{"canonical":"https://sealedbidder.com/opportunities/19en1025q0127","key":"19EN1025Q0127","url":"https://sealedbidder.com/opportunities/19en1025q0127","title":"Non-CAA space chiller and fan coil unit replacement project","solicitation_number":"19EN1025Q0127","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-05-05T09:00:00Z","first_posted":"2025-03-18","last_posted":"2025-04-11","department":"STATE, DEPARTMENT OF","subagency":"STATE, DEPARTMENT OF","office":"U.S. EMBASSY TALLINN","naics":"238220","psc":"N041","set_aside":null,"place_state":null,"place_scope":"overseas","site":null,"place_state_source":null,"place_evidence":"ESTONIA","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"77b3c5aa450943d3835f80293464eb1e","title":"Non-CAA space chiller and fan coil unit replacement project","solicitation_number":"19EN1025Q0127","notice_type":"k","base_type":"k","posted":"2025-03-18","posted_at":"2025-03-18T14:01:03.533Z","due_at":"2025-05-05T09:00:00Z","due_date":"2025-05-05","cancelled":false,"archived":true,"archive_date":"2025-05-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/77b3c5aa450943d3835f80293464eb1e/view","enriched":true,"history":[{"index":3,"title":"Non-CAA space chiller and fan coil unit replacement project","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T10:22:24.457Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"500a56ab9a504695a7f706614bdefaf0","solicitation_number":"19EN1025Q0127","parent_opportunity_id":"77b3c5aa450943d3835f80293464eb1e"},{"index":1,"title":"Non-CAA space chiller and fan coil unit replacement project","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T14:01:03.533Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"77b3c5aa450943d3835f80293464eb1e","solicitation_number":"19EN1025Q0127"}]},{"notice_id":"500a56ab9a504695a7f706614bdefaf0","title":"Non-CAA space chiller and fan coil unit replacement project","solicitation_number":"19EN1025Q0127","notice_type":"k","base_type":"k","posted":"2025-04-11","posted_at":"2025-04-11T10:22:24.457Z","due_at":"2025-05-05T09:00:00Z","due_date":"2025-05-05","cancelled":false,"archived":true,"archive_date":"2025-05-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/500a56ab9a504695a7f706614bdefaf0/view","enriched":true,"history":[{"index":3,"title":"Non-CAA space chiller and fan coil unit replacement project","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T10:22:24.457Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"500a56ab9a504695a7f706614bdefaf0","solicitation_number":"19EN1025Q0127","parent_opportunity_id":"77b3c5aa450943d3835f80293464eb1e"},{"index":1,"title":"Non-CAA space chiller and fan coil unit replacement project","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T14:01:03.533Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"77b3c5aa450943d3835f80293464eb1e","solicitation_number":"19EN1025Q0127"}]}],"latest_notice_id":"500a56ab9a504695a7f706614bdefaf0","first_type":"k","notices":[{"dates":{"posted":"2025-03-18","posted_at":"2025-03-18T14:01:03.533Z","created_at":"2025-03-17T12:33:22.130Z","modified_at":"2025-05-06T04:00:10.294Z","response_deadline":{"raw":"2025-05-05T12:00:00+03:00","utc":"2025-05-05T09:00:00Z","date":"2025-05-05","time":"12:00:00","timezone":"Europe/Athens","utc_offset_seconds":10800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/77b3c5aa450943d3835f80293464eb1e/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Non-CAA space chiller and fan coil unit replacement project","agency":{"office":{"code":"19EN10","name":"U.S. EMBASSY TALLINN"},"subtier":{"code":"1900","name":"STATE, DEPARTMENT OF"},"department":{"code":"019","name":"STATE, DEPARTMENT OF"},"office_address":{"zip":"20520","city":"WASHINGTON","state":"DC","country":"USA"},"organization_id":"100163976","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-05","archive_type":"auto_custom"},"history":[{"index":3,"title":"Non-CAA space chiller and fan coil unit replacement project","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T10:22:24.457Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"500a56ab9a504695a7f706614bdefaf0","solicitation_number":"19EN1025Q0127","parent_opportunity_id":"77b3c5aa450943d3835f80293464eb1e"},{"index":1,"title":"Non-CAA space chiller and fan coil unit replacement