# Multnomah Falls Lodge - Walk in cooler Insulation Upgrade

Canonical: https://sealedbidder.com/opportunities/1240bh25q0026

- Solicitation number: 1240BH25Q0026
- Notice type: Presolicitation
- Status: Awarded to DPK Services Inc.
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: Usda-Fs, Csa Northwest 6 (1240BH)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Z2AZ Repair Or Alteration Of Other Administrative Facilities And Service Buildings
- Set-aside: Total small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236220)
- Place of performance: Corbett, Oregon
- County: Multnomah County (FIPS 41051). https://sealedbidder.com/counties/multnomah-county-or-41051
- First posted: July 3, 2025
- Last posted: July 3, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/c02604d4a6f140688722914c219c8767/view

## Reading this notice

- Kind of notice: Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates.
- How it ended: Awarded to DPK Services Inc. on September 25, 2025, 55 days after offers were due. The contracting office reported 1 offer (competed under simplified acquisition procedures).

## Description

The Historic Multnomah Falls Lodge requires replacement of the existing walk-in cooler, freezer and produce cooler.  This project is to demolish the existing three coolers, furnish and install new walk-in cooler with walk-in freezer and new produce cooler.  Contractor to provide all labor and materials for demolition and complete functional installation.  All work is to be done in accordance with applicable laws and regulations.  Electrical work to be performed by licensed electrician in the state of Oregon.  Contractor to obtain all permits required.  All equipment furnished shall have a one-year warranty period from the date of start-up.

Period of Performance:  The demolition and installation shall occur no earlier than October 1, 2025 and be completed by February 28, 2026.  Installation dates to be coordinated within 45 days of notice to proceed.  Period of construction not to exceed 12 calendar days.

The lodge is operated under permit by Multnomah Falls Co. Inc. (MFC).  The lodge kitchen will remain open during construction.  MFC will provide temporary cooler and freezer during the replacement of the walk-in coolers and freezer.  Contractor shall coordinate installation times with MFC and the Contracting Officer to minimize disruptions to business operations.

The following bid item descriptions are general saliant features requested of the coolers.  Contractor to submit shop drawings, product data, ancillary equipment and anchor details for approval prior to release for construction.  The associated contract drawings are for conceptual use only to show general layout and size required, under no circumstances are the drawings for construction use.  The existing wet/glycol fire suppression system has four sprinkler heads within the walk-in freezer and cooler, and two in the ceiling space above.  Contractor shall include replacement of these heads and associated draw down of the system, and bringing the system back to operational status.  See attached fire suppression system as-builts.  After installation of the new coolers the Contractor shall replace any interior kitchen wall, floor, or ceiling to restore to existing conditions.

The magnitude of this construction project is between $100,000 and $250,000.

THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES.

This notice is for the issuance of a blanket purchase agreement call request on Northwest Facilities Maintenance (FMAC) 1204M320Q0041.

THIS IS A REQUEST UNDER A PREVIOUSLY ISSUED BPA.

 WE ARE NOT LOOKING TO ADD NEW CONTRACTORS TO THE BPA AT THIS TIME.

## Award on USAspending

- Recipient: DPK Services Inc. (UEI HJ81CM8AQ866)
- Contract: 1240BH25F0055 under 1204M320A0007, bpa call
- Obligated: $145,510.00
- Competition: Competed Under SAP, 1 offers received
- Link: solicitation number 1240BH25Q0026 equals the FPDS solicitation identifier; same awarding office 1240BH (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_1240BH25F0055_12C2_1204M320A0007_12C2/


## Open now in the same industry

193 open in NAICS 236220.

- Rehab Kiosk Restrooms, NPS-ORCA (140PP027Q0018), due December 3, 2026 at 8:00 PM EST. https://sealedbidder.com/opportunities/140pp027q0018
- 653-26-110 Light Remodel Bldg 17 (36C26027R0033), due December 9, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/36c26027r0033
- Project Number 653-105, Seismic Retrofit of Building 16, Roseburg VAMC, Oregon (36C10F26R0084), due December 10, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/36c10f26r0084

## Publications

- July 3, 2025: Presolicitation, due August 1, 2025 at 7:00 PM EDT. Notice 4d4f6144d7e74ec8ab9fc9ebf89d407a. https://sam.gov/workspace/contract/opp/4d4f6144d7e74ec8ab9fc9ebf89d407a/view
- July 3, 2025: Presolicitation, due August 1, 2025 at 7:00 PM EDT. Notice c02604d4a6f140688722914c219c8767. https://sam.gov/workspace/contract/opp/c02604d4a6f140688722914c219c8767/view

## Points of contact

- Loren Mein, loren.mein@usda.gov, 2183024863

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/1240bh25q0026.
