Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,429 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, service-disabled veteran-owned small business set-aside

Eaton Powerware System Replacement

36C24127Q0030

Department of Veterans Affairs, 241-Network Contract Office 01. Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance.

Offers due

November 30, 2026 at 5:00 PM EST

4 days from now. Posted November 24, 2026, first published November 4, 2026.

Get an email when this is amended, when the deadline moves and when it is awarded.Watch it

Next from this buyer

Similar, open now

  • Halon Bottle Inspection

    Department of the Army, W7M2 Uspfo Activity Flang 125

    SolicitationSmall businessNAICS 811310FloridaW50S6Y27RA002
    Due tomorrowNov 27
  • Dry Dock Flow Meter Service

    Department of the Navy, Pearl Harbor Naval Shipyard Imf

    Combined synopsis and solicitationNAICS 811310HawaiiN32253-27-Q-0011
    Due tomorrowNov 27
  • Gate Valve Frame Replacement

    Department of the Air Force, FA4608 2 Cons LGC

    Combined synopsis and solicitationNAICS 811310LouisianaFA460826QS053
    Due tomorrowNov 27

All 55 open in commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. There is no separate solicitation to wait for: quote against this notice and its attachments before the deadline. Glossary
Who may compete
Service-disabled veteran-owned small business set-aside. Reserved for service-disabled veteran-owned small businesses. Small, under NAICS 811310 (commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance), means no more than $12.5 million in average annual receipts, counted with affiliates. Open SDVOSB opportunities
Time to respond
Bidders have 26 days from the day the solicitation was posted, November 4, 2026, to the deadline. The deadline moved once: it was first November 26, 2026 and is now November 30, 2026.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

36C24127Q0030 UPS Eaton Powerware System Replacement - RFIs Does the VA require technicians performing quarterly and annual preventive maintenance to be individually factory-certified or authorized by Eaton? Due to the complex nature of the product and criticality - Yes Will documented experience and technical qualifications satisfy the qualification requirement for routine preventive maintenance? See answer to RFI 1 Is direct access to Eaton's proprietary field-service software mandatory for the prime contractor, or may that requirement be fulfilled through an Eaton-authorized service provider supporting specific procedures? Prime Contractor does not require that; That portion can be filled through an Eaton Authorized Technician. Would a contractor be considered technically acceptable if it performs routine maintenance using qualified technicians and subcontracts manufacturer-restricted procedures and startup to Eaton? Yes, minor PM work such as filter changes etc. would be outside the requirement of needing an Eaton Technician. Since Eaton has discontinued the 93E product line, will the VA accept the current Eaton 93PM or another equivalent replacement system meeting the required performance specifications? The VA would accept an Eaton alternative. The goal of the project is to replace existing equipment in-kind with newer model. Does the existing Eaton Powerware 9390 system have an external maintenance bypass (for example, a maintenance bypass panel or a bypass sidecar with maintenance bypass and isolation breakers)? Yes, See photos. Is the replacement expected to include a maintenance bypass sidecar, such as the Eaton 93E 60 kVA bypass sidecar shown in Attachment A, or is it limited to the UPS and Extended Battery Cabinet listed in SOW Section 3.5? The UPS is required to be able to go into maintenance Bypass and maintain power to the computer room during maintenance. What is the kVA rating of the existing unit? The SOW says "Model 80," but the replacement is specified at 60 kVA. Existing UPS is 80KVA. The goal is to replace-in- kind. The 60kVA was utilized as a basis of design. What are the existing input voltage and output voltage? Current system: Eaton Powerware 9390-80 Model 80 AC IN: 208VAC 3W 60Hz 3Phase 240A AC OUT: 208VAC 4W 60Hz 3Phase 222A 78KW 80KVA BYPASS: 208VAC 4W 60Hz 3Phase 222A 80KVA DC: 384-480Vdc 204A Please provide a photo of the existing unit's data plate. See attached photos Please provide photos of the full system (standing back) and of the battery cabinet and batteries. See attached photos Please confirm the battery quantity and model: 40 x Hitachi Chemical Energy Technology 12V 540W, HRC12540WP. Confirmed What is the current battery run time, and what run time is required for the replacement? 60 minutes would it be possible to forward the latest performance specifications/Source Control Drawings for the Powerware System attached Will the VA be paying invoices on a Net-30/45/60 schedule?  The VA approves all invoices within 15 days and funds are transferred within 30 days of receipt.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 4, 2026

    Combined synopsis and solicitation

    Due November 26, 2026 at 5:00 PM EST. SAM.gov, notice 6f97724c9b8240ee8de274db1332a50b

    1 revision on SAM
    • November 4, 2026: publish, combined synopsis and solicitation
  2. November 10, 2026

    Combined synopsis and solicitation

    Due November 26, 2026 at 5:00 PM EST. SAM.gov, notice 4714ade3c0c64219ac3aef1c5bd50eba

    2 revisions on SAM
    • November 10, 2026: publish, combined synopsis and solicitation
    • November 4, 2026: publish, combined synopsis and solicitation
  3. November 18, 2026

    Combined synopsis and solicitation

    Due November 30, 2026 at 5:00 PM EST. SAM.gov, notice 48e1719d7de84ef4a7790e6dd7ddf446

    3 revisions on SAM
    • November 18, 2026: publish, combined synopsis and solicitation
    • November 10, 2026: publish, combined synopsis and solicitation
    • November 4, 2026: publish, combined synopsis and solicitation
  4. November 24, 2026

    Combined synopsis and solicitation

    Due November 30, 2026 at 5:00 PM EST. SAM.gov, notice 0972ed7abad54341b2b9e2b9fde3a568

    5 revisions on SAM
    • November 24, 2026: publish, combined synopsis and solicitation
    • November 24, 2026: publish, combined synopsis and solicitation
    • November 18, 2026: publish, combined synopsis and solicitation
    • November 10, 2026: publish, combined synopsis and solicitation
    • November 4, 2026: publish, combined synopsis and solicitation
  5. November 24, 2026

    Combined synopsis and solicitation

    Due November 30, 2026 at 5:00 PM EST. SAM.gov, notice 10c3d2d3d0c543179707f8cc9448f701

    5 revisions on SAM
    • November 24, 2026: publish, combined synopsis and solicitation
    • November 24, 2026: publish, combined synopsis and solicitation
    • November 18, 2026: publish, combined synopsis and solicitation
    • November 10, 2026: publish, combined synopsis and solicitation
    • November 4, 2026: publish, combined synopsis and solicitation

Points of contact