project","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T14:01:03.533Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"77b3c5aa450943d3835f80293464eb1e","solicitation_number":"19EN1025Q0127"}],"contacts":[{"name":"Mrs. Hind Tazi","role":"primary","email":"TaziH@state.gov","phone":"3726688154"},{"name":"Katrin Lipstal (Procurement Agent)","role":"secondary","email":"Lipstalk@state.gov","phone":"003726688173"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"77b3c5aa450943d3835f80293464eb1e","lineage_id":"77b3c5aa450943d3835f80293464eb1e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-20T03:09:00.671084163Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"fd211edbabd4067cea23df6dff46ccb7cdc3642caa82cb3b49ff6d4d23cbd294","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-20T03:09:00.671084163Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This project describes the replacement of the existing building&#39;s cooling system with at least an equivalent system. The goal is to replace the entire cooling system and auxiliary structures.<br />\nTo reduce construction costs, a solution will be proposed that is as similar as possible to the existing system, and ultimately, suggestions for improving the system will be presented.</p>\n\n<p>The Contractor shall provide and install (1) new Air-cooled chiller with integrated hydraulic module (2 high pressure pumps (compressors), expansion vessel), and associated connection piping, controls, electrical conduit/wiring and all necessary mechanical and electrical accessories to provide a fully functioning system that meets the project requirements for replacement in kind. The new chiller must have Refrigerant Filter-Drier Liquid Line and Refrigerant Suction Line Filter-Drier. The new chiller will have two sections/sides and have the option to switch to the other side when one section (compressor) fails.</p>\n\n<p>The Contractor shall use the current wall penetrations and make as little modifications as applicable. The contractor shall provide FCUs (Fan Coil Units) that will fit in the current suspended ceiling opening, so that the suspended ceiling wouldn&rsquo;t need any modifications. The new FCUs will fit the existing suspended ceiling opening and the FCU verge/collar will cover the opening so that the new FCU will look aesthetically correct.</p>\n\n<p>The Contractor shall remove the existing chiller from the metal frame. Removal shall include all associated<strong> </strong>piping and wiring that will not be used as part of the new work. No systems, equipment or components are to be abandoned in place. All chilled water (glycol) piping except the part on the 1st floor South related to EVI, AmericanSeries (CAHG09) FCU, wall thermostat and cooled water piping section to the hallway door will be removed and disposed. Devices associated with the chiller and/or main chilled water branch piping shall be removed, disposed and new installed, such as gauges, thermostats, isolation valves, balancing valves, and strainers</p>\n\n<p>Please see the RFQ foor full and detailed scope of work and requirements.</p>","text":"This project describes the replacement of the existing building's cooling system with at least an equivalent system. The goal is to replace the entire cooling system and auxiliary structures.\n\nTo reduce construction costs, a solution will be proposed that is as similar as possible to the existing system, and ultimately, suggestions for improving the system will be presented.\n\nThe Contractor shall provide and install (1) new Air-cooled chiller with integrated hydraulic module (2 high pressure pumps (compressors), expansion vessel), and associated connection piping, controls, electrical conduit/wiring and all necessary mechanical and electrical accessories to provide a fully functioning system that meets the project requirements for replacement in kind. The new chiller must have Refrigerant Filter-Drier Liquid Line and Refrigerant Suction Line Filter-Drier. The new chiller will have two sections/sides and have the option to switch to the other side when one section (compressor) fails.\n\nThe Contractor shall use the current wall penetrations and make as little modifications as applicable. The contractor shall provide FCUs (Fan Coil Units) that will fit in the current suspended ceiling opening, so that the suspended ceiling wouldn’t need any modifications. The new FCUs will fit the existing suspended ceiling opening and the FCU verge/collar will cover the opening so that the new FCU will look aesthetically correct.