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov\n\nThe Government is aware of the following internet web links where contractors may procure commercial specifications:\n\n• American Welding Society (AWS): http://www.awspubs.com/index.php\n\n• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/\n\n• NFPA: http://www.nfpa.org\n\n• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes & Details\n\nCoast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement\n\nCoast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement\n\nCOAST GUARD PUBLICATIONS\n\nCoast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nCoast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine – Model 38D8-1/8\n\nCoast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation\n\nCoast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment\n\nSurface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators & Motors\n\nOTHER REFERENCES\n\nNone\n\nConsolidated List of Government-furnished Property\n\nThe following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.\n\nNone\n\nConsolidated List of Critical Inspection Items\n\nThe following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):\n\nNone\n\n23300_SSDG #1 and #2Overhl_0819_IBCT\n\nGeneral Requirements\n\n1. SCOPE\n\n1.1 Intent. The work item describes the requirement for the contractor to conduct load bank on #1 Main Propulsion Generator and #2 Main Propulsion Generator to allow for the proper breaking in of #1 Main Diesel Engine and #2 Main Diesel Engine, post Center Section Overhaul and balance both propulsion generators. Main Propulsion Generator is Westinghouse 1000KW propulsion generator (Prop Gen)\n\nTable 1. Engine(s) to Fl\n\nEngine #\n\nManufacturer\n\nCharacteristics\n\nSerial #\n\n#1 Main Propulsion Generator\n\nWestinghouse\n\n1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles\n\nN/A\n\n#2 Main Propulsion Generator\n\nWestinghouse\n\n1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles\n\nN/A\n\n1.2 Government-furnished property.\n\nNone\n\n2. REFERENCES\n\nCoast Guard Drawings\n\nCoast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes & Details\n\nCoast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement\n\nCoast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement\n\nCoast Guard Publications\n\nCoast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nCoast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine – Model 38D8-1/8\n\nCoast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation\n\nCoast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment\n\nSurface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators & Motors\n\nOther References\n\nNone\n\nREQUIREMENTS\n\n3.1 General.\n\n3.1.1 CIR.\n\nNone.\n\n3.1.2 Tech Rep. The Contractor must provide the services of a qualified technician, who is familiar with load banking equipment including all equipment set up\n\n3.1.2.1 Removed.\n\n3.1.2.2 Removed.\n\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).\n\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:\n\n• Deck plates.\n\n• Deck framing.\n\n• Piping.\n\n• Handrails.\n\n• Electrical wiring and cables/cableways.\n\n• Miscellaneous machinery.\n\n3.1.5 Contamination prevention. The Contractor must take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.\n\nWARNING\n\nDo not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.\n\n3.2 Work plan. The Contractor shall provide a work plan to the Contracting Officer (KO), at the time of solicitation submission, which lists all procedures, plans, and equipment the Contractor will utilize in support of flushing requirements. At a minimum, the plan shall include the following:\n\n• Qualifications of Technicians\n\n• Submission of equipment being used to conduct load banking\n\n3.3 None\n\n3.4 Load Banking Procedure requirements.\n\n3.4.1 Load Banking equipment. The Contractor shall provide all equipment required to support load banking both Main Propulsion Generators in single operation and parallel operations including (but not limited to), the following:\n\n3.4.1.1 Load Bank(s). Load Bank meeting the characteristics of the Main Propulsion Generator\n\n3.4.1.2 Wiring. Electric wiring of proper sizing to hook up load bank to Main Propulsion Generator (approx. 150 ft).\n\n3.4.1.3 Portable Particle Counter. A particle counter capable of continuously measuring fluid contamination with output in NAS code.\n\n3.4.5 COR notification. The Contractor shall notify the Senior Chief Ian Duthie (MAT Supervsior) when load bank is connected to appropriate machinery.\n\n3.4.6 Inspector witnessing and approval. The Contractor shall ensure that the Coast Guard Inspector is present during all load banking procedures. The Contractor’s will submit written report upon completion of load bank of all parameters at each interval.\n\n3.4.7 Requirements\n\n3.4.7.1 See below table of load banking loads and timelines\n\nEngine Speed (RPMs)\n\nTime (min)\n\nMain Propulsion Generator Load\n\nMechanical Checks\n\n300\n\n5\n\nNo Load\n\nB\n\n350\n\n15\n\nNo Load\n\nA,B\n\n450\n\n15\n\nNo Load\n\n550\n\n15\n\nNo Load\n\n650\n\n15\n\nNo Load\n\n720\n\n15\n\nNo Load\n\nA, B\n\n720\n\n60 (1 hour)\n\n25%\n\nA, B\n\n720\n\n60 (1 hour)\n\n37.5%\n\nA\n\n720\n\n120 (2 hour)\n\n50%\n\nA\n\n720\n\n180 (3 hour)\n\n62.5%\n\nA\n\n720\n\n180 (3 hour)\n\n75%\n\nA\n\n720\n\n180 (3 hour)\n\n87.5%\n\nA\n\n720\n\n180 (3 hour)\n\n100%\n\nA,B\n\n3.4.7.2 Load banking Main Propulsion Generators in parallel. Load banking in parallel will be to support grooming of MPCMS by Affinity Power System. Groom will take approx.. 8 hours.\n\n3.4.7.3 Once all MDE break in period and MPCMS groom is completed contractor shall disconnect all equipment and return MPG back to original configuration.\n\n3.4.7.4 Wipe clean any surfaces contaminated by load bank equipment.\n\n4. NOTES\n\n4.1 Equipment operation. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests besides load bank.\n\n4.2 Coast Guard can assist with loading and unloading equipment from trailers.\n\n4.3 Security Requirements\n\n4.3.1 Citizenship. Each individual employed under the contract shall be a citizen of the United States of America, or an alien who has been lawfully admitted for permanent residence as evidenced by a Permanent Resident Card (USCIS I-551). Any exceptions must be approved by the Coast Guard’s Security Officer or designee. Contractors shall identify in their proposals, the names and citizenship of all non-U.S. citizens proposed to work under the contract. Any additions or deletions of non-U.S. citizens after contract award shall also be reported to the Contracting Officer.\n\n4.3.2 Identification. In accordance with federal facility access control policies, all contractor personnel, including subcontractors and any individuals employed by the contractor who require access to the installation, must possess a valid form of identification that complies with the REAL ID Act of 2005. Access will be denied to any individual presenting non-compliant identification. It is the responsibility of the contractor to ensure that all personnel meet this requirement prior to arrival at the federal installation.\n\n4.4 Location. USCGC Katmai Bay. 337 East Water Street, Sault Sainte Marie, MI 49783.\n\n4.5. Period of Performance. Contract awardee will begin work within three (3) calendar days of award notification. Work will be completed within three (3) calendar days of the start date.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"70Z085Q250012813","place_of_performance":{"zip":"49783","city":{"code":"0","name":"Sault Sainte Marie"},"state":{"code":"MI","name":"Michigan"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"J020"},{"dates":{"posted":"2025-05-12","posted_at":"2025-05-12T19:00:02.006Z","created_at":"2025-05-12T18:59:42.846Z","modified_at":"2025-05-20T03:56:03.496Z","response_deadline":{"raw":"2025-05-14T08:00:00-07:00","utc":"2025-05-14T15:00:00Z","date":"2025-05-14","time":"08:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a1fcc0bdf6fc493bb53d9f0ba2ac2ad8/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"CGC KATMAI BAY LOADBANKING TESTING","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-14","archive_type":"auto_custom"},"history":[{"index":4,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:58:39.751Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d3ad0f9a799c46dda71f8cb6e165e59d","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":2,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:00:02.006Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a1fcc0bdf6fc493bb53d9f0ba2ac2ad8","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":1,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-07T15:25:29.884Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64217bdf483349a9abcf4387d90f4372","solicitation_number":"70Z085Q250012813"}],"contacts":[{"name":"GEORGE, JERAMYAH","role":"primary","email":"JERAMYAH.W.GEORGE@USCG.MIL","phone":"5716102958"},{"name":"DONNA O'NEAL","role":"secondary","email":"Donna.J.O'Neal@uscg.mil","phone":"5103931145"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"a1fcc0bdf6fc493bb53d9f0ba2ac2ad8","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"64217bdf483349a9abcf4387d90f4372","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T07:40:52.291541599Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"53bf499e0452fb8071f0813fe7a346e7de8bcadbfb5ce6ad9c5d220fb31009ac","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T07:40:52.291541599Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong><em>THIS IS TO BE AWARDED BASED OFF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.