Combined synopsis and solicitation
Non-CAA space chiller and fan coil unit replacement project
19EN1025Q0127
Department of State, U.S. Embassy Tallinn. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
May 5, 2025 at 5:00 AM EDT
Closed 570 days ago. Posted April 11, 2025, first published March 18, 2025. Scheduled to archive May 5, 2025.
Get the next one like this from Department of State by email, the day it is posted.Find my opportunities
This one closed in 2025
59 like it are open now in plumbing, heating, and air-conditioning contractors
- HVAC Unit Replacement
National Oceanic and Atmospheric Administration, Department of Commerce NOAA
Combined synopsis and solicitationSmall businessNAICS 238220Location not published1305M327Q0010Due in 5 daysDec 1 - HVAC Replacement - MI
Departmental Offices, FWS Contracting Activity
Combined synopsis and solicitationSmall businessNAICS 238220Location not published140FF027R0008Due in 6 daysDec 2 - NC ALLIGATOR RIVER NWR HVAC PM Option Yr Contract
Departmental Offices, FWS Contracting Activity
SolicitationSmall businessNAICS 238220Location not published140FF027Q0082Closes in 8 daysDec 4
All 59 open in plumbing, heating, and air-conditioning contractors
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 48 days from the day the solicitation was posted, March 18, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This project describes the replacement of the existing building's cooling system with at least an equivalent system. The goal is to replace the entire cooling system and auxiliary structures.
To reduce construction costs, a solution will be proposed that is as similar as possible to the existing system, and ultimately, suggestions for improving the system will be presented.
The Contractor shall provide and install (1) new Air-cooled chiller with integrated hydraulic module (2 high pressure pumps (compressors), expansion vessel), and associated connection piping, controls, electrical conduit/wiring and all necessary mechanical and electrical accessories to provide a fully functioning system that meets the project requirements for replacement in kind. The new chiller must have Refrigerant Filter-Drier Liquid Line and Refrigerant Suction Line Filter-Drier. The new chiller will have two sections/sides and have the option to switch to the other side when one section (compressor) fails.
The Contractor shall use the current wall penetrations and make as little modifications as applicable. The contractor shall provide FCUs (Fan Coil Units) that will fit in the current suspended ceiling opening, so that the suspended ceiling wouldn’t need any modifications. The new FCUs will fit the existing suspended ceiling opening and the FCU verge/collar will cover the opening so that the new FCU will look aesthetically correct.
The Contractor shall remove the existing chiller from the metal frame. Removal shall include all associated piping and wiring that will not be used as part of the new work. No systems, equipment or components are to be abandoned in place. All chilled water (glycol) piping except the part on the 1st floor South related to EVI, AmericanSeries (CAHG09) FCU, wall thermostat and cooled water piping section to the hallway door will be removed and disposed. Devices associated with the chiller and/or main chilled water branch piping shall be removed, disposed and new installed, such as gauges, thermostats, isolation valves, balancing valves, and strainers
Please see the RFQ foor full and detailed scope of work and requirements.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- RFQ nr. 19EN1025Q0127 for cooling system upgrade.pdf3.2 MB, March 18, 2025
- SF-30 - Amendment of Solicitation.pdf641 KB, April 11, 2025
- Continuation to SF30 RFQ 19EN1025Q0127-A001.pdf3.1 MB, April 11, 2025
- Standard Form 1442.pdf821 KB, April 11, 2025
- QA Document from site visit.pdf136 KB, April 11, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 18, 2025
Combined synopsis and solicitation
Due May 5, 2025 at 5:00 AM EDT. SAM.gov, notice 77b3c5aa450943d3835f80293464eb1e
2 revisions on SAM
- April 11, 2025: publish, combined synopsis and solicitation
- March 18, 2025: publish, combined synopsis and solicitation
April 11, 2025
Combined synopsis and solicitation
Due May 5, 2025 at 5:00 AM EDT. SAM.gov, notice 500a56ab9a504695a7f706614bdefaf0
2 revisions on SAM
- April 11, 2025: publish, combined synopsis and solicitation
- March 18, 2025: publish, combined synopsis and solicitation
Points of contact
- Mrs. Hind TaziTaziH@state.gov3726688154
- Katrin Lipstal (Procurement Agent)Lipstalk@state.gov003726688173