# Demolition, Removal, and Remediation

Canonical: https://sealedbidder.com/opportunities/6913g626q300044

- Solicitation number: 6913G626Q300044
- Notice type: Combined synopsis and solicitation
- Status: Awarded to Aces, LLC
- Department: Department of Transportation
- Agency: Office of the Secretary
- Contracting office: 6913G6 Volpe Natl. Trans. Sys CNTR (6913G6)
- NAICS: 238910 Site Preparation Contractors
- Product or service code: F999 Other Environmental Services, Studies, and Analytical Support
- Small business size standard: $19 million in average annual receipts (13 CFR 121.201, NAICS 238910)
- Place of performance: Glens Falls, New York
- County: Warren County (FIPS 36113). https://sealedbidder.com/counties/warren-county-ny-36113
- City: Glens Falls. https://sealedbidder.com/cities/glens-falls-ny-3629333
- First posted: July 23, 2026
- Last posted: August 4, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/f336001a240144fb8537659d70accad4/view

## Reading this notice

- Kind of notice: Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238910 (site preparation contractors), means no more than $19 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 13 days from the day the solicitation was posted, July 23, 2026, to the deadline. The deadline moved once: it was first August 4, 2026 and ended as August 5, 2026.
- How it ended: Awarded to Aces, LLC on August 13, 2026, 8 days after offers were due. The contracting office reported 7 offers (competed under simplified acquisition procedures).

## Description

The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey report for the facility scheduled for demolition.

The Work Plan shall describe methods and procedures for dismantling, demolishing, and/or removing structures and equipment designated for disposal, and restoration of the site listed in Section 1.1. Site-specific information is detailed in Section 5.0 Proposed Scope of Work subsections B, C and D in the individual site survey report. The Work Plan shall also identify additional material sampling including sampling methods, analysis and quality control as may be required for waste characterization for all sites, if necessary. Disposal methods must be detailed for including the identification of all disposal facilities where waste and/or debris is to be shipped. In addition the work plan shall also identify any required permits needed to perform the work and the contractor shall be responsible for obtaining those permits as required. Copies of the permits shall be attached to the work plan as an appendix.

Additional components of the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a Risk Management Plan that identifies major risks and hazards on the site and discusses ways to minimize these risks. The contractor should expect a 5 business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments.

See SOW for details.

## Attachments

- [Attached VII - Site Survey Report GFL VOR SSR ION 1900-1682 Rev-2.0.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/74283ac111f044aab5e17f54e963eb73/download)

## Award on USAspending

- Recipient: Aces, LLC (UEI TM48JSEN6KK5)
- Contract: 6913G626P800045, purchase order
- Obligated: $134,325.10
- Competition: Competed Under SAP, 7 offers received
- Link: solicitation number 6913G626Q300044 equals the FPDS solicitation identifier; same awarding office 6913G6 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_6913G626P800045_6901_-NONE-_-NONE-/


## Open now in the same industry

6 open in NAICS 238910.

- Camptonville Housing Decommissioning (127EAX26Q0076), due December 4, 2026 at 8:00 PM EST. https://sealedbidder.com/opportunities/127eax26q0076
- Forest Wide Decommissioning Project (127EAX27Q0013), due December 7, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/127eax27q0013
- UTILITY EXCAVATION AND REPAIR SERVICES IDIQ (385439GMK), due December 7, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/385439gmk

## Publications

- July 23, 2026: Combined synopsis and solicitation, due August 4, 2026 at 1:00 PM EDT. Notice 98cbd07492794cedbe9a88f3f63bac7e. https://sam.gov/workspace/contract/opp/98cbd07492794cedbe9a88f3f63bac7e/view
- August 4, 2026: Combined synopsis and solicitation, due August 5, 2026 at 2:00 PM EDT. Notice e18e62ff57a54d45a892dc59ac04ca0b. https://sam.gov/workspace/contract/opp/e18e62ff57a54d45a892dc59ac04ca0b/view
- August 4, 2026: Combined synopsis and solicitation, due August 5, 2026 at 2:00 PM EDT. Notice f336001a240144fb8537659d70accad4. https://sam.gov/workspace/contract/opp/f336001a240144fb8537659d70accad4/view

## Points of contact

- Regan, Roland, roland.regan@dot.gov

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/6913g626q300044.
