Combined synopsis and solicitation
Demolition, Removal, and Remediation
6913G626Q300044
Office of the Secretary, 6913G6 Volpe Natl. Trans. Sys CNTR. Site Preparation Contractors.
Awarded
$134,325.10 obligated so far on USAspending
Get the next one like this from Office of the Secretary by email, the day it is posted.Find my opportunities
This one was awarded in 2026
6 like it are open now in site preparation contractors
- Camptonville Housing Decommissioning
Forest Service, USDA Forest Serivce
Combined synopsis and solicitationSmall businessNAICS 238910Nevada City, CA127EAX26Q0076Closes in 9 daysDec 5 - Forest Wide Decommissioning Project
Forest Service, Usda-Fs, Csa Southwest 7
Combined synopsis and solicitationSmall businessNAICS 238910Arizona127EAX27Q0013Closes in 11 daysDec 7 - UTILITY EXCAVATION AND REPAIR SERVICES IDIQ
Department of Energy, Fermilab - DOE Contractor
SolicitationSmall businessNAICS 238910Batavia, IL385439GMKCloses in 11 daysDec 7
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238910 (site preparation contractors), means no more than $19 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 13 days from the day the solicitation was posted, July 23, 2026, to the deadline. The deadline moved once: it was first August 4, 2026 and ended as August 5, 2026.
- How it ended
- Awarded to Aces, LLC on August 13, 2026, 8 days after offers were due. The contracting office reported 7 offers (competed under simplified acquisition procedures).
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey report for the facility scheduled for demolition.
The Work Plan shall describe methods and procedures for dismantling, demolishing, and/or removing structures and equipment designated for disposal, and restoration of the site listed in Section 1.1. Site-specific information is detailed in Section 5.0 Proposed Scope of Work subsections B, C and D in the individual site survey report. The Work Plan shall also identify additional material sampling including sampling methods, analysis and quality control as may be required for waste characterization for all sites, if necessary. Disposal methods must be detailed for including the identification of all disposal facilities where waste and/or debris is to be shipped. In addition the work plan shall also identify any required permits needed to perform the work and the contractor shall be responsible for obtaining those permits as required. Copies of the permits shall be attached to the work plan as an appendix.
Additional components of the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a Risk Management Plan that identifies major risks and hazards on the site and discusses ways to minimize these risks. The contractor should expect a 5 business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments.
See SOW for details.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attached VII - Site Survey Report GFL VOR SSR ION 1900-1682 Rev-2.0.pdf27.8 MB, July 23, 2026
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Aces, LLC
- UEI
- TM48JSEN6KK5
- CAGE
- 11UW3
- Vendor location
- Anchorage, AK
- Contract
- 6913G626P800045, purchase order
- Obligated
- $134,325.10
- Actions
- 1 between August 13, 2026 and August 13, 2026
- Competition
- Competed Under SAP, 7 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- GFL Vor Demolition, Disposal and Restoration in Glens Falls, Ny for FAA F26
- Match
- solicitation number 6913G626Q300044 equals the FPDS solicitation identifier; same awarding office 6913G6 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 23, 2026
Combined synopsis and solicitation
Due August 4, 2026 at 1:00 PM EDT. SAM.gov, notice 98cbd07492794cedbe9a88f3f63bac7e
3 revisions on SAM
- August 4, 2026: publish, combined synopsis and solicitation
- August 4, 2026: publish, combined synopsis and solicitation
- July 23, 2026: publish, combined synopsis and solicitation
August 4, 2026
Combined synopsis and solicitation
Due August 5, 2026 at 2:00 PM EDT. SAM.gov, notice e18e62ff57a54d45a892dc59ac04ca0b
3 revisions on SAM
- August 4, 2026: publish, combined synopsis and solicitation
- August 4, 2026: publish, combined synopsis and solicitation
- July 23, 2026: publish, combined synopsis and solicitation
August 4, 2026
Combined synopsis and solicitation
Due August 5, 2026 at 2:00 PM EDT. SAM.gov, notice f336001a240144fb8537659d70accad4
3 revisions on SAM
- August 4, 2026: publish, combined synopsis and solicitation
- August 4, 2026: publish, combined synopsis and solicitation
- July 23, 2026: publish, combined synopsis and solicitation
Points of contact
- Regan, Rolandroland.regan@dot.gov