\n\nThe Contractor shall remove the existing chiller from the metal frame. Removal shall include all associated piping and wiring that will not be used as part of the new work. No systems, equipment or components are to be abandoned in place. All chilled water (glycol) piping except the part on the 1st floor South related to EVI, AmericanSeries (CAHG09) FCU, wall thermostat and cooled water piping section to the hallway door will be removed and disposed. Devices associated with the chiller and/or main chilled water branch piping shall be removed, disposed and new installed, such as gauges, thermostats, isolation valves, balancing valves, and strainers\n\nPlease see the RFQ foor full and detailed scope of work and requirements.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"19EN1025Q0127","place_of_performance":{"zip":"15099","city":{"code":"Tallinn","name":"Tallinn"},"state":{"code":"EE-37","name":"Harjumaa"},"country":{"code":"EST","name":"ESTONIA"}},"product_service_code":"N041"},{"dates":{"posted":"2025-04-11","posted_at":"2025-04-11T10:22:24.457Z","created_at":"2025-04-11T10:18:41.375Z","modified_at":"2025-05-06T04:00:10.294Z","response_deadline":{"raw":"2025-05-05T12:00:00+03:00","utc":"2025-05-05T09:00:00Z","date":"2025-05-05","time":"12:00:00","timezone":"Europe/Athens","utc_offset_seconds":10800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/500a56ab9a504695a7f706614bdefaf0/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Non-CAA space chiller and fan coil unit replacement project","agency":{"office":{"code":"19EN10","name":"U.S. EMBASSY TALLINN"},"subtier":{"code":"1900","name":"STATE, DEPARTMENT OF"},"department":{"code":"019","name":"STATE, DEPARTMENT OF"},"office_address":{"zip":"20520","city":"WASHINGTON","state":"DC","country":"USA"},"organization_id":"100163976","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-05","archive_type":"auto_custom"},"history":[{"index":3,"title":"Non-CAA space chiller and fan coil unit replacement project","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T10:22:24.457Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"500a56ab9a504695a7f706614bdefaf0","solicitation_number":"19EN1025Q0127","parent_opportunity_id":"77b3c5aa450943d3835f80293464eb1e"},{"index":1,"title":"Non-CAA space chiller and fan coil unit replacement project","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T14:01:03.533Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"77b3c5aa450943d3835f80293464eb1e","solicitation_number":"19EN1025Q0127"}],"contacts":[{"name":"Mrs. Hind Tazi","role":"primary","email":"TaziH@state.gov","phone":"3726688154"},{"name":"Katrin Lipstal (Procurement Agent)","role":"secondary","email":"Lipstalk@state.gov","phone":"003726688173"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"500a56ab9a504695a7f706614bdefaf0","lineage_id":"77b3c5aa450943d3835f80293464eb1e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-18T01:56:37.605522332Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"2c718b0d69239e1d57eb78baa01e385324dbd2414d9331b7c9d69e9001b0e7a7","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-18T01:56:37.605522332Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This project describes the replacement of the existing building&#39;s cooling system with at least an equivalent system. The goal is to replace the entire cooling system and auxiliary structures.<br />\nTo reduce construction costs, a solution will be proposed that is as similar as possible to the existing system, and ultimately, suggestions for improving the system will be presented.</p>\n\n<p>The Contractor shall provide and install (1) new Air-cooled chiller with integrated hydraulic module (2 high pressure pumps (compressors), expansion vessel), and associated connection piping, controls, electrical conduit/wiring and all necessary mechanical and electrical accessories to provide a fully functioning system that meets the project requirements for replacement in kind. The new chiller must have Refrigerant Filter-Drier Liquid Line and Refrigerant Suction Line Filter-Drier. The new chiller will have two sections/sides and have the option to switch to the other side when one section (compressor) fails.