</em></strong></p>\n\n<p>FAIRBANK MORSE MODEL 8 1/8 OPPOSED PISTON/WESTINGHOUSE MAIN PROPULSION GENERATOR BREAK IN LOAD BANKING</p>\n\n<p>SPECIFICATION FOR DOCKSIDE MAINTENANCE</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p>Developed By: IBCT Product Line</p>\n\n<p>(Rev-0, 27 Feb 2025)</p>\n\n<p></p>\n\n<p><strong>TABLE OF CONTENTS</strong></p>\n\n<p>Revisions Record. iii</p>\n\n<p>Consolidated List of References. iv</p>\n\n<p>Consolidated List of Government-furnished Property. v</p>\n\n<p>Consolidated List of Critical Inspection Items. vi</p>\n\n<p>General Requirements. 8</p>\n\n<p>WORK ITEM 1:&nbsp; Main Diesel Engine (MDE, Hot Lube Oil Flush&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;...&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;.16</p>\n\n<p></p>\n\n<p>Revisions Record</p>\n\n<p>This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.&nbsp; Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.</p>\n\n<p><strong>DATE</strong></p>\n\n<p><strong>REV#</strong></p>\n\n<p><strong>WORK ITEM#</strong></p>\n\n<p><strong>CHANGES MADE</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>NOTE :&nbsp; All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision.&nbsp; This revised specification is self-contained with all of the above listed changes incorporated.</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p>Consolidated List of References</p>\n\n<p>The below-listed documents form a part of this specification to the extent specified herein.&nbsp; Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.</p>\n\n<p>All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge.&nbsp;&nbsp;Other Government documents may be accessed &ndash; free of charge &ndash; as follows:</p>\n\n<ul>\n\t<li>MIL/DOD/CID Specifications:&nbsp; http://www.assistdocs.com/search/search_basic.cfm</li>\n\t<li>Commandant Instruction Manuals:&nbsp; http://www.uscg.mil/directives/default.asp</li>\n\t<li>Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::&nbsp; www.gpoaccess.gov</li>\n</ul>\n\n<p>The Government is aware of the following internet web links where contractors may procure commercial specifications:</p>\n\n<ul>\n\t<li>American Welding Society (AWS):&nbsp; http://www.awspubs.com/index.php</li>\n\t<li>ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards:&nbsp; http://www.techstreet.com/</li>\n\t<li>NFPA:&nbsp; http://www.nfpa.org</li>\n\t<li>SSPC Standards and pictorial guides:&nbsp; http://shopping.netsuite.com/sspcmarketplace<strong> </strong></li>\n</ul>\n\n<p><strong>COAST GUARD DRAWINGS</strong></p>\n\n<p>Coast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes &amp; Details</p>\n\n<p>Coast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement</p>\n\n<p>Coast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement</p>\n\n<p><strong>COAST GUARD PUBLICATIONS</strong></p>\n\n<p>Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements</p>\n\n<p>Coast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine &ndash; Model 38D8-1/8</p>\n\n<p>Coast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation</p>\n\n<p>Coast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment</p>\n\n<p>Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators &amp; Motors</p>\n\n<p><strong>OTHER REFERENCES</strong></p>\n\n<p>None</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p>Consolidated List of Government-furnished Property</p>\n\n<p>The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.</p>\n\n<p>None</p>\n\n<p>Consolidated List of Critical Inspection Items</p>\n\n<p>The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):</p>\n\n<p>None</p>\n\n<p></p>\n\n<p></p>\n\n<p><em>23300_SSDG #1 and #2Overhl_0819_IBCT</em></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>General Requirements</strong></p>\n\n<p><strong>1. SCOPE</strong></p>\n\n<p>1.1 <u>Intent</u>. The work item describes the requirement for the contractor to conduct load bank on #1 Main Propulsion Generator and #2 Main Propulsion Generator to allow for the proper breaking in of #1 Main Diesel Engine and #2 Main Diesel Engine, post Center Section Overhaul and balance both propulsion generators.&nbsp; Main Propulsion Generator is Westinghouse 1000KW propulsion generator (Prop Gen)</p>\n\n<p><strong>Table 1. Engine(s) to Fl</strong></p>\n\n<p>Engine #</p>\n\n<p>Manufacturer</p>\n\n<p></p>\n\n<p>Characteristics</p>\n\n<p>Serial #</p>\n\n<p>#1 Main Propulsion Generator</p>\n\n<p>Westinghouse</p>\n\n<p></p>\n\n<p>1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles</p>\n\n<p>N/A</p>\n\n<p>#2 Main Propulsion Generator</p>\n\n<p>Westinghouse</p>\n\n<p>1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles</p>\n\n<p>N/A</p>\n\n<p>&nbsp;1.2 <u>Government-furnished property</u>.</p>\n\n<p>None</p>\n\n<p><strong>2. REFERENCES</strong></p>\n\n<p><strong>Coast Guard Drawings</strong></p>\n\n<p>Coast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes &amp; Details</p>\n\n<p>Coast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement</p>\n\n<p>Coast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>Coast Guard Publications</strong></p>\n\n<p>Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements</p>\n\n<p>Coast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine &ndash; Model 38D8-1/8</p>\n\n<p>Coast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation</p>\n\n<p>Coast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment</p>\n\n<p>Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators &amp; Motors</p>\n\n<p></p>\n\n<p><strong>Other References</strong></p>\n\n<p>None</p>\n\n<p><strong>REQUIREMENTS</strong></p>\n\n<p>3.1 <u>General</u>.</p>\n\n<p>3.1.1 <u>CIR.</u></p>\n\n<p>None.</p>\n\n<p>3.1.2 <u>Tech Rep</u>.&nbsp; The Contractor must provide the services of a qualified technician, who is familiar with load banking equipment including all equipment set up</p>\n\n<p>3.1.2.1 <em>Removed.</em></p>\n\n<p>3.1.2.2 <em>Removed</em>.</p>\n\n<p>3.1.3 <u>Protective measures</u>.&nbsp; The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).</p>\n\n<p>3.1.4 <u>Interferences</u>.&nbsp; The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:</p>\n\n<ul>\n\t<li>Deck plates.</li>\n\t<li>Deck framing.</li>\n\t<li>Piping.</li>\n\t<li>Handrails.</li>\n\t<li>Electrical wiring and cables/cableways.</li>\n\t<li>Miscellaneous machinery.</li>\n</ul>\n\n<p>3.1.5 <u>Contamination prevention</u>.&nbsp; The Contractor must take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.</p>\n\n<p></p>\n\n<p><strong>WARNING</strong></p>\n\n<p><strong>Do not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.</strong></p>\n\n<p>3.2 &nbsp;<u>Work plan</u>. &nbsp;The Contractor shall provide a work plan to the Contracting Officer (KO), at the time of solicitation submission, which lists all procedures, plans, and equipment the Contractor will utilize in support of flushing requirements. At a minimum, the plan shall include the following:</p>\n\n<ul>\n\t<li>Qualifications of Technicians</li>\n\t<li>Submission of equipment being used to conduct load banking</li>\n</ul>\n\n<p>3.3&nbsp; None</p>\n\n<p>3.4 <u>Load Banking Procedure requirements</u>.</p>\n\n<p>3.4.1 <u>Load Banking equipment</u>.&nbsp; The Contractor shall provide all equipment required to support load banking both Main Propulsion Generators in single operation and parallel operations including (but not limited to), the following:</p>\n\n<p>3.4.1.1 <u>Load Bank(s)</u>. &nbsp;Load Bank meeting the characteristics of the Main Propulsion Generator</p>\n\n<p>3.4.1.2 <u>Wiring</u>. &nbsp;Electric wiring of proper sizing to hook up load bank to Main Propulsion Generator (approx. 150 ft).</p>\n\n<p>3.4.1.3 <u>Portable Particle Counter</u>.&nbsp; A particle counter capable of continuously measuring fluid contamination with output in NAS code.</p>\n\n<p>3.4.5 <u>COR notification</u>.&nbsp; The Contractor shall notify the Senior Chief Ian Duthie (MAT Supervsior) when load bank is connected to appropriate machinery.&nbsp;</p>\n\n<p>3.4.6 <u>Inspector witnessing and approval</u>.&nbsp; The Contractor shall ensure that the Coast Guard Inspector is present during all load banking procedures.&nbsp; The Contractor&rsquo;s will submit written report upon completion of load bank of all parameters at each interval.</p>\n\n<p>3.4.7 Requirements</p>\n\n<p>3.4.7.1 See below table of load banking loads and timelines</p>\n\n<p></p>\n\n<p>Engine Speed (RPMs)</p>\n\n<p>Time (min)</p>\n\n<p>Main Propulsion Generator Load</p>\n\n<p>Mechanical Checks</p>\n\n<p>300</p>\n\n<p>5</p>\n\n<p>No Load</p>\n\n<p>B</p>\n\n<p>350</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p>A,B</p>\n\n<p>450</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>550</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>650</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>720</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p>A, B</p>\n\n<p>720</p>\n\n<p>60 (1 hour)</p>\n\n<p>25%</p>\n\n<p>A, B</p>\n\n<p>720</p>\n\n<p>60 (1 hour)</p>\n\n<p>37.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>120 (2 hour)</p>\n\n<p>50%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>62.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>75%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>87.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>100%</p>\n\n<p>A,B</p>\n\n<p></p>\n\n<p></p>\n\n<p>3.4.7.2 Load banking Main Propulsion Generators in parallel.&nbsp; Load banking in parallel will be to support grooming of MPCMS by Affinity Power System.&nbsp; Groom will take approx.. 8 hours.