# UT FTNP DINO 10(3) 100(2) Green River Road and Quarry Access Road

Canonical: https://sealedbidder.com/opportunities/6982af24b000024

- Solicitation number: 6982AF24B000024
- Notice type: Solicitation (first published as presolicitation)
- Status: Closed. Deadline was November 21, 2024 at 4:00 PM EST
- Department: Department of Transportation
- Agency: Federal Highway Administration
- Contracting office: 6982AF Central Federal Lands Divisi (6982AF)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237310)
- Place of performance: Dinosaur, Colorado
- County: Moffat County (FIPS 08081). https://sealedbidder.com/counties/moffat-county-co-08081
- City: Dinosaur. https://sealedbidder.com/cities/dinosaur-co-0820495
- First posted: September 23, 2024
- Last posted: January 23, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/eec34675471e4bd4a395ae0bd6e88d6c/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 31 days from the day the solicitation was posted, October 21, 2024, to the deadline. The deadline moved once: it was first October 3, 2024 and ended as November 21, 2024.
- Before the solicitation: The agency published a presolicitation on September 23, 2024, 28 days before the solicitation.

## Description

PROJECT NUMBER: UT NP DINO 10(3) & 100(2)

PROJECT NAME: Green River Road & Quarry Access Road

PROJECT DESCRIPTION:  The UT FTNP DINO 10(3)100(2), Green River Road and Quarry Access Road project is in Dinosaur National Monument approximately 16.9 miles east of the Vernal, Utah and 114.1 west of Craig, Colorado. The project is proposing to rehabilitate (3R) roads and parking lots. Additional work includes pavement preservation on routes within Dinosaur National Monument in the Utah and Colorado entrances. The project is broken up into one schedule with four options.

SCOPE OF THE WORK:  Due to deterioration that is typical of aging pavement, Schedule A is proposing to rehabilitate (3R) approximately 2.35 miles of road, multiple pullouts, and two parking lots. The existing pavement section on both roadways are in poor condition with roadway cracking and aggregate surfacing. Options T, U, V, and W is proposing pavement preservation of 50.4 miles of roadways within Dinosaur National Monument in Utah and Colorado. This pavement preservation work will include crack sealing, asphalt patching, micro sealing, and chip sealing.

PRINCIPAL WORK ITEMS:

Schedule A:

	20402-0000 Subexcavation, 8,000 CUYD

	30202-2000 Roadway Aggregate, Method 2: 6,000 TON

	30402-1000 Full Depth Reclamation, Method 2: 40,500 SQYD

	40101-5600 Asphalt Concrete Pavement: 7,300 TON

	60901-1000 Curb Concrete ,12-inch depth, 1,475 LNFT

	61701-5100 Guardrail System MGS type 4, Class B Steel Posts 320 LNFT

Option T:

	30402-5300 Full Depth Reclamation, Method 2, 6-Inch Depth

	40101-5600 Asphalt Concrete Pavement: 1,810 SQYD

	40702-0300 Chip Seal, Type 1C: 142,000 SQYD

	40711-0000 Emulsified Asphalt: 270 TON

	40901-2000 Micro Surfacing, Type 2: 39,010 SQYD

	41801-2000 Asphalt Concrete Pavement Patch: 2500 SQYD

	63402-0300 Pavement Markings, Type B, Solid 78 Mile

Option U:

	40702-0300 Chip Seal, Type 1C: 217,000 SQYD

	40711-0000 Emulsified Asphalt: 390 TON

	40901-2000 Micro Surfacing, Type 2: 5,690 SQYD

	41801-2000 Asphalt Concrete Pavement Patch, Type 2 185 SQYD

	63402-0300 Pavement Markings, Type B, Solid 105.00 Mile

Option V:

	40702-0300 Chip Seal, Type 1C: 178,000 SQYD

	40711-0000 Emulsified Asphalt: 330 TON

	40901-2000 Micro Surfacing, Type 2: 18,750 SQYD

	41801-2000 Asphalt Concrete Pavement Patch: 810 SQYD

	63402-0300 Pavement Markings, Type B, Solid 101 Mile

Option W:

	40702-0300 Chip Seal, Type 1C: 151,000 SQYD

	40711-0000 Emulsified Asphalt: 270 TON

	40901-2000 Micro Surfacing, Type 2: 5,690 SQYD

	41801-2000 Asphalt Concrete Pavement Patch, Type 2 185 SQYD

	63402-0300 Pavement Markings, Type B, Solid 105.00 Mile

ESTIMATED COST RANGE:  The anticipated cost range is between $10,000,000 and $20,000,000.

This project is being solicited as full and open competition

## Attachments

- [6982AF24B000024 UT FTNP DINO 10(3) 100(2) Green River Rd and Quarry Access Rd.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/20d508e6e2d64e00ac7cb9133a4ea50a/download)
- [Plans.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4370eaa1502a4acda94eda3b6b66e0f8/download)
- [20.100 Final Pavement Report.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/71f21850e6ac4c559918f6ae393684b1/download)
- [Amendment A001- UT FTNP DINO 10(3) 100(2).pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/090bedc34f98461ab00d0b11233d8db4/download)
- [QnA. 11.18.24- UT FTNP DINO 10(3) 100(2).pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ed5f493fec0a4bbdb468876b147c83cc/download)
- [Bid Opening Summary- UT FTNP DINO 10(3) 100(2).pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/55221f798bc24ea6a34ddbfa7a5a3e24/download)
- [Bid Tabs- UT FTNP DINO 10(3) 100(2).pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/322ee075f9a94effa18c94458e24c16a/download)

## Open now in the same industry

36 open in NAICS 237310.

- GAOA Brainard Lake Recreation Area Deferred Maintenance (1240LT27Q0004), due December 17, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/1240lt27q0004
- Administrative Parking Lot Repairs (1240LT27Q0019), due December 18, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/1240lt27q0019
- AL-WHEELER NWR-WATERMAN GATE (140FF027Q0077), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/140ff027q0077

## Publications

- September 23, 2024: Presolicitation, due October 3, 2024 at 6:00 PM EDT. Notice 5252a387ab5340e19a74faac644e2c7b. https://sam.gov/workspace/contract/opp/5252a387ab5340e19a74faac644e2c7b/view
- October 21, 2024: Solicitation, due November 21, 2024 at 4:00 PM EST. Notice b367a6a8667143799597d242cd732a1e. https://sam.gov/workspace/contract/opp/b367a6a8667143799597d242cd732a1e/view
- November 19, 2024: Solicitation, due November 21, 2024 at 4:00 PM EST. Notice bf3bfceb747a450d98d796929c8f7f58. https://sam.gov/workspace/contract/opp/bf3bfceb747a450d98d796929c8f7f58/view
- November 21, 2024: Solicitation, due November 21, 2024 at 4:00 PM EST. Notice b6949412879b4b3ebeb5ecb9f0534309. https://sam.gov/workspace/contract/opp/b6949412879b4b3ebeb5ecb9f0534309/view
- January 23, 2025: Solicitation, due November 21, 2024 at 4:00 PM EST. Notice 46a42acd01f44e349b6dd5ca9489f489. https://sam.gov/workspace/contract/opp/46a42acd01f44e349b6dd5ca9489f489/view
- January 23, 2025: Solicitation, due November 21, 2024 at 4:00 PM EST. Notice eec34675471e4bd4a395ae0bd6e88d6c. https://sam.gov/workspace/contract/opp/eec34675471e4bd4a395ae0bd6e88d6c/view

## Points of contact

- Stephanie Navarro, CFLContracts@dot.gov
- Ryan Phillips, CFLContracts@dot.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/6982af24b000024.
