Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,689 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Award notice, service-disabled veteran-owned small business set-aside, first published as presolicitation

657-23-101JB FCA Replace Various Air Handling Units/Chillers Buildings 1, 24 and 51

36C25525R0097

Department of Veterans Affairs, 255-Network Contract Office 15. Plumbing, Heating, and Air-Conditioning Contractors.

Awarded

Recon Construction Specialties LLC

$3,680,314.00 obligated so far on USAspending

Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities

This one was awarded in 2025

59 like it are open now in plumbing, heating, and air-conditioning contractors

All 59 open in plumbing, heating, and air-conditioning contractors

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Award notice. Who won, when, and for how much. Glossary
Who may compete
Service-disabled veteran-owned small business set-aside. Reserved for service-disabled veteran-owned small businesses. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open SDVOSB opportunities
Time to respond
Bidders had 75 days from the day the solicitation was posted, May 29, 2025, to the deadline. The deadline moved 4 times: it was first June 4, 2025 and ended as August 12, 2025.
Before the solicitation
The agency published a presolicitation on May 20, 2025, 9 days before the solicitation.
How it ended
Awarded to Recon Construction Specialties LLC on September 2, 2025, 21 days after offers were due. The contracting office reported 2 offers (competed under simplified acquisition procedures).

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov with the solicitation of August 5, 2025.

RFI #65.  Can the morgue be shut down during construction?  Providing temp cooling for that area to the degree required will be between difficult and impossible.  If the shutdown is not possible, can you please provide clarification on how temp cooling for that area is to be accomplished so we can properly price this scope?  Including the size and placement of temp unit/units that will achieve the appropriate temperatures? We don't use the JB morgue too often.  Most patients that pass at JB go directly to the funeral home.  The morgue is only used with the veteran does not have funeral home plans in place.  The backup plan is the patient will be transported to JC morgue until funeral home arrangements are made. RFI #70.  Sizing the temp units based on a preconstruction TAB report will not enable us to provide the proper pricing for our scope of work.  This information needs to be available for us to include the correct pricing at the time of our bid not after we are awarded the project.  Otherwise, it becomes and guess which usually drives the price up. AHU-01-1 Trane CSHX0035F3 (OR EQUIVALENT) (with electric heat), 7000 CFM Nominal, 5in Max ESP,  460V 3 Phase, MCA 179.8A, MOP 200A. Note: The contractor shall coordinate required electrical connection with the VA. AHU-01-2 Trane CSHX0035F3 (OR EQUIVALENT) (with electric heat), 7000 CFM Nominal, 5in Max ESP,  460V 3 Phase, MCA 179.8A, MOP 200A. Note: The contractor shall coordinate required electrical connection with the VA. AHU-24-1 Trane CSH0050F4 (OR EQUIVALENT) (with electric heat), 10000 CFM nominal, 5in Max ESP, 460V 3 Phase, MCA 232.2A, MOP 250A. Note: 460V unavailable at building 24. The contractor shall coordinate required electrical connection with the VA.. AHU-51-1 Trane RSHX0080 (OR EQUIVALENT) (with electric heat), 12,800 CFM nominal, 4.8in Max ESP, 460V 3 Phase, MCA 329A, MOP 400A Note: 460V unavailable at building 24. The contractor shall coordinate required electrical connection with the VA. If alternate is used, unit must have adequate capacity for DOAS application. The needs of the station and the temporary units are based on availability. The information provided is to ensure the contractor understands the situation and the need to ensure a maintenance team/ plan is made available by the subcontractor to avoid any issues with the temporary cooling during construction. Power can be provided to the temporary units as follows: Building 1: Feed the temporary AHU from 208V panel EMDP . Provide temporary transformer and connections as necessary. Building 24: Feed the temporary AHU from 208V External Wireway . Provide temporary transformer and connections as necessary. Building 51: Feed the temporary AHU from 208V switchboard MSB-51A . Provide temporary transformer and connections as necessary. RFI #72, 73 & 108. We need the design team to provide the proper information on the steam trap sizing and placement.  Including the traps at the units and any drip traps that might be required.  This is a complicated issue that would need to be designed .by the design team .not the installing contractor.  Drip traps are generally based on the pounds per hour capacity of the main.  This information is not available to us. Steam trap to be placed at the unit steam coil / humidifier. Anticipated piping lengths do not require steam drip traps. Contractor to verify and report the piping lengths from steam mains. STEAM TRAP SCHEDULE BASIS OF DESIGN   MANUFACTURER TRAP NO. TRAP SIZE MAX PRESSURE (PSI) STEAM CONDENSATE LOAD CONSTRUCTION AHU-1-01 HEATING COIL SPIRAX SARCO FT450-4.5 1" 15 217 STAINLESS STEEL AHU-1-02 HEATING COIL SPIRAX SARCO FT450-4.5 1" 15 276 STAINLESS STEEL AHU-24-01 HEATING COIL SPIRAX SARCO FT450-4.5 1-1/2" 15 466 STAINLESS STEEL AHU-51-01 HUMIDIFER SPIRAX SARCO FT450-4.5 3/4" 15 23 STAINLESS STEEL NOTE: STEAM TRAP CONNECTION SHALL BE RAISED FACE FLANGE. Additional Information regarding RFIs 97 and 100: 3C06 As builts and site photos: Condensate pumps in basement mechanical room GC18: Location of the Steam supply and condensate return riser main connection to horizontal main. No as-built of the steam condensate pump is available in Building 1, Room GC18. The steam riser main is 2-1/2 and the condensate return riser main is 2 based on as-built drawings available as noted above.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
MWZUVWXJ6EE5
CAGE
02A28
Vendor location
Villa Ridge, MO
Contract
36C25525C0061, definitive contract
Obligated
$3,680,314.00, current value $3,680,324
Actions
4 between September 2, 2025 and November 18, 2026
Competition
Competed Under SAP, 2 offers received
Set-aside reported
Service Disabled Veteran Owned Small Business SET-ASIDE
Described as
657-23-101JB Replace Various Ahu/ Chillers Buildings 124,51
Match
solicitation number 36C25525R0097 equals the FPDS solicitation identifier; same awarding office 36C255 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 20, 2025