</p>\n\n<p>3.4.7.3 Once all MDE break in period and MPCMS groom is completed contractor shall disconnect all equipment and return MPG back to original configuration.&nbsp;</p>\n\n<p>3.4.7.4 Wipe clean any surfaces contaminated by load bank equipment.&nbsp;</p>\n\n<p><strong>4.&nbsp; NOTES</strong></p>\n\n<p>4.1 <u>Equipment operation</u>. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests besides load bank.</p>\n\n<p>4.2 <u>Coast Guard can assist with loading and unloading equipment from trailers.</u></p>\n\n<p><u>4.3 Security Requirements</u></p>\n\n<p><u>4.3.1 Citizenship. Each individual employed under the contract shall be a citizen of the United States of America, or an alien who has been lawfully admitted for permanent residence as evidenced by a Permanent Resident Card (USCIS I-551). Any exceptions must be approved by the Coast Guard&rsquo;s Security Officer or designee.&nbsp; </u>Contractors shall identify in their proposals, the names and citizenship of all non-U.S. citizens proposed to work under the contract. Any additions or deletions of non-U.S. citizens after contract award shall also be reported to the Contracting Officer.</p>\n\n<p>4.3.2 <u>Identification</u>. In accordance with federal facility access control policies, all contractor personnel, including subcontractors and any individuals employed by the contractor who require access to the installation, must possess a valid form of identification that complies with the REAL ID Act of 2005. Access will be denied to any individual presenting non-compliant identification. It is the responsibility of the contractor to ensure that all personnel meet this requirement prior to arrival at the federal installation.</p>\n\n<p></p>\n\n<p><em>4.4 <u>Location</u>. USCGC Katmai Bay.&nbsp; 337 East Water Street, Sault Sainte Marie, MI 49783.</em></p>\n\n<p></p>\n\n<p><em>4.5. <u>Period of Performance</u>. Contract awardee will begin work within three (3) calendar days of award notification. Work will be completed within three (3) calendar days of the start date. </em></p>","text":"THIS IS TO BE AWARDED BASED OFF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.\n\nFAIRBANK MORSE MODEL 8 1/8 OPPOSED PISTON/WESTINGHOUSE MAIN PROPULSION GENERATOR BREAK IN LOAD BANKING\n\nSPECIFICATION FOR DOCKSIDE MAINTENANCE\n\nDeveloped By: IBCT Product Line\n\n(Rev-0, 27 Feb 2025)\n\nTABLE OF CONTENTS\n\nRevisions Record. iii\n\nConsolidated List of References. iv\n\nConsolidated List of Government-furnished Property. v\n\nConsolidated List of Critical Inspection Items. vi\n\nGeneral Requirements. 8\n\nWORK ITEM 1: Main Diesel Engine (MDE, Hot Lube Oil Flush…………………...………………….16\n\nRevisions Record\n\nThis page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.\n\nDATE\n\nREV#\n\nWORK ITEM#\n\nCHANGES MADE\n\nNOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.\n\nConsolidated List of References\n\nThe below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.\n\nAll Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:\n\n• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm\n\n• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp\n\n• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov\n\nThe Government is aware of the following internet web links where contractors may procure commercial specifications:\n\n• American Welding Society (AWS): http://www.awspubs.com/index.php\n\n• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/\n\n• NFPA: http://www.nfpa.org\n\n• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes & Details\n\nCoast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement\n\nCoast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement\n\nCOAST GUARD PUBLICATIONS\n\nCoast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nCoast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine – Model 38D8-1/8\n\nCoast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation\n\nCoast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment\n\nSurface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators & Motors\n\nOTHER REFERENCES\n\nNone\n\nConsolidated List of Government-furnished Property\n\nThe following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.\n\nNone\n\nConsolidated List of Critical Inspection Items\n\nThe following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):\n\nNone\n\n23300_SSDG #1 and #2Overhl_0819_IBCT\n\nGeneral Requirements\n\n1. SCOPE\n\n1.1 Intent. The work item describes the requirement for the contractor to conduct load bank on #1 Main Propulsion Generator and #2 Main Propulsion Generator to allow for the proper breaking in of #1 Main Diesel Engine and #2 Main Diesel Engine, post Center Section Overhaul and balance both propulsion generators. Main Propulsion Generator is Westinghouse 1000KW propulsion generator (Prop Gen)\n\nTable 1. Engine(s) to Fl\n\nEngine #\n\nManufacturer\n\nCharacteristics\n\nSerial #\n\n#1 Main Propulsion Generator\n\nWestinghouse\n\n1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles\n\nN/A\n\n#2 Main Propulsion Generator\n\nWestinghouse\n\n1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles\n\nN/A\n\n1.2 Government-furnished property.\n\nNone\n\n2. REFERENCES\n\nCoast Guard Drawings\n\nCoast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes & Details\n\nCoast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement\n\nCoast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement\n\nCoast Guard Publications\n\nCoast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nCoast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine – Model 38D8-1/8\n\nCoast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation\n\nCoast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment\n\nSurface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators & Motors\n\nOther References\n\nNone\n\nREQUIREMENTS\n\n3.1 General.\n\n3.1.1 CIR.\n\nNone.\n\n3.1.2 Tech Rep. The Contractor must provide the services of a qualified technician, who is familiar with load banking equipment including all equipment set up\n\n3.1.2.1 Removed.\n\n3.1.2.2 Removed.\n\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).\n\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:\n\n• Deck plates.\n\n• Deck framing.\n\n• Piping.\n\n• Handrails.\n\n• Electrical wiring and cables/cableways.\n\n• Miscellaneous machinery.\n\n3.1.5 Contamination prevention. The Contractor must take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.\n\nWARNING\n\nDo not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.\n\n3.2 Work plan. The Contractor shall provide a work plan to the Contracting Officer (KO), at the time of solicitation submission, which lists all procedures, plans, and equipment the Contractor will utilize in support of flushing requirements. At a minimum, the plan shall include the following:\n\n• Qualifications of Technicians\n\n• Submission of equipment being used to conduct load banking\n\n3.3 None\n\n3.4 Load Banking Procedure requirements.\n\n3.4.1 Load Banking equipment. The Contractor shall provide all equipment required to support load banking both Main Propulsion Generators in single operation and parallel operations including (but not limited to), the following:\n\n3.4.1.1 Load Bank(s). Load Bank meeting the characteristics of the Main Propulsion Generator\n\n3.4.1.2 Wiring. Electric wiring of proper sizing to hook up load bank to Main Propulsion Generator (approx. 150 ft).\n\n3.4.1.3 Portable Particle Counter. A particle counter capable of continuously measuring fluid contamination with output in NAS code.\n\n3.4.5 COR notification. The Contractor shall notify the Senior Chief Ian Duthie (MAT Supervsior) when load bank is connected to appropriate machinery.\n\n3.4.6 Inspector witnessing and approval. The Contractor shall ensure that the Coast Guard Inspector is present during all load banking procedures. The Contractor’s will submit written report upon completion of load bank of all parameters at each interval.\n\n3.4.7 Requirements\n\n3.4.7.1 See below table of load banking loads and timelines\n\nEngine Speed (RPMs)\n\nTime (min)\n\nMain Propulsion Generator Load\n\nMechanical Checks\n\n300\n\n5\n\nNo Load\n\nB\n\n350\n\n15\n\nNo Load\n\nA,B\n\n450\n\n15\n\nNo Load\n\n550\n\n15\n\nNo Load\n\n650\n\n15\n\nNo Load\n\n720\n\n15\n\nNo Load\n\nA, B\n\n720\n\n60 (1 hour)\n\n25%\n\nA, B\n\n720\n\n60 (1 hour)\n\n37.5%\n\nA\n\n720\n\n120 (2 hour)\n\n50%\n\nA\n\n720\n\n180 (3 hour)\n\n62.5%\n\nA\n\n720\n\n180 (3 hour)\n\n75%\n\nA\n\n720\n\n180 (3 hour)\n\n87.5%\n\nA\n\n720\n\n180 (3 hour)\n\n100%\n\nA,B\n\n3.4.7.2 Load banking Main Propulsion Generators in parallel. Load banking in parallel will be to support grooming of MPCMS by Affinity Power System. Groom will take approx.. 8 hours.\n\n3.4.7.3 Once all MDE break in period and MPCMS groom is completed contractor shall disconnect all equipment and return MPG back to original configuration.\n\n3.4.7.4 Wipe clean any surfaces contaminated by load bank equipment.\n\n4. NOTES\n\n4.1 Equipment operation. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests besides load bank.\n\n4.2 Coast Guard can assist with loading and unloading equipment from trailers.\n\n4.3 Security Requirements\n\n4.3.1 Citizenship. Each individual employed under the contract shall be a citizen of the United States of America, or an alien who has been lawfully admitted for permanent residence as evidenced by a Permanent Resident Card (USCIS I-551). Any exceptions must be approved by the Coast Guard’s Security Officer or designee. Contractors shall identify in their proposals, the names and citizenship of all non-U.S. citizens proposed to work under the contract. Any additions or deletions of non-U.S. citizens after contract award shall also be reported to the Contracting Officer.