# Tortilla Campground Pavement Preservation Project - Tonto NF

Canonical: https://sealedbidder.com/opportunities/127eax26r0002

- Solicitation number: 127EAX26R0002
- Notice type: Presolicitation
- Status: Closed. Deadline was October 11, 2025 at 6:00 PM EDT
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: Usda-Fs, Csa Southwest 7 (127EAX)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Z1LB Maintenance Of Highways/Roads/Streets/Bridges/Railways
- Set-aside: Total small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237310)
- Place of performance: Phoenix, Arizona
- County: Maricopa County (FIPS 04013). https://sealedbidder.com/counties/maricopa-county-az-04013
- City: Phoenix. https://sealedbidder.com/cities/phoenix-az-0455000
- First posted: September 26, 2025
- Last posted: September 26, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/264218f0d1f547e593e907c6bc5c2564/view

## Reading this notice

- Kind of notice: Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates.
- What comes next: No solicitation was published under this number after the presolicitation of September 26, 2025. An agency sometimes issues the solicitation under a new number.

## Description

The purpose of this project is to preserve the existing infrastructure within Tortilla Campground. The

contractor shall provide all labor, materials, equipment, tools, and incidentals required to complete the

repairs outlined in the contract documents. These repairs include, but are not limited to, crack sealing,

patching, micro-surfacing, pavement marking, and a full system hydro-jetting of accessible sewer

mainlines and branch lines. Extended pavement preservation is included as an optional bid item. This

project is funded through the Great American Outdoors Act, with the goal of enhancing and extending

the lifespan of recreational facilities to better serve visitors to the Tonto National Forest.

## Attachments

- [Tortilla Project Map.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bef7a79fabef46a59211dc3b46272825/download)

## Open now in the same industry

36 open in NAICS 237310.

- AL-WHEELER NWR-WATERMAN GATE (140FF027Q0077), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/140ff027q0077
- W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation (W912EK27BA003), due November 30, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/w912ek27ba003
- NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip (140PP027R0017), due November 30, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/140pp027r0017

## Publications

- September 26, 2025: Presolicitation, due October 11, 2025 at 6:00 PM EDT. Notice 264218f0d1f547e593e907c6bc5c2564. https://sam.gov/workspace/contract/opp/264218f0d1f547e593e907c6bc5c2564/view

## Points of contact

- Blaine Greenwalt, blaine.greenwalt@usda.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/127eax26r0002.