    Presolicitation

    Due June 4, 2025 at 11:00 AM EDT. SAM.gov, notice 0b07b3b41eae4c4aa50acf04b98c5dcd

    2 revisions on SAM
    • May 20, 2025: publish, presolicitation
    • May 29, 2025: publish, solicitation
  2. May 29, 2025

    Solicitation, originally presolicitation

    Due July 14, 2025 at 11:00 AM EDT. SAM.gov, notice 1945676ff032487f92cbba6088e7d1f1

    7 revisions on SAM
    • August 5, 2025: publish, solicitation
    • August 4, 2025: publish, solicitation
    • July 24, 2025: publish, solicitation
    • July 17, 2025: publish, solicitation
    • July 10, 2025: publish, solicitation
    • May 20, 2025: publish, presolicitation
    • May 29, 2025: publish, solicitation
  3. July 10, 2025

    Solicitation

    Due July 28, 2025 at 11:00 AM EDT. SAM.gov, notice 8022eb4834da4cdf8e073c19cb70b850

    6 revisions on SAM
    • August 5, 2025: publish, solicitation
    • August 4, 2025: publish, solicitation
    • July 24, 2025: publish, solicitation
    • July 17, 2025: publish, solicitation
    • July 10, 2025: publish, solicitation
    • May 29, 2025: publish, solicitation
  4. July 17, 2025

    Solicitation

    Due July 28, 2025 at 11:00 AM EDT. SAM.gov, notice 2db77821760f41dc8447721a1355f973

    6 revisions on SAM
    • August 5, 2025: publish, solicitation
    • August 4, 2025: publish, solicitation
    • July 24, 2025: publish, solicitation
    • July 17, 2025: publish, solicitation
    • July 10, 2025: publish, solicitation
    • May 29, 2025: publish, solicitation
  5. July 24, 2025

    Solicitation

    Due August 4, 2025 at 11:00 AM EDT. SAM.gov, notice 97953b2c371d4b149b50bf2f26c4bf55

    6 revisions on SAM
    • August 5, 2025: publish, solicitation
    • August 4, 2025: publish, solicitation
    • July 24, 2025: publish, solicitation
    • July 17, 2025: publish, solicitation
    • July 10, 2025: publish, solicitation
    • May 29, 2025: publish, solicitation
  6. August 4, 2025

    Solicitation

    Due August 12, 2025 at 11:00 AM EDT. SAM.gov, notice 53b42e9bdd50400fa2776066ef90e1f5

    6 revisions on SAM
    • August 5, 2025: publish, solicitation
    • August 4, 2025: publish, solicitation
    • July 24, 2025: publish, solicitation
    • July 17, 2025: publish, solicitation
    • July 10, 2025: publish, solicitation
    • May 29, 2025: publish, solicitation
  7. August 5, 2025

    Solicitation

    Due August 12, 2025 at 11:00 AM EDT. SAM.gov, notice 97f5b269a23c4ee08e4a2fbd4f6ef9b8

    7 revisions on SAM
    • September 2, 2025: publish, award notice
    • August 5, 2025: publish, solicitation
    • August 4, 2025: publish, solicitation
    • July 24, 2025: publish, solicitation
    • July 17, 2025: publish, solicitation
    • July 10, 2025: publish, solicitation
    • May 29, 2025: publish, solicitation
  8. September 2, 2025

    Award notice, originally solicitation

    Awarded to Recon Construction Specialties LLC for $3,298,750. SAM.gov, notice 22f56b762b714f2dba97cd30584dda1f

    2 revisions on SAM
    • September 2, 2025: publish, award notice
    • August 5, 2025: publish, solicitation

Points of contact