\n\n4.3.2 Identification. In accordance with federal facility access control policies, all contractor personnel, including subcontractors and any individuals employed by the contractor who require access to the installation, must possess a valid form of identification that complies with the REAL ID Act of 2005. Access will be denied to any individual presenting non-compliant identification. It is the responsibility of the contractor to ensure that all personnel meet this requirement prior to arrival at the federal installation.\n\n4.4 Location. USCGC Katmai Bay. 337 East Water Street, Sault Sainte Marie, MI 49783.\n\n4.5. Period of Performance. Contract awardee will begin work within three (3) calendar days of award notification. Work will be completed within three (3) calendar days of the start date.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"70Z085Q250012813","place_of_performance":{"zip":"49783","city":{"code":"0","name":"Sault Sainte Marie"},"state":{"code":"MI","name":"Michigan"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"J020"},{"dates":{"posted":"2025-05-14","posted_at":"2025-05-14T17:58:39.751Z","created_at":"2025-05-14T17:58:10.084Z","modified_at":"2025-05-20T03:56:03.496Z","response_deadline":{"raw":"2025-05-19T08:00:00-07:00","utc":"2025-05-19T15:00:00Z","date":"2025-05-19","time":"08:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d3ad0f9a799c46dda71f8cb6e165e59d/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"CGC KATMAI BAY LOADBANKING TESTING","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-19","archive_type":"auto_custom"},"history":[{"index":4,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:58:39.751Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d3ad0f9a799c46dda71f8cb6e165e59d","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":2,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:00:02.006Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"a1fcc0bdf6fc493bb53d9f0ba2ac2ad8","solicitation_number":"70Z085Q250012813","parent_opportunity_id":"64217bdf483349a9abcf4387d90f4372"},{"index":1,"title":"CGC KATMAI BAY LOADBANKING TESTING","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-07T15:25:29.884Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64217bdf483349a9abcf4387d90f4372","solicitation_number":"70Z085Q250012813"}],"contacts":[{"name":"GEORGE, JERAMYAH","role":"primary","email":"JERAMYAH.W.GEORGE@USCG.MIL","phone":"5716102958"},{"name":"DONNA O'NEAL","role":"secondary","email":"Donna.J.O'Neal@uscg.mil","phone":"5103931145"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"d3ad0f9a799c46dda71f8cb6e165e59d","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"64217bdf483349a9abcf4387d90f4372","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T03:38:54.477599426Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"701a055cfa48be3219a5855e416f7ae1a5064fb91d3acb20f0bfcab9cee4ddcc","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T03:38:54.477599426Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong><em>THIS IS TO BE AWARDED BASED OFF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.</em></strong></p>\n\n<p>FAIRBANK MORSE MODEL 8 1/8 OPPOSED PISTON/WESTINGHOUSE MAIN PROPULSION GENERATOR BREAK IN LOAD BANKING</p>\n\n<p>SPECIFICATION FOR DOCKSIDE MAINTENANCE</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p>Developed By: IBCT Product Line</p>\n\n<p>(Rev-0, 27 Feb 2025)</p>\n\n<p></p>\n\n<p><strong>TABLE OF CONTENTS</strong></p>\n\n<p>Revisions Record. iii</p>\n\n<p>Consolidated List of References. iv</p>\n\n<p>Consolidated List of Government-furnished Property. v</p>\n\n<p>Consolidated List of Critical Inspection Items. vi</p>\n\n<p>General Requirements. 8</p>\n\n<p>WORK ITEM 1:&nbsp; Main Diesel Engine (MDE, Hot Lube Oil Flush&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;...&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;.16</p>\n\n<p></p>\n\n<p>Revisions Record</p>\n\n<p>This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.&nbsp; Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.</p>\n\n<p><strong>DATE</strong></p>\n\n<p><strong>REV#</strong></p>\n\n<p><strong>WORK ITEM#</strong></p>\n\n<p><strong>CHANGES MADE</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>NOTE :&nbsp; All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision.&nbsp; This revised specification is self-contained with all of the above listed changes incorporated.</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p>Consolidated List of References</p>\n\n<p>The below-listed documents form a part of this specification to the extent specified herein.&nbsp; Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.</p>\n\n<p>All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge.&nbsp;&nbsp;Other Government documents may be accessed &ndash; free of charge &ndash; as follows:</p>\n\n<ul>\n\t<li>MIL/DOD/CID Specifications:&nbsp; http://www.assistdocs.com/search/search_basic.cfm</li>\n\t<li>Commandant Instruction Manuals:&nbsp; http://www.uscg.mil/directives/default.asp</li>\n\t<li>Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::&nbsp; www.gpoaccess.gov</li>\n</ul>\n\n<p>The Government is aware of the following internet web links where contractors may procure commercial specifications:</p>\n\n<ul>\n\t<li>American Welding Society (AWS):&nbsp; http://www.awspubs.com/index.php</li>\n\t<li>ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards:&nbsp; http://www.techstreet.com/</li>\n\t<li>NFPA:&nbsp; http://www.nfpa.org</li>\n\t<li>SSPC Standards and pictorial guides:&nbsp; http://shopping.netsuite.com/sspcmarketplace<strong> </strong></li>\n</ul>\n\n<p><strong>COAST GUARD DRAWINGS</strong></p>\n\n<p>Coast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes &amp; Details</p>\n\n<p>Coast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement</p>\n\n<p>Coast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement</p>\n\n<p><strong>COAST GUARD PUBLICATIONS</strong></p>\n\n<p>Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements</p>\n\n<p>Coast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine &ndash; Model 38D8-1/8</p>\n\n<p>Coast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation</p>\n\n<p>Coast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment</p>\n\n<p>Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators &amp; Motors</p>\n\n<p><strong>OTHER REFERENCES</strong></p>\n\n<p>None</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p>Consolidated List of Government-furnished Property</p>\n\n<p>The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.</p>\n\n<p>None</p>\n\n<p>Consolidated List of Critical Inspection Items</p>\n\n<p>The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):</p>\n\n<p>None</p>\n\n<p></p>\n\n<p></p>\n\n<p><em>23300_SSDG #1 and #2Overhl_0819_IBCT</em></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>General Requirements</strong></p>\n\n<p><strong>1. SCOPE</strong></p>\n\n<p>1.1 <u>Intent</u>. The work item describes the requirement for the contractor to conduct load bank on #1 Main Propulsion Generator and #2 Main Propulsion Generator to allow for the proper breaking in of #1 Main Diesel Engine and #2 Main Diesel Engine, post Center Section Overhaul and balance both propulsion generators.&nbsp; Main Propulsion Generator is Westinghouse 1000KW propulsion generator (Prop Gen)</p>\n\n<p><strong>Table 1. Engine(s) to Fl</strong></p>\n\n<p>Engine #</p>\n\n<p>Manufacturer</p>\n\n<p></p>\n\n<p>Characteristics</p>\n\n<p>Serial #</p>\n\n<p>#1 Main Propulsion Generator</p>\n\n<p>Westinghouse</p>\n\n<p></p>\n\n<p>1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles</p>\n\n<p>N/A</p>\n\n<p>#2 Main Propulsion Generator</p>\n\n<p>Westinghouse</p>\n\n<p>1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles</p>\n\n<p>N/A</p>\n\n<p>&nbsp;1.2 <u>Government-furnished property</u>.</p>\n\n<p>None</p>\n\n<p><strong>2. REFERENCES</strong></p>\n\n<p><strong>Coast Guard Drawings</strong></p>\n\n<p>Coast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes &amp; Details</p>\n\n<p>Coast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement</p>\n\n<p>Coast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>Coast Guard Publications</strong></p>\n\n<p>Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements</p>\n\n<p>Coast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine &ndash; Model 38D8-1/8</p>\n\n<p>Coast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation</p>\n\n<p>Coast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment</p>\n\n<p>Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators &amp; Motors</p>\n\n<p></p>\n\n<p><strong>Other References</strong></p>\n\n<p>None</p>\n\n<p><strong>REQUIREMENTS</strong></p>\n\n<p>3.1 <u>General</u>.</p>\n\n<p>3.1.1 <u>CIR.</u></p>\n\n<p>None.</p>\n\n<p>3.1.2 <u>Tech Rep</u>.&nbsp; The Contractor must provide the services of a qualified technician, who is familiar with load banking equipment including all equipment set up</p>\n\n<p>3.1.2.1 <em>Removed.</em></p>\n\n<p>3.1.2.2 <em>Removed</em>.</p>\n\n<p>3.1.3 <u>Protective measures</u>.&nbsp; The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).</p>\n\n<p>3.1.4 <u>Interferences</u>.&nbsp; The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:</p>\n\n<ul>\n\t<li>Deck plates.</li>\n\t<li>Deck framing.</li>\n\t<li>Piping.</li>\n\t<li>Handrails.</li>\n\t<li>Electrical wiring and cables/cableways.