Combined synopsis and solicitation, total small business set-aside
USCGC Gasconade SSDG Control Panel replacement
70Z08526Q0002157
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
January 6, 2026 at 11:00 AM EST
Closed 324 days ago. Posted December 23, 2025. Scheduled to archive January 21, 2026.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2026
103 like it are open now in ship building and repairing
- USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due tomorrowNov 27 - Ship Repair
Department of the Navy, NAVSUP FLC Sigonella Naples Office
SolicitationNAICS 336611Outside the USN6817127QN013Due tomorrowNov 27 - WATCH SUPV CHAIR
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 336611Ship to the buyerN0010427QBB55Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 14 days from the day the solicitation was posted, December 23, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Statement of Work (SOW)
Project Title: Replacement, Installation, and Calibration of CAT 10R-9661 - Kit ELEK GP Controller on both SSDG’s aboard CGC GASCONADE
- Background
The purpose of this project is to replace both existing controllers on the cutters SSDG’s with the CAT 10R-9661 - Kit ELEK GP, ensuring proper installation and calibration in accordance with the manufacturer's instructions. This work is critical to maintaining the operational efficiency and reliability of the equipment.
- Contractor Furnished Equipment
Qty 2 – CAT Kit ELEK GP – 10R-6991
3. Scope of Work
The contractor shall provide all necessary labor, tools, equipment, and expertise to perform the following tasks:
- Removal of Old Controller:
- Safely disconnect and remove the existing controllers from the equipment.
- Ensure no damage is caused to surrounding components during removal.
- Installation of New Controller:
- Install the CAT 10R-9661 - Kit ELEK GP controllers in accordance with the manufacturer's specifications.
- Verify that all connections are secure and properly aligned.
- Calibration of Controller:
- Calibrate the newly installed controllers per the manufacturer's instructions.
- Ensure the controllers are functioning optimally and meets operational requirements.
4. Deliverables
The contractor shall provide the following:
- Two fully installed and calibrated CAT 10R-9661 - Kit ELEK GP controllers.
- Documentation of calibration settings and procedures performed.
- A brief report confirming the successful completion of the work and equipment functionality.
5. Period of Performance
The work shall be completed within 5 business days from the start date agreed upon by the contractor and the project manager.
6. Location of Work
The work will be performed at CGC GASCONADE, 100 Arsenal Street, ST. Louis MO, 63118
7. Contractor Responsibilities
The contractor shall:
- Comply with all safety regulations and standards during the execution of work.
- Provide qualified personnel to perform the tasks outlined in this SOW.
- Ensure all tools and equipment used are in good working condition.
8. Government Furnished Equipment (GFE)
None
9. Acceptance Criteria
The work will be considered complete when:
- The old controllers have been removed without damage to the equipment.
- The new controllers have been installed and calibrated per the manufacturer's instructions.
- The equipment is fully operational and meets performance standards.
10. Points of Contact
Questions related to anything listed within this statement of work, or access to the ship should be directed to: MKCS Matt Morin, 571-607-9267, matthew.j.morin@uscg.mil
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Statement of Work Gasonade.pdf111 KB, December 23, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
December 23, 2025
Combined synopsis and solicitation
Due January 6, 2026 at 11:00 AM EST. SAM.gov, notice d108f1bfd85e4538991fa9ae9204626e
1 revision on SAM
- December 23, 2025: publish, combined synopsis and solicitation
Points of contact
- DONNA O'NEALDonna.J.O'Neal@uscg.mil5103931145
- Lindsay Mongiovilindsay.n.mongiovi@uscg.mil5716086752