USCGC WAESCHE FLOORING UPGRADES
11702PR250000363
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
April 25, 2025 at 12:00 AM EDT
Closed 579 days ago. Posted April 21, 2025, first published April 16, 2025. Scheduled to archive April 25, 2025.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2025
105 like it are open now in ship building and repairing
- USCG STA SAN FRANCISCO (45667) FY27 DD REPAIRS
US Coast Guard, Cg-Sea-C23
Combined synopsis and solicitationSmall businessNAICS 336611San Francisco, CA70ZU0327QSBPL0001Due in 7 daysDec 2 - Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 336611Alameda, CA70Z08527QLREP0001Closes in 12 daysDec 7 - CGC NEAH BAY ANCHOR WINDLASS REPAIRS
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 336611Ship to Cleveland, OH70ZU0227Q0001147Due todayNov 25
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 9 days from the day the solicitation was posted, April 16, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363
Purpose and objective:
CGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew’s Lounge to have finished by June 6th 2025.
Scope: This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.
Table 1 – Decking System
LOCATION
AREA SQ FEET
DECK MTL
COVER BASE
UNDERLAYMENT REQUIREMENT
AMTICO SPACIA DECKING/ SYSTEM COLOR
SUGGESTED SOURCE OF SUPPLY
Officer Wardroom/ Lounge (1-44-2-L)
390
Steel
Y
Remove all decking material to bare metal
American Walnut Cocoa
Residential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington
First Class Lounge (2-26-1-L)
130
Steel
Y
Remove all decking material to bare metal
American Walnut Cocoa
Residential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington
Crew Lounge (2-47-2-L)
264
Steel
Y
Remove all decking material to bare metal
American Walnut Cocoa
Residential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington
REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 & Follow (AS3100001)
Guard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal
The contractor shall:
- Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
- Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:
- Chair Securing Clamps
- Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.
- The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.
- To minimize distribution to Cutter’s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.
- Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.
- Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.
- In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer’s instruction.
- The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.
- The Contractor shall provide and install cove base around entire perimeter of the compartment.
- Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.
- Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Scope of work for Deck Covering.docx26 KB, April 16, 2025
- work deck covering.docx26 KB, April 17, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 16, 2025
Solicitation
Due April 25, 2025 at 12:00 AM EDT. SAM.gov, notice 6ccea0b056f845deb92a9b310eb6e45e
5 revisions on SAM
- April 21, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
- April 16, 2025: publish, solicitation
- April 16, 2025: publish, solicitation
April 16, 2025
Solicitation
Due April 25, 2025 at 12:00 AM EDT. SAM.gov, notice a89c3e619940466792e3eefc7284b973
5 revisions on SAM
- April 21, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
- April 16, 2025: publish, solicitation
- April 16, 2025: publish, solicitation
April 17, 2025
Solicitation
Due April 25, 2025 at 12:00 AM EDT. SAM.gov, notice 6bcdb4cc69214fa38e218e244a563ce0
5 revisions on SAM
- April 21, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
- April 16, 2025: publish, solicitation
- April 16, 2025: publish, solicitation
April 17, 2025
Solicitation
Due April 25, 2025 at 12:00 AM EDT. SAM.gov, notice d01179eeea3f4bb5b18846e4cac87372
5 revisions on SAM
- April 21, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
- April 16, 2025: publish, solicitation
- April 16, 2025: publish, solicitation
April 21, 2025
Solicitation
Due April 25, 2025 at 12:00 AM EDT. SAM.gov, notice 80ec0ff887ff438799642b5dc2e68643
5 revisions on SAM
- April 21, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
- April 16, 2025: publish, solicitation
- April 16, 2025: publish, solicitation