</p>\n\n<p>The Contractor shall use the current wall penetrations and make as little modifications as applicable. The contractor shall provide FCUs (Fan Coil Units) that will fit in the current suspended ceiling opening, so that the suspended ceiling wouldn&rsquo;t need any modifications. The new FCUs will fit the existing suspended ceiling opening and the FCU verge/collar will cover the opening so that the new FCU will look aesthetically correct.</p>\n\n<p>The Contractor shall remove the existing chiller from the metal frame. Removal shall include all associated<strong> </strong>piping and wiring that will not be used as part of the new work. No systems, equipment or components are to be abandoned in place. All chilled water (glycol) piping except the part on the 1st floor South related to EVI, AmericanSeries (CAHG09) FCU, wall thermostat and cooled water piping section to the hallway door will be removed and disposed. Devices associated with the chiller and/or main chilled water branch piping shall be removed, disposed and new installed, such as gauges, thermostats, isolation valves, balancing valves, and strainers</p>\n\n<p>Please see the RFQ foor full and detailed scope of work and requirements.</p>","text":"This project describes the replacement of the existing building's cooling system with at least an equivalent system. The goal is to replace the entire cooling system and auxiliary structures.\n\nTo reduce construction costs, a solution will be proposed that is as similar as possible to the existing system, and ultimately, suggestions for improving the system will be presented.\n\nThe Contractor shall provide and install (1) new Air-cooled chiller with integrated hydraulic module (2 high pressure pumps (compressors), expansion vessel), and associated connection piping, controls, electrical conduit/wiring and all necessary mechanical and electrical accessories to provide a fully functioning system that meets the project requirements for replacement in kind. The new chiller must have Refrigerant Filter-Drier Liquid Line and Refrigerant Suction Line Filter-Drier. The new chiller will have two sections/sides and have the option to switch to the other side when one section (compressor) fails.\n\nThe Contractor shall use the current wall penetrations and make as little modifications as applicable. The contractor shall provide FCUs (Fan Coil Units) that will fit in the current suspended ceiling opening, so that the suspended ceiling wouldn’t need any modifications. The new FCUs will fit the existing suspended ceiling opening and the FCU verge/collar will cover the opening so that the new FCU will look aesthetically correct.\n\nThe Contractor shall remove the existing chiller from the metal frame. Removal shall include all associated piping and wiring that will not be used as part of the new work. No systems, equipment or components are to be abandoned in place. All chilled water (glycol) piping except the part on the 1st floor South related to EVI, AmericanSeries (CAHG09) FCU, wall thermostat and cooled water piping section to the hallway door will be removed and disposed. Devices associated with the chiller and/or main chilled water branch piping shall be removed, disposed and new installed, such as gauges, thermostats, isolation valves, balancing valves, and strainers\n\nPlease see the RFQ foor full and detailed scope of work and requirements.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"19EN1025Q0127","place_of_performance":{"zip":"15099","city":{"code":"Tallinn","name":"Tallinn"},"state":{"code":"EE-37","name":"Harjumaa"},"country":{"code":"EST","name":"ESTONIA"}},"product_service_code":"N041"}],"due_at":"2025-05-05T09:00:00Z","due_date":"2025-05-05","closes_at":"2025-05-05T09:00:00Z","awardable":true,"dept_key":"d-019","dept_name":"STATE, DEPARTMENT OF","sub_key":"s-1900","sub_name":"STATE, DEPARTMENT OF","office_key":"o-19EN10","office_name":"U.S. EMBASSY TALLINN","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"EST","state_source":null,"state_evidence":"ESTONIA","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-18T02:15:18.304919Z","principal_notice_id":"500a56ab9a504695a7f706614bdefaf0","description":{"text":"This project describes the replacement of the existing building's cooling system with at least an equivalent system. The goal is to replace the entire cooling system and auxiliary structures.