</li>\n\t<li>Miscellaneous machinery.</li>\n</ul>\n\n<p>3.1.5 <u>Contamination prevention</u>.&nbsp; The Contractor must take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.</p>\n\n<p></p>\n\n<p><strong>WARNING</strong></p>\n\n<p><strong>Do not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.</strong></p>\n\n<p>3.2 &nbsp;<u>Work plan</u>. &nbsp;The Contractor shall provide a work plan to the Contracting Officer (KO), at the time of solicitation submission, which lists all procedures, plans, and equipment the Contractor will utilize in support of flushing requirements. At a minimum, the plan shall include the following:</p>\n\n<ul>\n\t<li>Qualifications of Technicians</li>\n\t<li>Submission of equipment being used to conduct load banking</li>\n</ul>\n\n<p>3.3&nbsp; None</p>\n\n<p>3.4 <u>Load Banking Procedure requirements</u>.</p>\n\n<p>3.4.1 <u>Load Banking equipment</u>.&nbsp; The Contractor shall provide all equipment required to support load banking both Main Propulsion Generators in single operation and parallel operations including (but not limited to), the following:</p>\n\n<p>3.4.1.1 <u>Load Bank(s)</u>. &nbsp;Load Bank meeting the characteristics of the Main Propulsion Generator</p>\n\n<p>3.4.1.2 <u>Wiring</u>. &nbsp;Electric wiring of proper sizing to hook up load bank to Main Propulsion Generator (approx. 150 ft).</p>\n\n<p>3.4.1.3 <u>Portable Particle Counter</u>.&nbsp; A particle counter capable of continuously measuring fluid contamination with output in NAS code.</p>\n\n<p>3.4.5 <u>COR notification</u>.&nbsp; The Contractor shall notify the Senior Chief Ian Duthie (MAT Supervsior) when load bank is connected to appropriate machinery.&nbsp;</p>\n\n<p>3.4.6 <u>Inspector witnessing and approval</u>.&nbsp; The Contractor shall ensure that the Coast Guard Inspector is present during all load banking procedures.&nbsp; The Contractor&rsquo;s will submit written report upon completion of load bank of all parameters at each interval.</p>\n\n<p>3.4.7 Requirements</p>\n\n<p>3.4.7.1 See below table of load banking loads and timelines</p>\n\n<p></p>\n\n<p>Engine Speed (RPMs)</p>\n\n<p>Time (min)</p>\n\n<p>Main Propulsion Generator Load</p>\n\n<p>Mechanical Checks</p>\n\n<p>300</p>\n\n<p>5</p>\n\n<p>No Load</p>\n\n<p>B</p>\n\n<p>350</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p>A,B</p>\n\n<p>450</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>550</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>650</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>720</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p>A, B</p>\n\n<p>720</p>\n\n<p>60 (1 hour)</p>\n\n<p>25%</p>\n\n<p>A, B</p>\n\n<p>720</p>\n\n<p>60 (1 hour)</p>\n\n<p>37.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>120 (2 hour)</p>\n\n<p>50%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>62.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>75%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>87.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>100%</p>\n\n<p>A,B</p>\n\n<p></p>\n\n<p></p>\n\n<p>3.4.7.2 Load banking Main Propulsion Generators in parallel.&nbsp; Load banking in parallel will be to support grooming of MPCMS by Affinity Power System.&nbsp; Groom will take approx.. 8 hours.</p>\n\n<p>3.4.7.3 Once all MDE break in period and MPCMS groom is completed contractor shall disconnect all equipment and return MPG back to original configuration.&nbsp;</p>\n\n<p>3.4.7.4 Wipe clean any surfaces contaminated by load bank equipment.&nbsp;</p>\n\n<p><strong>4.&nbsp; NOTES</strong></p>\n\n<p>4.1 <u>Equipment operation</u>. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests besides load bank.</p>\n\n<p>4.2 <u>Coast Guard can assist with loading and unloading equipment from trailers.</u></p>\n\n<p><u>4.3 Security Requirements</u></p>\n\n<p><u>4.3.1 Citizenship. Each individual employed under the contract shall be a citizen of the United States of America, or an alien who has been lawfully admitted for permanent residence as evidenced by a Permanent Resident Card (USCIS I-551). Any exceptions must be approved by the Coast Guard&rsquo;s Security Officer or designee.&nbsp; </u>Contractors shall identify in their proposals, the names and citizenship of all non-U.S. citizens proposed to work under the contract. Any additions or deletions of non-U.S. citizens after contract award shall also be reported to the Contracting Officer.</p>\n\n<p>4.3.2 <u>Identification</u>. In accordance with federal facility access control policies, all contractor personnel, including subcontractors and any individuals employed by the contractor who require access to the installation, must possess a valid form of identification that complies with the REAL ID Act of 2005. Access will be denied to any individual presenting non-compliant identification. It is the responsibility of the contractor to ensure that all personnel meet this requirement prior to arrival at the federal installation.</p>\n\n<p></p>\n\n<p><em>4.4 <u>Location</u>. USCGC Katmai Bay.&nbsp; 337 East Water Street, Sault Sainte Marie, MI 49783.</em></p>\n\n<p></p>\n\n<p><em>4.5. <u>Period of Performance</u>. Contract awardee will begin work within three (3) calendar days of award notification. Work will be completed within three (3) calendar days of the start date. </em></p>","text":"THIS IS TO BE AWARDED BASED OFF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.\n\nFAIRBANK MORSE MODEL 8 1/8 OPPOSED PISTON/WESTINGHOUSE MAIN PROPULSION GENERATOR BREAK IN LOAD BANKING\n\nSPECIFICATION FOR DOCKSIDE MAINTENANCE\n\nDeveloped By: IBCT Product Line\n\n(Rev-0, 27 Feb 2025)\n\nTABLE OF CONTENTS\n\nRevisions Record. iii\n\nConsolidated List of References. iv\n\nConsolidated List of Government-furnished Property. v\n\nConsolidated List of Critical Inspection Items. vi\n\nGeneral Requirements. 8\n\nWORK ITEM 1: Main Diesel Engine (MDE, Hot Lube Oil Flush…………………...………………….16\n\nRevisions Record\n\nThis page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.\n\nDATE\n\nREV#\n\nWORK ITEM#\n\nCHANGES MADE\n\nNOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.\n\nConsolidated List of References\n\nThe below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.\n\nAll Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:\n\n• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm\n\n• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp\n\n• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov\n\nThe Government is aware of the following internet web links where contractors may procure commercial specifications:\n\n• American Welding Society (AWS): http://www.awspubs.com/index.php\n\n• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/\n\n• NFPA: http://www.nfpa.org\n\n• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes & Details\n\nCoast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement\n\nCoast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement\n\nCOAST GUARD PUBLICATIONS\n\nCoast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nCoast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine – Model 38D8-1/8\n\nCoast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation\n\nCoast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment\n\nSurface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators & Motors\n\nOTHER REFERENCES\n\nNone\n\nConsolidated List of Government-furnished Property\n\nThe following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.\n\nNone\n\nConsolidated List of Critical Inspection Items\n\nThe following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):\n\nNone\n\n23300_SSDG #1 and #2Overhl_0819_IBCT\n\nGeneral Requirements\n\n1. SCOPE\n\n1.1 Intent. The work item describes the requirement for the contractor to conduct load bank on #1 Main Propulsion Generator and #2 Main Propulsion Generator to allow for the proper breaking in of #1 Main Diesel Engine and #2 Main Diesel Engine, post Center Section Overhaul and balance both propulsion generators. Main Propulsion Generator is Westinghouse 1000KW propulsion generator (Prop Gen)\n\nTable 1. Engine(s) to Fl\n\nEngine #\n\nManufacturer\n\nCharacteristics\n\nSerial #\n\n#1 Main Propulsion Generator\n\nWestinghouse\n\n1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles\n\nN/A\n\n#2 Main Propulsion Generator\n\nWestinghouse\n\n1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles\n\nN/A\n\n1.2 Government-furnished property.\n\nNone\n\n2. REFERENCES\n\nCoast Guard Drawings\n\nCoast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes & Details\n\nCoast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement\n\nCoast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement\n\nCoast Guard Publications\n\nCoast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nCoast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine – Model 38D8-1/8\n\nCoast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation\n\nCoast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment\n\nSurface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators & Motors\n\nOther References\n\nNone\n\nREQUIREMENTS\n\n3.1 General.\n\n3.1.1 CIR.\n\nNone.\n\n3.1.2 Tech Rep. The Contractor must provide the services of a qualified technician, who is familiar with load banking equipment including all equipment set up\n\n3.1.2.1 Removed.\n\n3.1.2.2 Removed.\n\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).\n\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:\n\n• Deck plates.\n\n• Deck framing.\n\n• Piping.\n\n• Handrails.\n\n• Electrical wiring and cables/cableways.\n\n• Miscellaneous machinery.