Presolicitation, total small business set-aside
Tortilla Campground Pavement Preservation Project - Tonto NF
127EAX26R0002
Forest Service, Usda-Fs, Csa Southwest 7. Highway, Street, and Bridge Construction.
Response deadline
October 11, 2025 at 6:00 PM EDT
Closed 411 days ago. Posted September 26, 2025. Scheduled to archive October 26, 2025.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2025
36 like it are open now in highway, street, and bridge construction
- AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due tomorrowNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 4 daysNov 30 - NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip
Departmental Offices, National Park Service Contracting Activity
Sources soughtNAICS 237310Not tied to one place140PP027R0017Due in 4 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation was published under this number after the presolicitation of September 26, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The purpose of this project is to preserve the existing infrastructure within Tortilla Campground. The
contractor shall provide all labor, materials, equipment, tools, and incidentals required to complete the
repairs outlined in the contract documents. These repairs include, but are not limited to, crack sealing,
patching, micro-surfacing, pavement marking, and a full system hydro-jetting of accessible sewer
mainlines and branch lines. Extended pavement preservation is included as an optional bid item. This
project is funded through the Great American Outdoors Act, with the goal of enhancing and extending
the lifespan of recreational facilities to better serve visitors to the Tonto National Forest.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Tortilla Project Map.pdf456 KB, September 26, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 26, 2025
Presolicitation
Due October 11, 2025 at 6:00 PM EDT. SAM.gov, notice 264218f0d1f547e593e907c6bc5c2564
1 revision on SAM
- September 26, 2025: publish, presolicitation
Points of contact
- Blaine Greenwaltblaine.greenwalt@usda.gov