\n\nTo reduce construction costs, a solution will be proposed that is as similar as possible to the existing system, and ultimately, suggestions for improving the system will be presented.\n\nThe Contractor shall provide and install (1) new Air-cooled chiller with integrated hydraulic module (2 high pressure pumps (compressors), expansion vessel), and associated connection piping, controls, electrical conduit/wiring and all necessary mechanical and electrical accessories to provide a fully functioning system that meets the project requirements for replacement in kind. The new chiller must have Refrigerant Filter-Drier Liquid Line and Refrigerant Suction Line Filter-Drier. The new chiller will have two sections/sides and have the option to switch to the other side when one section (compressor) fails.\n\nThe Contractor shall use the current wall penetrations and make as little modifications as applicable. The contractor shall provide FCUs (Fan Coil Units) that will fit in the current suspended ceiling opening, so that the suspended ceiling wouldn’t need any modifications. The new FCUs will fit the existing suspended ceiling opening and the FCU verge/collar will cover the opening so that the new FCU will look aesthetically correct.\n\nThe Contractor shall remove the existing chiller from the metal frame. Removal shall include all associated piping and wiring that will not be used as part of the new work. No systems, equipment or components are to be abandoned in place. All chilled water (glycol) piping except the part on the 1st floor South related to EVI, AmericanSeries (CAHG09) FCU, wall thermostat and cooled water piping section to the hallway door will be removed and disposed. Devices associated with the chiller and/or main chilled water branch piping shall be removed, disposed and new installed, such as gauges, thermostats, isolation valves, balancing valves, and strainers\n\nPlease see the RFQ foor full and detailed scope of work and requirements.","html":"<p>This project describes the replacement of the existing building&#39;s cooling system with at least an equivalent system. The goal is to replace the entire cooling system and auxiliary structures.<br />\nTo reduce construction costs, a solution will be proposed that is as similar as possible to the existing system, and ultimately, suggestions for improving the system will be presented.</p>\n\n<p>The Contractor shall provide and install (1) new Air-cooled chiller with integrated hydraulic module (2 high pressure pumps (compressors), expansion vessel), and associated connection piping, controls, electrical conduit/wiring and all necessary mechanical and electrical accessories to provide a fully functioning system that meets the project requirements for replacement in kind. The new chiller must have Refrigerant Filter-Drier Liquid Line and Refrigerant Suction Line Filter-Drier. The new chiller will have two sections/sides and have the option to switch to the other side when one section (compressor) fails.</p>\n\n<p>The Contractor shall use the current wall penetrations and make as little modifications as applicable. The contractor shall provide FCUs (Fan Coil Units) that will fit in the current suspended ceiling opening, so that the suspended ceiling wouldn&rsquo;t need any modifications. The new FCUs will fit the existing suspended ceiling opening and the FCU verge/collar will cover the opening so that the new FCU will look aesthetically correct.</p>\n\n<p>The Contractor shall remove the existing chiller from the metal frame. Removal shall include all associated<strong> </strong>piping and wiring that will not be used as part of the new work. No systems, equipment or components are to be abandoned in place. All chilled water (glycol) piping except the part on the 1st floor South related to EVI, AmericanSeries (CAHG09) FCU, wall thermostat and cooled water piping section to the hallway door will be removed and disposed. Devices associated with the chiller and/or main chilled water branch piping shall be removed, disposed and new installed, such as gauges, thermostats, isolation valves, balancing valves, and strainers</p>\n\n<p>Please see the RFQ foor full and detailed scope of work and requirements.