# Eaton Powerware System Replacement

Canonical: https://sealedbidder.com/opportunities/36c24127q0030

- Solicitation number: 36C24127Q0030
- Notice type: Combined synopsis and solicitation
- Status: Open. Offers due November 30, 2026 at 5:00 PM EST
- Department: Department of Veterans Affairs
- Contracting office: 241-Network Contract Office 01 (36C241)
- NAICS: 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- Product or service code: J061 Maintenance, Repair and Rebuilding of Equipment: Electric Wire, and Power and Distribution Equipment
- Set-aside: Service-disabled veteran-owned small business set-aside
- Small business size standard: $12.5 million in average annual receipts (13 CFR 121.201, NAICS 811310)
- Place of performance: Manchester, New Hampshire
- County: Hillsborough County (FIPS 33011). https://sealedbidder.com/counties/hillsborough-county-nh-33011
- City: Manchester. https://sealedbidder.com/cities/manchester-nh-3345140
- First posted: November 4, 2026
- Last posted: November 24, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/10c3d2d3d0c543179707f8cc9448f701/view

## Reading this notice

- Kind of notice: Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. There is no separate solicitation to wait for: quote against this notice and its attachments before the deadline.
- Who may compete: Service-disabled veteran-owned small business set-aside. Reserved for service-disabled veteran-owned small businesses. Small, under NAICS 811310 (commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance), means no more than $12.5 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders have 26 days from the day the solicitation was posted, November 4, 2026, to the deadline. The deadline moved once: it was first November 26, 2026 and is now November 30, 2026.

## Description

36C24127Q0030 UPS Eaton Powerware System Replacement   - RFIs

Does the VA require technicians performing quarterly and annual preventive maintenance to be individually factory-certified or authorized by Eaton?
Due to the complex nature of the product and criticality - Yes

Will documented experience and technical qualifications satisfy the qualification requirement for routine preventive maintenance?
See answer to RFI 1

Is direct access to Eaton's proprietary field-service software mandatory for the prime contractor, or may that requirement be fulfilled through an Eaton-authorized service provider supporting specific procedures?
Prime Contractor does not require that; That portion can be filled through an Eaton Authorized Technician.

Would a contractor be considered technically acceptable if it performs routine maintenance using qualified technicians and subcontracts manufacturer-restricted procedures and startup to Eaton?
Yes, minor PM work such as filter changes etc. would be outside the requirement of needing an Eaton Technician.

Since Eaton has discontinued the 93E product line, will the VA accept the current Eaton 93PM or another equivalent replacement system meeting the required performance specifications?
The VA would accept an Eaton alternative. The goal of the project is to replace existing equipment in-kind with newer model.

Does the existing Eaton Powerware 9390 system have an external maintenance bypass (for example, a maintenance bypass panel or a bypass sidecar with maintenance bypass and isolation breakers)?
Yes, See photos.

Is the replacement expected to include a maintenance bypass sidecar, such as the Eaton 93E 60 kVA bypass sidecar shown in Attachment A, or is it limited to the UPS and Extended Battery Cabinet listed in SOW Section 3.5?
The UPS is required to be able to go into maintenance Bypass and maintain power to the computer room during maintenance.

What is the kVA rating of the existing unit? The SOW says "Model 80," but the replacement is specified at 60 kVA.
Existing UPS is 80KVA. The goal is to replace-in- kind. The 60kVA was utilized as a basis of design.

What are the existing input voltage and output voltage?
Current system: Eaton Powerware 9390-80 Model 80
AC IN: 208VAC 3W 60Hz 3Phase 240A
AC OUT: 208VAC 4W 60Hz 3Phase 222A 78KW 80KVA
BYPASS: 208VAC 4W 60Hz 3Phase 222A 80KVA
DC: 384-480Vdc   204A

Please provide a photo of the existing unit's data plate.
See attached photos

Please provide photos of the full system (standing back) and of the battery cabinet and batteries.
See attached photos

Please confirm the battery quantity and model: 40 x Hitachi Chemical Energy Technology 12V 540W, HRC12540WP.
Confirmed

What is the current battery run time, and what run time is required for the replacement?
60 minutes

would it be possible to forward the latest performance specifications/Source Control Drawings for the Powerware System
attached

Will the VA be paying invoices on a Net-30/45/60 schedule?Â 
The VA approves all invoices within 15 days and funds are transferred within 30 days of receipt.

