Presolicitation, total small business set-aside
Multnomah Falls Lodge - Walk in cooler Insulation Upgrade
1240BH25Q0026
Forest Service, Usda-Fs, Csa Northwest 6. Commercial and Institutional Building Construction.
Awarded
$145,510.00 obligated so far on USAspending
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one was awarded in 2025
193 like it are open now in commercial and institutional building construction
- Rehab Kiosk Restrooms, NPS-ORCA
Departmental Offices, National Park Service Contracting Activity
SolicitationSmall businessNAICS 236220Cave Junction, OR140PP027Q0018Closes in 8 daysDec 4 - 653-26-110 Light Remodel Bldg 17
Department of Veterans Affairs, 260-Network Contract Office 20
SolicitationSDVOSBNAICS 236220Oregon36C26027R0033Closes in 13 daysDec 9 - Project Number 653-105, Seismic Retrofit of Building 16, Roseburg VAMC, Oregon
Department of Veterans Affairs, Office of Construction & Facilities MGMT
Closes in 14 daysDec 10
All 193 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- How it ended
- Awarded to DPK Services Inc. on September 25, 2025, 55 days after offers were due. The contracting office reported 1 offer (competed under simplified acquisition procedures).
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Historic Multnomah Falls Lodge requires replacement of the existing walk-in cooler, freezer and produce cooler. This project is to demolish the existing three coolers, furnish and install new walk-in cooler with walk-in freezer and new produce cooler. Contractor to provide all labor and materials for demolition and complete functional installation. All work is to be done in accordance with applicable laws and regulations. Electrical work to be performed by licensed electrician in the state of Oregon. Contractor to obtain all permits required. All equipment furnished shall have a one-year warranty period from the date of start-up.
Period of Performance: The demolition and installation shall occur no earlier than October 1, 2025 and be completed by February 28, 2026. Installation dates to be coordinated within 45 days of notice to proceed. Period of construction not to exceed 12 calendar days.
The lodge is operated under permit by Multnomah Falls Co. Inc. (MFC). The lodge kitchen will remain open during construction. MFC will provide temporary cooler and freezer during the replacement of the walk-in coolers and freezer. Contractor shall coordinate installation times with MFC and the Contracting Officer to minimize disruptions to business operations.
The following bid item descriptions are general saliant features requested of the coolers. Contractor to submit shop drawings, product data, ancillary equipment and anchor details for approval prior to release for construction. The associated contract drawings are for conceptual use only to show general layout and size required, under no circumstances are the drawings for construction use. The existing wet/glycol fire suppression system has four sprinkler heads within the walk-in freezer and cooler, and two in the ceiling space above. Contractor shall include replacement of these heads and associated draw down of the system, and bringing the system back to operational status. See attached fire suppression system as-builts. After installation of the new coolers the Contractor shall replace any interior kitchen wall, floor, or ceiling to restore to existing conditions.
The magnitude of this construction project is between $100,000 and $250,000.
THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES.
This notice is for the issuance of a blanket purchase agreement call request on Northwest Facilities Maintenance (FMAC) 1204M320Q0041.
THIS IS A REQUEST UNDER A PREVIOUSLY ISSUED BPA.
WE ARE NOT LOOKING TO ADD NEW CONTRACTORS TO THE BPA AT THIS TIME.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- DPK Services Inc.
- UEI
- HJ81CM8AQ866
- CAGE
- 6S7K9
- Vendor location
- Battle Ground, WA
- Contract
- 1240BH25F0055 under 1204M320A0007, bpa call
- Obligated
- $145,510.00
- Actions
- 3 between September 25, 2025 and July 23, 2026
- Competition
- Competed Under SAP, 1 offer received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Doge Approval NRE-1667 Multnomah Falls Lodge Requires Replacement of the Existing Walk-In Cooler and Freezer, and Produce Cooler.
- Match
- solicitation number 1240BH25Q0026 equals the FPDS solicitation identifier; same awarding office 1240BH (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 3, 2025
Presolicitation
Walk in cooler Insulation Upgrade
Due August 1, 2025 at 7:00 PM EDT. SAM.gov, notice 4d4f6144d7e74ec8ab9fc9ebf89d407a
2 revisions on SAM
- July 3, 2025: publish, presolicitation
- July 3, 2025: publish, presolicitation
July 3, 2025
Presolicitation
Due August 1, 2025 at 7:00 PM EDT. SAM.gov, notice c02604d4a6f140688722914c219c8767
2 revisions on SAM
- July 3, 2025: publish, presolicitation
- July 3, 2025: publish, presolicitation
Points of contact
- Loren Meinloren.mein@usda.gov2183024863