Solicitation, first published as presolicitation
UT FTNP DINO 10(3) 100(2) Green River Road and Quarry Access Road
6982AF24B000024
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Response deadline
November 21, 2024 at 4:00 PM EST
Closed 734 days ago. Posted January 23, 2025, first published September 23, 2024. Scheduled to archive February 28, 2025.
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one closed in 2024
36 like it are open now in highway, street, and bridge construction
- GAOA Brainard Lake Recreation Area Deferred Maintenance
Forest Service, USDA Forest Service
Combined synopsis and solicitationSmall businessNAICS 237310Ward, CO1240LT27Q0004Closes in 22 daysDec 17 - Administrative Parking Lot Repairs
Forest Service, Usda-Fs, Csa Intermountain 8
SolicitationSmall businessNAICS 237310Colorado1240LT27Q0019Closes in 23 daysDec 18 - AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due in 2 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 31 days from the day the solicitation was posted, October 21, 2024, to the deadline. The deadline moved once: it was first October 3, 2024 and ended as November 21, 2024.
- Before the solicitation
- The agency published a presolicitation on September 23, 2024, 28 days before the solicitation.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
PROJECT NUMBER: UT NP DINO 10(3) & 100(2)
PROJECT NAME: Green River Road & Quarry Access Road
PROJECT DESCRIPTION: The UT FTNP DINO 10(3)100(2), Green River Road and Quarry Access Road project is in Dinosaur National Monument approximately 16.9 miles east of the Vernal, Utah and 114.1 west of Craig, Colorado. The project is proposing to rehabilitate (3R) roads and parking lots. Additional work includes pavement preservation on routes within Dinosaur National Monument in the Utah and Colorado entrances. The project is broken up into one schedule with four options.
SCOPE OF THE WORK: Due to deterioration that is typical of aging pavement, Schedule A is proposing to rehabilitate (3R) approximately 2.35 miles of road, multiple pullouts, and two parking lots. The existing pavement section on both roadways are in poor condition with roadway cracking and aggregate surfacing. Options T, U, V, and W is proposing pavement preservation of 50.4 miles of roadways within Dinosaur National Monument in Utah and Colorado. This pavement preservation work will include crack sealing, asphalt patching, micro sealing, and chip sealing.
PRINCIPAL WORK ITEMS:
Schedule A:
- 20402-0000 Subexcavation, 8,000 CUYD
- 30202-2000 Roadway Aggregate, Method 2: 6,000 TON
- 30402-1000 Full Depth Reclamation, Method 2: 40,500 SQYD
- 40101-5600 Asphalt Concrete Pavement: 7,300 TON
- 60901-1000 Curb Concrete ,12-inch depth, 1,475 LNFT
- 61701-5100 Guardrail System MGS type 4, Class B Steel Posts 320 LNFT
Option T:
- 30402-5300 Full Depth Reclamation, Method 2, 6-Inch Depth
- 40101-5600 Asphalt Concrete Pavement: 1,810 SQYD
- 40702-0300 Chip Seal, Type 1C: 142,000 SQYD
- 40711-0000 Emulsified Asphalt: 270 TON
- 40901-2000 Micro Surfacing, Type 2: 39,010 SQYD
- 41801-2000 Asphalt Concrete Pavement Patch: 2500 SQYD
- 63402-0300 Pavement Markings, Type B, Solid 78 Mile
Option U:
- 40702-0300 Chip Seal, Type 1C: 217,000 SQYD
- 40711-0000 Emulsified Asphalt: 390 TON
- 40901-2000 Micro Surfacing, Type 2: 5,690 SQYD
- 41801-2000 Asphalt Concrete Pavement Patch, Type 2 185 SQYD
- 63402-0300 Pavement Markings, Type B, Solid 105.00 Mile
Option V:
- 40702-0300 Chip Seal, Type 1C: 178,000 SQYD
- 40711-0000 Emulsified Asphalt: 330 TON
- 40901-2000 Micro Surfacing, Type 2: 18,750 SQYD
- 41801-2000 Asphalt Concrete Pavement Patch: 810 SQYD
- 63402-0300 Pavement Markings, Type B, Solid 101 Mile
Option W:
- 40702-0300 Chip Seal, Type 1C: 151,000 SQYD
- 40711-0000 Emulsified Asphalt: 270 TON
- 40901-2000 Micro Surfacing, Type 2: 5,690 SQYD
- 41801-2000 Asphalt Concrete Pavement Patch, Type 2 185 SQYD
- 63402-0300 Pavement Markings, Type B, Solid 105.00 Mile
ESTIMATED COST RANGE: The anticipated cost range is between $10,000,000 and $20,000,000.
This project is being solicited as full and open competition
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 6982AF24B000024 UT FTNP DINO 10(3) 100(2) Green River Rd and Quarry Access Rd.pdf5.9 MB, October 21, 2024
- Plans.pdf53.3 MB, October 21, 2024
- 20.100 Final Pavement Report.pdf6.5 MB, October 21, 2024
- Amendment A001- UT FTNP DINO 10(3) 100(2).pdf1.4 MB, November 19, 2024
- QnA. 11.18.24- UT FTNP DINO 10(3) 100(2).pdf87 KB, November 19, 2024
- Bid Opening Summary- UT FTNP DINO 10(3) 100(2).pdf120 KB, November 21, 2024
- Bid Tabs- UT FTNP DINO 10(3) 100(2).pdf643 KB, January 23, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 23, 2024
Presolicitation, originally solicitation
Due October 3, 2024 at 6:00 PM EDT. SAM.gov, notice 5252a387ab5340e19a74faac644e2c7b
October 21, 2024
Solicitation, originally presolicitation
Due November 21, 2024 at 4:00 PM EST. SAM.gov, notice b367a6a8667143799597d242cd732a1e
November 19, 2024
Solicitation
Due November 21, 2024 at 4:00 PM EST. SAM.gov, notice bf3bfceb747a450d98d796929c8f7f58
November 21, 2024
Solicitation
Due November 21, 2024 at 4:00 PM EST. SAM.gov, notice b6949412879b4b3ebeb5ecb9f0534309
January 23, 2025
Solicitation
Due November 21, 2024 at 4:00 PM EST. SAM.gov, notice 46a42acd01f44e349b6dd5ca9489f489
6 revisions on SAM
- January 23, 2025: publish, solicitation
- January 23, 2025: publish, solicitation
- November 21, 2024: publish, solicitation
- November 19, 2024: publish, solicitation
- October 21, 2024: publish, solicitation
- September 23, 2024: publish, presolicitation
January 23, 2025
Solicitation
Due November 21, 2024 at 4:00 PM EST. SAM.gov, notice eec34675471e4bd4a395ae0bd6e88d6c
6 revisions on SAM
- January 23, 2025: publish, solicitation
- January 23, 2025: publish, solicitation
- November 21, 2024: publish, solicitation
- November 19, 2024: publish, solicitation
- October 21, 2024: publish, solicitation
- September 23, 2024: publish, presolicitation
Points of contact
- Stephanie NavarroCFLContracts@dot.gov
- Ryan PhillipsCFLContracts@dot.gov