## Attachments

- [36C24127Q0030.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b3708202f7224273b773e9a23be12fb2/download)
- [Attachment A - Eaton 93E UPS manufacturer cut sheets and site electrical drawings Start-Up.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ad3e5ffce80e4ad2bb193bdc057c3eb6/download)
- [Attachment B - Wage Determination No 2015-4019 rev 35.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/20c13cb088c8467ebe6d049e577adde6/download)
- [36C24127Q0030_1.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/99ff7f1b63ab4bf3ac8602ce33cec38d/download)
- [36C24127Q0030_2.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/113f0adc38954129a9e3792b808be804/download)
- [36C24127Q0030_3.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0bd71c1fcc0c4010bdabc3491cf59f23/download)
- [UPS Eaton PowerWare Replacement Photos.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/733b580bf339484fa0b627582432dead/download)
- [UPS Guide Specification.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b565a9f6ebc841d1a29c7297a9d56b59/download)
- [UPS Installation Instructions.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/137b20900a1842fc978bc0df2886d956/download)
- [UPS Drawings and Other Info.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/43b45ab7f82742f1854ffe2895d6e013/download)
- [UPS Manual Section II Operation.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4e59203a41604d1f967ef67fee0ddbf2/download)
- [UPS Eaton 9390 product info.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/28e15ef6804a43dead5205a9d3947a88/download)

## Open now in the same industry

57 open in NAICS 811310.

- Halon Bottle Inspection (W50S6Y27RA002), due November 27, 2026 at 12:00 PM EST. https://sealedbidder.com/opportunities/w50s6y27ra002
- Dry Dock Flow Meter Service (N32253-27-Q-0011), due November 27, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/n3225327q0011
- Material Handling Equipment (MHE) and Industrial Equipment (IE) Maintenance and Repair Services (W912PL27QA001), due November 27, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/w912pl27qa001

## Publications

- November 4, 2026: Combined synopsis and solicitation, due November 26, 2026 at 5:00 PM EST. Notice 6f97724c9b8240ee8de274db1332a50b. https://sam.gov/workspace/contract/opp/6f97724c9b8240ee8de274db1332a50b/view
- November 10, 2026: Combined synopsis and solicitation, due November 26, 2026 at 5:00 PM EST. Notice 4714ade3c0c64219ac3aef1c5bd50eba. https://sam.gov/workspace/contract/opp/4714ade3c0c64219ac3aef1c5bd50eba/view
- November 18, 2026: Combined synopsis and solicitation, due November 30, 2026 at 5:00 PM EST. Notice 48e1719d7de84ef4a7790e6dd7ddf446. https://sam.gov/workspace/contract/opp/48e1719d7de84ef4a7790e6dd7ddf446/view
- November 24, 2026: Combined synopsis and solicitation, due November 30, 2026 at 5:00 PM EST. Notice 0972ed7abad54341b2b9e2b9fde3a568. https://sam.gov/workspace/contract/opp/0972ed7abad54341b2b9e2b9fde3a568/view
- November 24, 2026: Combined synopsis and solicitation, due November 30, 2026 at 5:00 PM EST. Notice 10c3d2d3d0c543179707f8cc9448f701. https://sam.gov/workspace/contract/opp/10c3d2d3d0c543179707f8cc9448f701/view

## Points of contact

- Shawn Lawrence, Contract Specialist, Shawn.Lawrence@va.gov, 914-737-4400 ext. 202121

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/36c24127q0030.
