# USCGC Gasconade SSDG Control Panel replacement

Canonical: https://sealedbidder.com/opportunities/70z08526q0002157

- Solicitation number: 70Z08526Q0002157
- Notice type: Combined synopsis and solicitation
- Status: Closed. Deadline was January 6, 2026 at 11:00 AM EST
- Department: Department of Homeland Security
- Agency: US Coast Guard
- Contracting office: SFLC Procurement Branch 2 (70Z085)
- NAICS: 336611 Ship Building and Repairing
- Product or service code: J020 Maintenance, Repair and Rebuilding of Equipment: Ship and Marine Equipment
- Set-aside: Total small business set-aside
- Small business size standard: 1,300 employees (13 CFR 121.201, NAICS 336611)
- Place of performance: Saint Louis, Missouri
- County: City of St. Louis (FIPS 29510). https://sealedbidder.com/counties/city-of-st-louis-mo-29510
- City: St. Louis. https://sealedbidder.com/cities/st-louis-mo-2965000
- First posted: December 23, 2025
- Last posted: December 23, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/d108f1bfd85e4538991fa9ae9204626e/view

## Reading this notice

- Kind of notice: Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates.
- Time to respond: Bidders had 14 days from the day the solicitation was posted, December 23, 2025, to the deadline.

## Description

Statement of Work (SOW)

Project Title: Replacement, Installation, and Calibration of CAT 10R-9661 - Kit ELEK GP Controller on both SSDG&rsquo;s aboard CGC GASCONADE

	Background

	The purpose of this project is to replace both existing controllers on the cutters SSDG&rsquo;s with the CAT 10R-9661 - Kit ELEK GP, ensuring proper installation and calibration in accordance with the manufacturer's instructions. This work is critical to maintaining the operational efficiency and reliability of the equipment.

	Contractor Furnished Equipment

Qty 2 &ndash; CAT Kit ELEK GP &ndash; 10R-6991

3. Scope of Work

The contractor shall provide all necessary labor, tools, equipment, and expertise to perform the following tasks:

	Removal of Old Controller:

		Safely disconnect and remove the existing controllers from the equipment.

		Ensure no damage is caused to surrounding components during removal.

	Installation of New Controller:

		Install the CAT 10R-9661 - Kit ELEK GP controllers in accordance with the manufacturer's specifications.

		Verify that all connections are secure and properly aligned.

	Calibration of Controller:

		Calibrate the newly installed controllers per the manufacturer's instructions.

		Ensure the controllers are functioning optimally and meets operational requirements.

4. Deliverables

The contractor shall provide the following:

	Two fully installed and calibrated CAT 10R-9661 - Kit ELEK GP controllers.

	Documentation of calibration settings and procedures performed.

	A brief report confirming the successful completion of the work and equipment functionality.

5. Period of Performance

The work shall be completed within 5 business days from the start date agreed upon by the contractor and the project manager.

6. Location of Work

The work will be performed at CGC GASCONADE, 100 Arsenal Street, ST. Louis MO, 63118

7. Contractor Responsibilities

The contractor shall:

	Comply with all safety regulations and standards during the execution of work.

	Provide qualified personnel to perform the tasks outlined in this SOW.

	Ensure all tools and equipment used are in good working condition.

8. Government Furnished Equipment (GFE)

None

9. Acceptance Criteria

The work will be considered complete when:

	The old controllers have been removed without damage to the equipment.

	The new controllers have been installed and calibrated per the manufacturer's instructions.

	The equipment is fully operational and meets performance standards.

10. Points of Contact

Questions related to anything listed within this statement of work, or access to the ship should be directed to: MKCS Matt Morin, 571-607-9267, matthew.j.morin@uscg.mil

## Attachments

- [Statement of Work Gasonade.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2261d574f4f24b829507f8b777b4f356/download)

## Open now in the same industry

107 open in NAICS 336611.

- USNS CITY OF BISMARCK (T-EPF 9) VRA KR (N6264927RK003), due November 26, 2026 at 8:00 PM EST. https://sealedbidder.com/opportunities/n6264927rk003
- Ship Repair (N6817127QN013), due November 27, 2026 at 7:00 AM EST. https://sealedbidder.com/opportunities/n6817127qn013
- WATCH SUPV CHAIR (N0010427QBB55), due November 27, 2026 at 3:30 PM EST. https://sealedbidder.com/opportunities/n0010427qbb55

## Publications

- December 23, 2025: Combined synopsis and solicitation, due January 6, 2026 at 11:00 AM EST. Notice d108f1bfd85e4538991fa9ae9204626e. https://sam.gov/workspace/contract/opp/d108f1bfd85e4538991fa9ae9204626e/view

## Points of contact

- DONNA O'NEAL, Donna.J.O'Neal@uscg.mil, 5103931145
- Lindsay Mongiovi, lindsay.n.mongiovi@uscg.mil, 5716086752

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/70z08526q0002157.