</p>","origin":"detail"},"contacts":[{"name":"Mrs. Hind Tazi","role":"primary","email":"TaziH@state.gov","phone":"3726688154"},{"name":"Katrin Lipstal (Procurement Agent)","role":"secondary","email":"Lipstalk@state.gov","phone":"003726688173"}],"place_of_performance":{"zip":"15099","city":{"code":"Tallinn","name":"Tallinn"},"state":{"code":"EE-37","name":"Harjumaa"},"country":{"code":"EST","name":"ESTONIA"}},"office_address":{"zip":"20520","city":"WASHINGTON","state":"DC","country":"USA"},"naics_codes":["238220"],"award":null,"attachments":[{"resource_id":"e9a0b4562bfc499a9fe14ca413f66054","name":"RFQ nr. 19EN1025Q0127 for cooling system upgrade.pdf","kind":"file","mime_type":".pdf","size_bytes":3395670,"posted_at":"2025-03-18T14:01:03.533Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e9a0b4562bfc499a9fe14ca413f66054/download","mirrored":false},{"resource_id":"bbfae4f1cc4d4011a44b14722c657369","name":"SF-30 - Amendment of Solicitation.pdf","kind":"file","mime_type":".pdf","size_bytes":656566,"posted_at":"2025-04-11T10:22:24.457Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bbfae4f1cc4d4011a44b14722c657369/download","mirrored":false},{"resource_id":"55cde8cde3964125bbea83a566ac8183","name":"Continuation to SF30 RFQ 19EN1025Q0127-A001.pdf","kind":"file","mime_type":".pdf","size_bytes":3285425,"posted_at":"2025-04-11T10:22:24.457Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/55cde8cde3964125bbea83a566ac8183/download","mirrored":false},{"resource_id":"c13db579961c403190dbe07485dc8d8f","name":"Standard Form 1442.pdf","kind":"file","mime_type":".pdf","size_bytes":840825,"posted_at":"2025-04-11T10:22:24.457Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c13db579961c403190dbe07485dc8d8f/download","mirrored":false},{"resource_id":"c1d860af34044d6c93b79b5d99571694","name":"QA Document from site visit.pdf","kind":"file","mime_type":".pdf","size_bytes":139143,"posted_at":"2025-04-11T10:22:24.457Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c1d860af34044d6c93b79b5d99571694/download","mirrored":false}],"awards":[],"related":[{"key":"19EN1027Q0001","latest_notice_id":"9705c7ba485342758ffc3dc37198876d","title":"RFQ for Lodging services for training event in Riga, Latvia","solicitation_number":"19EN1027Q0001","notice_type":"o","first_type":"o","first_posted":"2026-10-05","last_posted":"2026-10-21","notices":2,"due_at":"2029-10-29T10:00:00Z","due_date":"2029-10-29","closes_at":"2029-10-29T10:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-019","dept_name":"STATE, DEPARTMENT OF","sub_key":"s-1900","sub_name":"STATE, DEPARTMENT OF","office_key":"o-19EN10","office_name":"U.S. EMBASSY TALLINN","naics":"721110","psc":"V231","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"LVA","place_scope":"overseas","state_source":null,"state_evidence":"LATVIA","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"removed_at":null,"updated_at":"2026-11-02T00:27:51.121586Z"}],"similar_open":[{"key":"1305M327Q0010","latest_notice_id":"d627ab06be0a475992e3f59e7e6b7a83","title":"J--HVAC Unit Replacement","solicitation_number":"1305M327Q0010","notice_type":"k","first_type":"k","first_posted":"2026-10-23","last_posted":"2026-11-23","notices":4,"due_at":"2026-12-01T22:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-013","dept_name":"COMMERCE, DEPARTMENT OF","sub_key":"s-1330","sub_name":"NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION","office_key":"o-1305M3","office_name":"DEPT OF COMMERCE NOAA","naics":"238220","psc":"J041","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"140FF027R0008","latest_notice_id":"9089c60c626d42c893f85d4147f4b28a","title":"Z--HVAC Replacement - MI","solicitation_number":"140FF027R0008","notice_type":"k","first_type":"k","first_posted":"2026-11-02","last_posted":"2026-11-17","notices":5,"due_at":"2026-12-02T20:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140FF0","office_name":"FWS CONTRACTING ACTIVITY","naics":"238220","psc":"Z2EC","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"140FF027Q0082","latest_notice_id":"108e37aa05a74090a8002ece95d79d16","title":"J--NC ALLIGATOR RIVER NWR HVAC PM Option Yr Contract","solicitation_number":"140FF027Q0082","notice_type":"o","first_type":"o","first_posted":"2026-11-16","last_posted":"2026-11-20","notices":2,"due_at":"2026-12-04T20:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140FF0","office_name":"FWS CONTRACTING ACTIVITY","naics":"238220","psc":"J045","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":59,"indexable":false}