\n\n3.1.5 Contamination prevention. The Contractor must take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.\n\nWARNING\n\nDo not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.\n\n3.2 Work plan. The Contractor shall provide a work plan to the Contracting Officer (KO), at the time of solicitation submission, which lists all procedures, plans, and equipment the Contractor will utilize in support of flushing requirements. At a minimum, the plan shall include the following:\n\n• Qualifications of Technicians\n\n• Submission of equipment being used to conduct load banking\n\n3.3 None\n\n3.4 Load Banking Procedure requirements.\n\n3.4.1 Load Banking equipment. The Contractor shall provide all equipment required to support load banking both Main Propulsion Generators in single operation and parallel operations including (but not limited to), the following:\n\n3.4.1.1 Load Bank(s). Load Bank meeting the characteristics of the Main Propulsion Generator\n\n3.4.1.2 Wiring. Electric wiring of proper sizing to hook up load bank to Main Propulsion Generator (approx. 150 ft).\n\n3.4.1.3 Portable Particle Counter. A particle counter capable of continuously measuring fluid contamination with output in NAS code.\n\n3.4.5 COR notification. The Contractor shall notify the Senior Chief Ian Duthie (MAT Supervsior) when load bank is connected to appropriate machinery.\n\n3.4.6 Inspector witnessing and approval. The Contractor shall ensure that the Coast Guard Inspector is present during all load banking procedures. The Contractor’s will submit written report upon completion of load bank of all parameters at each interval.\n\n3.4.7 Requirements\n\n3.4.7.1 See below table of load banking loads and timelines\n\nEngine Speed (RPMs)\n\nTime (min)\n\nMain Propulsion Generator Load\n\nMechanical Checks\n\n300\n\n5\n\nNo Load\n\nB\n\n350\n\n15\n\nNo Load\n\nA,B\n\n450\n\n15\n\nNo Load\n\n550\n\n15\n\nNo Load\n\n650\n\n15\n\nNo Load\n\n720\n\n15\n\nNo Load\n\nA, B\n\n720\n\n60 (1 hour)\n\n25%\n\nA, B\n\n720\n\n60 (1 hour)\n\n37.5%\n\nA\n\n720\n\n120 (2 hour)\n\n50%\n\nA\n\n720\n\n180 (3 hour)\n\n62.5%\n\nA\n\n720\n\n180 (3 hour)\n\n75%\n\nA\n\n720\n\n180 (3 hour)\n\n87.5%\n\nA\n\n720\n\n180 (3 hour)\n\n100%\n\nA,B\n\n3.4.7.2 Load banking Main Propulsion Generators in parallel. Load banking in parallel will be to support grooming of MPCMS by Affinity Power System. Groom will take approx.. 8 hours.\n\n3.4.7.3 Once all MDE break in period and MPCMS groom is completed contractor shall disconnect all equipment and return MPG back to original configuration.\n\n3.4.7.4 Wipe clean any surfaces contaminated by load bank equipment.\n\n4. NOTES\n\n4.1 Equipment operation. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests besides load bank.\n\n4.2 Coast Guard can assist with loading and unloading equipment from trailers.\n\n4.3 Security Requirements\n\n4.3.1 Citizenship. Each individual employed under the contract shall be a citizen of the United States of America, or an alien who has been lawfully admitted for permanent residence as evidenced by a Permanent Resident Card (USCIS I-551). Any exceptions must be approved by the Coast Guard’s Security Officer or designee. Contractors shall identify in their proposals, the names and citizenship of all non-U.S. citizens proposed to work under the contract. Any additions or deletions of non-U.S. citizens after contract award shall also be reported to the Contracting Officer.\n\n4.3.2 Identification. In accordance with federal facility access control policies, all contractor personnel, including subcontractors and any individuals employed by the contractor who require access to the installation, must possess a valid form of identification that complies with the REAL ID Act of 2005. Access will be denied to any individual presenting non-compliant identification. It is the responsibility of the contractor to ensure that all personnel meet this requirement prior to arrival at the federal installation.\n\n4.4 Location. USCGC Katmai Bay. 337 East Water Street, Sault Sainte Marie, MI 49783.\n\n4.5. Period of Performance. Contract awardee will begin work within three (3) calendar days of award notification. Work will be completed within three (3) calendar days of the start date.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"70Z085Q250012813","place_of_performance":{"zip":"49783","city":{"code":"0","name":"Sault Sainte Marie"},"state":{"code":"MI","name":"Michigan"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"J020"}],"due_at":"2025-05-19T15:00:00Z","due_date":"2025-05-19","closes_at":"2025-05-19T15:00:00Z","awardable":true,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","state":"MI","county":"26033","county_name":"Chippewa County","city":"2671740","city_name":"Sault Ste. Marie","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-15T04:08:10.553974Z","principal_notice_id":"d3ad0f9a799c46dda71f8cb6e165e59d","description":{"text":"THIS IS TO BE AWARDED BASED OFF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.\n\nFAIRBANK MORSE MODEL 8 1/8 OPPOSED PISTON/WESTINGHOUSE MAIN PROPULSION GENERATOR BREAK IN LOAD BANKING\n\nSPECIFICATION FOR DOCKSIDE MAINTENANCE\n\nDeveloped By: IBCT Product Line\n\n(Rev-0, 27 Feb 2025)\n\nTABLE OF CONTENTS\n\nRevisions Record. iii\n\nConsolidated List of References. iv\n\nConsolidated List of Government-furnished Property. v\n\nConsolidated List of Critical Inspection Items. vi\n\nGeneral Requirements. 8\n\nWORK ITEM 1: Main Diesel Engine (MDE, Hot Lube Oil Flush…………………...………………….16\n\nRevisions Record\n\nThis page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.\n\nDATE\n\nREV#\n\nWORK ITEM#\n\nCHANGES MADE\n\nNOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.\n\nConsolidated List of References\n\nThe below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.\n\nAll Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:\n\n• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm\n\n• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp\n\n• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov\n\nThe Government is aware of the following internet web links where contractors may procure commercial specifications:\n\n• American Welding Society (AWS): http://www.awspubs.com/index.php\n\n• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/\n\n• NFPA: http://www.nfpa.org\n\n• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes & Details\n\nCoast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement\n\nCoast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement\n\nCOAST GUARD PUBLICATIONS\n\nCoast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nCoast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine – Model 38D8-1/8\n\nCoast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation\n\nCoast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment\n\nSurface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators & Motors\n\nOTHER REFERENCES\n\nNone\n\nConsolidated List of Government-furnished Property\n\nThe following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.\n\nNone\n\nConsolidated List of Critical Inspection Items\n\nThe following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):\n\nNone\n\n23300_SSDG #1 and #2Overhl_0819_IBCT\n\nGeneral Requirements\n\n1. SCOPE\n\n1.1 Intent. The work item describes the requirement for the contractor to conduct load bank on #1 Main Propulsion Generator and #2 Main Propulsion Generator to allow for the proper breaking in of #1 Main Diesel Engine and #2 Main Diesel Engine, post Center Section Overhaul and balance both propulsion generators. Main Propulsion Generator is Westinghouse 1000KW propulsion generator (Prop Gen)\n\nTable 1. Engine(s) to Fl\n\nEngine #\n\nManufacturer\n\nCharacteristics\n\nSerial #\n\n#1 Main Propulsion Generator\n\nWestinghouse\n\n1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles\n\nN/A\n\n#2 Main Propulsion Generator\n\nWestinghouse\n\n1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles\n\nN/A\n\n1.2 Government-furnished property.\n\nNone\n\n2. REFERENCES\n\nCoast Guard Drawings\n\nCoast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes & Details\n\nCoast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement\n\nCoast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement\n\nCoast Guard Publications\n\nCoast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nCoast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine – Model 38D8-1/8\n\nCoast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation\n\nCoast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment\n\nSurface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators & Motors\n\nOther References\n\nNone\n\nREQUIREMENTS\n\n3.1 General.\n\n3.1.1 CIR.\n\nNone.\n\n3.1.2 Tech Rep. The Contractor must provide the services of a qualified technician, who is familiar with load banking equipment including all equipment set up\n\n3.1.2.1 Removed.\n\n3.1.2.2 Removed.\n\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).\n\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:\n\n• Deck plates.\n\n• Deck framing.\n\n• Piping.\n\n• Handrails.\n\n• Electrical wiring and cables/cableways.\n\n• Miscellaneous machinery.\n\n3.1.5 Contamination prevention. The Contractor must take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.\n\nWARNING\n\nDo not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.\n\n3.2 Work plan. The Contractor shall provide a work plan to the Contracting Officer (KO), at the time of solicitation submission, which lists all procedures, plans, and equipment the Contractor will utilize in support of flushing requirements. At a minimum, the plan shall include the following:\n\n• Qualifications of Technicians\n\n• Submission of equipment being used to conduct load banking\n\n3.3 None\n\n3.4 Load Banking Procedure requirements.