Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,724 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation

USCGC WAESCHE FLOORING UPGRADES

11702PR250000363

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Response deadline

April 25, 2025 at 12:00 AM EDT

Closed 579 days ago. Posted April 21, 2025, first published April 16, 2025. Scheduled to archive April 25, 2025.

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one closed in 2025

105 like it are open now in ship building and repairing

All 105 open in ship building and repairing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. What a set-aside is
Time to respond
Bidders had 9 days from the day the solicitation was posted, April 16, 2025, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363

Purpose and objective:

CGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew’s Lounge to have finished by June 6th 2025.

Scope: This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.

Table 1 – Decking System

LOCATION

AREA SQ FEET

DECK MTL

COVER BASE

UNDERLAYMENT REQUIREMENT

AMTICO SPACIA DECKING/ SYSTEM COLOR

SUGGESTED SOURCE OF SUPPLY

Officer Wardroom/ Lounge (1-44-2-L)

390

Steel

Y

Remove all decking material to bare metal

American Walnut Cocoa

Residential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington

First Class Lounge (2-26-1-L)

130

Steel

Y

Remove all decking material to bare metal

American Walnut Cocoa

Residential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington

Crew Lounge (2-47-2-L)

264

Steel

Y

Remove all decking material to bare metal

American Walnut Cocoa

Residential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington

REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 & Follow (AS3100001)

Guard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal

The contractor shall:

  • Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
  • Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:
    • Chair Securing Clamps
  • Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.
  • The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.
  • To minimize distribution to Cutter’s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.
  • Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.
  • Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.
  • In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer’s instruction.
  • The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.
  • The Contractor shall provide and install cove base around entire perimeter of the compartment.
  • Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.
  • Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 16, 2025

    Solicitation

    Due April 25, 2025 at 12:00 AM EDT. SAM.gov, notice 6ccea0b056f845deb92a9b310eb6e45e

    5 revisions on SAM
    • April 21, 2025: publish, solicitation
    • April 17, 2025: publish, solicitation
    • April 17, 2025: publish, solicitation
    • April 16, 2025: publish, solicitation
    • April 16, 2025: publish, solicitation
  2. April 16, 2025

    Solicitation

    Due April 25, 2025 at 12:00 AM EDT. SAM.gov, notice a89c3e619940466792e3eefc7284b973

    5 revisions on SAM
    • April 21, 2025: publish, solicitation
    • April 17, 2025: publish, solicitation
    • April 17, 2025: publish, solicitation
    • April 16, 2025: publish, solicitation
    • April 16, 2025: publish, solicitation
  3. April 17, 2025

    Solicitation

    Due April 25, 2025 at 12:00 AM EDT. SAM.gov, notice 6bcdb4cc69214fa38e218e244a563ce0

    5 revisions on SAM
    • April 21, 2025: publish, solicitation
    • April 17, 2025: publish, solicitation
    • April 17, 2025: publish, solicitation
    • April 16, 2025: publish, solicitation
    • April 16, 2025: publish, solicitation
  4. April 17, 2025

    Solicitation

    Due April 25, 2025 at 12:00 AM EDT. SAM.gov, notice d01179eeea3f4bb5b18846e4cac87372

    5 revisions on SAM
    • April 21, 2025: publish, solicitation
    • April 17, 2025: publish, solicitation
    • April 17, 2025: publish, solicitation
    • April 16, 2025: publish, solicitation
    • April 16, 2025: publish, solicitation
  5. April 21, 2025

    Solicitation

    Due April 25, 2025 at 12:00 AM EDT. SAM.gov, notice 80ec0ff887ff438799642b5dc2e68643

    5 revisions on SAM
    • April 21, 2025: publish, solicitation
    • April 17, 2025: publish, solicitation
    • April 17, 2025: publish, solicitation
    • April 16, 2025: publish, solicitation
    • April 16, 2025: publish, solicitation

Points of contact