\n\n3.4.1 Load Banking equipment. The Contractor shall provide all equipment required to support load banking both Main Propulsion Generators in single operation and parallel operations including (but not limited to), the following:\n\n3.4.1.1 Load Bank(s). Load Bank meeting the characteristics of the Main Propulsion Generator\n\n3.4.1.2 Wiring. Electric wiring of proper sizing to hook up load bank to Main Propulsion Generator (approx. 150 ft).\n\n3.4.1.3 Portable Particle Counter. A particle counter capable of continuously measuring fluid contamination with output in NAS code.\n\n3.4.5 COR notification. The Contractor shall notify the Senior Chief Ian Duthie (MAT Supervsior) when load bank is connected to appropriate machinery.\n\n3.4.6 Inspector witnessing and approval. The Contractor shall ensure that the Coast Guard Inspector is present during all load banking procedures. The Contractor’s will submit written report upon completion of load bank of all parameters at each interval.\n\n3.4.7 Requirements\n\n3.4.7.1 See below table of load banking loads and timelines\n\nEngine Speed (RPMs)\n\nTime (min)\n\nMain Propulsion Generator Load\n\nMechanical Checks\n\n300\n\n5\n\nNo Load\n\nB\n\n350\n\n15\n\nNo Load\n\nA,B\n\n450\n\n15\n\nNo Load\n\n550\n\n15\n\nNo Load\n\n650\n\n15\n\nNo Load\n\n720\n\n15\n\nNo Load\n\nA, B\n\n720\n\n60 (1 hour)\n\n25%\n\nA, B\n\n720\n\n60 (1 hour)\n\n37.5%\n\nA\n\n720\n\n120 (2 hour)\n\n50%\n\nA\n\n720\n\n180 (3 hour)\n\n62.5%\n\nA\n\n720\n\n180 (3 hour)\n\n75%\n\nA\n\n720\n\n180 (3 hour)\n\n87.5%\n\nA\n\n720\n\n180 (3 hour)\n\n100%\n\nA,B\n\n3.4.7.2 Load banking Main Propulsion Generators in parallel. Load banking in parallel will be to support grooming of MPCMS by Affinity Power System. Groom will take approx.. 8 hours.\n\n3.4.7.3 Once all MDE break in period and MPCMS groom is completed contractor shall disconnect all equipment and return MPG back to original configuration.\n\n3.4.7.4 Wipe clean any surfaces contaminated by load bank equipment.\n\n4. NOTES\n\n4.1 Equipment operation. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests besides load bank.\n\n4.2 Coast Guard can assist with loading and unloading equipment from trailers.\n\n4.3 Security Requirements\n\n4.3.1 Citizenship. Each individual employed under the contract shall be a citizen of the United States of America, or an alien who has been lawfully admitted for permanent residence as evidenced by a Permanent Resident Card (USCIS I-551). Any exceptions must be approved by the Coast Guard’s Security Officer or designee. Contractors shall identify in their proposals, the names and citizenship of all non-U.S. citizens proposed to work under the contract. Any additions or deletions of non-U.S. citizens after contract award shall also be reported to the Contracting Officer.\n\n4.3.2 Identification. In accordance with federal facility access control policies, all contractor personnel, including subcontractors and any individuals employed by the contractor who require access to the installation, must possess a valid form of identification that complies with the REAL ID Act of 2005. Access will be denied to any individual presenting non-compliant identification. It is the responsibility of the contractor to ensure that all personnel meet this requirement prior to arrival at the federal installation.\n\n4.4 Location. USCGC Katmai Bay. 337 East Water Street, Sault Sainte Marie, MI 49783.\n\n4.5. Period of Performance. Contract awardee will begin work within three (3) calendar days of award notification. Work will be completed within three (3) calendar days of the start date.","html":"<p><strong><em>THIS IS TO BE AWARDED BASED OFF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.</em></strong></p>\n\n<p>FAIRBANK MORSE MODEL 8 1/8 OPPOSED PISTON/WESTINGHOUSE MAIN PROPULSION GENERATOR BREAK IN LOAD BANKING</p>\n\n<p>SPECIFICATION FOR DOCKSIDE MAINTENANCE</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p>Developed By: IBCT Product Line</p>\n\n<p>(Rev-0, 27 Feb 2025)</p>\n\n<p></p>\n\n<p><strong>TABLE OF CONTENTS</strong></p>\n\n<p>Revisions Record. iii</p>\n\n<p>Consolidated List of References. iv</p>\n\n<p>Consolidated List of Government-furnished Property. v</p>\n\n<p>Consolidated List of Critical Inspection Items. vi</p>\n\n<p>General Requirements. 8</p>\n\n<p>WORK ITEM 1:&nbsp; Main Diesel Engine (MDE, Hot Lube Oil Flush&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;...&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;.16</p>\n\n<p></p>\n\n<p>Revisions Record</p>\n\n<p>This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.&nbsp; Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.</p>\n\n<p><strong>DATE</strong></p>\n\n<p><strong>REV#</strong></p>\n\n<p><strong>WORK ITEM#</strong></p>\n\n<p><strong>CHANGES MADE</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>NOTE :&nbsp; All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision.&nbsp; This revised specification is self-contained with all of the above listed changes incorporated.</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p>Consolidated List of References</p>\n\n<p>The below-listed documents form a part of this specification to the extent specified herein.&nbsp; Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.</p>\n\n<p>All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge.&nbsp;&nbsp;Other Government documents may be accessed &ndash; free of charge &ndash; as follows:</p>\n\n<ul>\n\t<li>MIL/DOD/CID Specifications:&nbsp; http://www.assistdocs.com/search/search_basic.cfm</li>\n\t<li>Commandant Instruction Manuals:&nbsp; http://www.uscg.mil/directives/default.asp</li>\n\t<li>Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::&nbsp; www.gpoaccess.gov</li>\n</ul>\n\n<p>The Government is aware of the following internet web links where contractors may procure commercial specifications:</p>\n\n<ul>\n\t<li>American Welding Society (AWS):&nbsp; http://www.awspubs.com/index.php</li>\n\t<li>ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards:&nbsp; http://www.techstreet.com/</li>\n\t<li>NFPA:&nbsp; http://www.nfpa.org</li>\n\t<li>SSPC Standards and pictorial guides:&nbsp; http://shopping.netsuite.com/sspcmarketplace<strong> </strong></li>\n</ul>\n\n<p><strong>COAST GUARD DRAWINGS</strong></p>\n\n<p>Coast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes &amp; Details</p>\n\n<p>Coast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement</p>\n\n<p>Coast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement</p>\n\n<p><strong>COAST GUARD PUBLICATIONS</strong></p>\n\n<p>Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements</p>\n\n<p>Coast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine &ndash; Model 38D8-1/8</p>\n\n<p>Coast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation</p>\n\n<p>Coast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment</p>\n\n<p>Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators &amp; Motors</p>\n\n<p><strong>OTHER REFERENCES</strong></p>\n\n<p>None</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p>Consolidated List of Government-furnished Property</p>\n\n<p>The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.</p>\n\n<p>None</p>\n\n<p>Consolidated List of Critical Inspection Items</p>\n\n<p>The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):</p>\n\n<p>None</p>\n\n<p></p>\n\n<p></p>\n\n<p><em>23300_SSDG #1 and #2Overhl_0819_IBCT</em></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>General Requirements</strong></p>\n\n<p><strong>1. SCOPE</strong></p>\n\n<p>1.1 <u>Intent</u>. The work item describes the requirement for the contractor to conduct load bank on #1 Main Propulsion Generator and #2 Main Propulsion Generator to allow for the proper breaking in of #1 Main Diesel Engine and #2 Main Diesel Engine, post Center Section Overhaul and balance both propulsion generators.&nbsp; Main Propulsion Generator is Westinghouse 1000KW propulsion generator (Prop Gen)</p>\n\n<p><strong>Table 1. Engine(s) to Fl</strong></p>\n\n<p>Engine #</p>\n\n<p>Manufacturer</p>\n\n<p></p>\n\n<p>Characteristics</p>\n\n<p>Serial #</p>\n\n<p>#1 Main Propulsion Generator</p>\n\n<p>Westinghouse</p>\n\n<p></p>\n\n<p>1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles</p>\n\n<p>N/A</p>\n\n<p>#2 Main Propulsion Generator</p>\n\n<p>Westinghouse</p>\n\n<p>1000KW, 900VDC, 1111Amps, 850 RPMs, 6 poles</p>\n\n<p>N/A</p>\n\n<p>&nbsp;1.2 <u>Government-furnished property</u>.</p>\n\n<p>None</p>\n\n<p><strong>2. REFERENCES</strong></p>\n\n<p><strong>Coast Guard Drawings</strong></p>\n\n<p>Coast Guard Drawing 140 WTGB 101-001, Rev -, Booklet of General Notes &amp; Details</p>\n\n<p>Coast Guard Drawing 140 WTGB 201-001, Rev B, Machinery Arrangement</p>\n\n<p>Coast Guard Drawing (DWG) 140-WTGB-201-001, Rev B, Machinery Arrangement</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>Coast Guard Publications</strong></p>\n\n<p>Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements</p>\n\n<p>Coast Guard Technical Publication (TP) 3473, SWBS 233, Section A, Mar 2022, Main Diesel Engine &ndash; Model 38D8-1/8</p>\n\n<p>Coast Guard Technical Publication (TP) 3474, SWBS 235, Section A, Propulsion Motor and Generator Installation</p>\n\n<p>Coast Guard Technical Publication (TP) 3475, SWBS 235, Section A, Propulsion Electric Equipment</p>\n\n<p>Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC Generators &amp; Motors</p>\n\n<p></p>\n\n<p><strong>Other References</strong></p>\n\n<p>None</p>\n\n<p><strong>REQUIREMENTS</strong></p>\n\n<p>3.1 <u>General</u>.</p>\n\n<p>3.1.1 <u>CIR.</u></p>\n\n<p>None.</p>\n\n<p>3.1.2 <u>Tech Rep</u>.&nbsp; The Contractor must provide the services of a qualified technician, who is familiar with load banking equipment including all equipment set up</p>\n\n<p>3.1.2.1 <em>Removed.</em></p>\n\n<p>3.1.2.2 <em>Removed</em>.</p>\n\n<p>3.1.3 <u>Protective measures</u>.&nbsp; The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).</p>\n\n<p>3.1.4 <u>Interferences</u>.&nbsp; The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:</p>\n\n<ul>\n\t<li>Deck plates.</li>\n\t<li>Deck framing.</li>\n\t<li>Piping.</li>\n\t<li>Handrails.</li>\n\t<li>Electrical wiring and cables/cableways.</li>\n\t<li>Miscellaneous machinery.</li>\n</ul>\n\n<p>3.1.5 <u>Contamination prevention</u>.&nbsp; The Contractor must take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.</p>\n\n<p></p>\n\n<p><strong>WARNING</strong></p>\n\n<p><strong>Do not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.</strong></p>\n\n<p>3.2 &nbsp;<u>Work plan</u>. &nbsp;The Contractor shall provide a work plan to the Contracting Officer (KO), at the time of solicitation submission, which lists all procedures, plans, and equipment the Contractor will utilize in support of flushing requirements. At a minimum, the plan shall include the following:</p>\n\n<ul>\n\t<li>Qualifications of Technicians</li>\n\t<li>Submission of equipment being used to conduct load banking</li>\n</ul>\n\n<p>3.3&nbsp; None</p>\n\n<p>3.4 <u>Load Banking Procedure requirements</u>.</p>\n\n<p>3.4.1 <u>Load Banking equipment</u>.&nbsp; The Contractor shall provide all equipment required to support load banking both Main Propulsion Generators in single operation and parallel operations including (but not limited to), the following:</p>\n\n<p>3.4.1.1 <u>Load Bank(s)</u>. &nbsp;Load Bank meeting the characteristics of the Main Propulsion Generator</p>\n\n<p>3.4.1.2 <u>Wiring</u>. &nbsp;Electric wiring of proper sizing to hook up load bank to Main Propulsion Generator (approx. 150 ft).</p>\n\n<p>3.4.1.3 <u>Portable Particle Counter</u>.&nbsp; A particle counter capable of continuously measuring fluid contamination with output in NAS code.</p>\n\n<p>3.4.5 <u>COR notification</u>.&nbsp; The Contractor shall notify the Senior Chief Ian Duthie (MAT Supervsior) when load bank is connected to appropriate machinery.&nbsp;</p>\n\n<p>3.4.6 <u>Inspector witnessing and approval</u>.&nbsp; The Contractor shall ensure that the Coast Guard Inspector is present during all load banking procedures.&nbsp; The Contractor&rsquo;s will submit written report upon completion of load bank of all parameters at each interval.</p>\n\n<p>3.4.7 Requirements</p>\n\n<p>3.4.7.1 See below table of load banking loads and timelines</p>\n\n<p></p>\n\n<p>Engine Speed (RPMs)</p>\n\n<p>Time (min)</p>\n\n<p>Main Propulsion Generator Load</p>\n\n<p>Mechanical Checks</p>\n\n<p>300</p>\n\n<p>5</p>\n\n<p>No Load</p>\n\n<p>B</p>\n\n<p>350</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p>A,B</p>\n\n<p>450</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>550</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>650</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p></p>\n\n<p>720</p>\n\n<p>15</p>\n\n<p>No Load</p>\n\n<p>A, B</p>\n\n<p>720</p>\n\n<p>60 (1 hour)</p>\n\n<p>25%</p>\n\n<p>A, B</p>\n\n<p>720</p>\n\n<p>60 (1 hour)</p>\n\n<p>37.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>120 (2 hour)</p>\n\n<p>50%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>62.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>75%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>87.5%</p>\n\n<p>A</p>\n\n<p>720</p>\n\n<p>180 (3 hour)</p>\n\n<p>100%</p>\n\n<p>A,B</p>\n\n<p></p>\n\n<p></p>\n\n<p>3.4.7.2 Load banking Main Propulsion Generators in parallel.&nbsp; Load banking in parallel will be to support grooming of MPCMS by Affinity Power System.&nbsp; Groom will take approx.. 8 hours.</p>\n\n<p>3.4.7.3 Once all MDE break in period and MPCMS groom is completed contractor shall disconnect all equipment and return MPG back to original configuration.&nbsp;</p>\n\n<p>3.4.7.4 Wipe clean any surfaces contaminated by load bank equipment.&nbsp;</p>\n\n<p><strong>4.&nbsp; NOTES</strong></p>\n\n<p>4.1 <u>Equipment operation</u>. Coast Guard personnel will operate all shipboard machinery and equipment during all operational tests besides load bank.</p>\n\n<p>4.2 <u>Coast Guard can assist with loading and unloading equipment from trailers.</u></p>\n\n<p><u>4.3 Security Requirements</u></p>\n\n<p><u>4.3.1 Citizenship. Each individual employed under the contract shall be a citizen of the United States of America, or an alien who has been lawfully admitted for permanent residence as evidenced by a Permanent Resident Card (USCIS I-551). Any exceptions must be approved by the Coast Guard&rsquo;s Security Officer or designee.&nbsp; </u>Contractors shall identify in their proposals, the names and citizenship of all non-U.S. citizens proposed to work under the contract. Any additions or deletions of non-U.S. citizens after contract award shall also be reported to the Contracting Officer.</p>\n\n<p>4.3.2 <u>Identification</u>. In accordance with federal facility access control policies, all contractor personnel, including subcontractors and any individuals employed by the contractor who require access to the installation, must possess a valid form of identification that complies with the REAL ID Act of 2005. Access will be denied to any individual presenting non-compliant identification. It is the responsibility of the contractor to ensure that all personnel meet this requirement prior to arrival at the federal installation.</p>\n\n<p></p>\n\n<p><em>4.4 <u>Location</u>. USCGC Katmai Bay.&nbsp; 337 East Water Street, Sault Sainte Marie, MI 49783.</em></p>\n\n<p></p>\n\n<p><em>4.5. <u>Period of Performance</u>. Contract awardee will begin work within three (3) calendar days of award notification. Work will be completed within three (3) calendar days of the start date. </em></p>","origin":"detail"},"contacts":[{"name":"GEORGE, JERAMYAH","role":"primary","email":"JERAMYAH.W.GEORGE@USCG.MIL","phone":"5716102958"},{"name":"DONNA O'NEAL","role":"secondary","email":"Donna.J.O'Neal@uscg.mil","phone":"5103931145"}],"place_of_performance":{"zip":"49783","city":{"code":"0","name":"Sault Sainte Marie"},"state":{"code":"MI","name":"Michigan"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"naics_codes":["336611"],"award":null,"attachments":[{"resource_id":"bdbbca84a52a4c27a411731bfebb3ca3","name":"SOW KATMAI BAY LOADBANKING TEST.pdf","kind":"file","mime_type":".pdf","size_bytes":721720,"posted_at":"2025-05-07T15:25:29.884Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bdbbca84a52a4c27a411731bfebb3ca3/download","mirrored":false}],"awards":[],"related":[{"key":"70Z08526RRJ001B00","latest_notice_id":"79adb3e9f10f4bceafdeca530cb99fdf","title":"TRS-3D /AN/SPS-75 Radar repairs/ overhaul services","solicitation_number":"70Z08526RRJ001B00","notice_type":"o","first_type":"o","first_posted":"2026-07-15","last_posted":"2026-11-19","notices":8,"due_at":"2026-12-01T17:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"811210","psc":"J059","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"70Z08526Q39002B00","latest_notice_id":"c2c828ffaf9848a1a975736420ad55cf","title":"ACTUATOR,GOVERNOR","solicitation_number":"70Z08526Q39002B00","notice_type":"o","first_type":"o","first_posted":"2025-12-10","last_posted":"2025-12-10","notices":1,"due_at":"2026-12-19T16:00:00Z","due_date":"2026-12-19","closes_at":"2026-12-19T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"2990","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 2990)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"}],"similar_open":[{"key":"N6264927RK003","latest_notice_id":"a5ed6a1c385f485792cc56d46933645f","title":"USNS CITY OF BISMARCK (T-EPF 9) VRA KR","solicitation_number":"N6264927RK003","notice_type":"o","first_type":"o","first_posted":"2026-11-20","last_posted":"2026-11-24","notices":2,"due_at":"2026-11-27T01:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62649","office_name":"NAVSUP FLT LOG CTR YOKOSUKA","naics":"336611","psc":"J999","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"KOR","place_scope":"overseas","state_source":null,"state_evidence":"KOREA, SOUTH","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"N6817127QN013","latest_notice_id":"37c3df6f8dd84ff3aae8e552610403a5","title":"Ship Repair","solicitation_number":"N6817127QN013","notice_type":"o","first_type":"o","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-27T12:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T12:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N68171","office_name":"NAVSUP FLC SIGONELLA NAPLES OFFICE","naics":"336611","psc":"J998","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"ESP","place_scope":"overseas","state_source":null,"state_evidence":"SPAIN","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"N0010427QBB55","latest_notice_id":"31cc02afaafa48a38413dbf47cafbc6e","title":"WATCH SUPV CHAIR","solicitation_number":"N0010427QBB55","notice_type":"o","first_type":"o","first_posted":"2026-10-27","last_posted":"2026-10-27","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"336611","psc":"2090","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 2090)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-28T04:01:09.175983Z"}],"similar_open_total":107,"indexable":false}