{"canonical":"https://sealedbidder.com/opportunities/11702pr250000363","key":"11702PR250000363","url":"https://sealedbidder.com/opportunities/11702pr250000363","title":"USCGC WAESCHE FLOORING UPGRADES","solicitation_number":"11702PR250000363","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-04-25T04:00:00Z","first_posted":"2025-04-16","last_posted":"2025-04-21","department":"HOMELAND SECURITY, DEPARTMENT OF","subagency":"US COAST GUARD","office":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"2090","set_aside":null,"place_state":"CA","place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":null,"place_county":"06001","place_county_name":"Alameda County","place_city":"0600562","place_city_name":"Alameda","winner":null,"award_amount":null,"publications":[{"notice_id":"6ccea0b056f845deb92a9b310eb6e45e","title":"USCGC WAESCHE FLOORING UPGRADES","solicitation_number":"11702PR250000363","notice_type":"o","base_type":"o","posted":"2025-04-16","posted_at":"2025-04-16T17:36:35.980Z","due_at":"2025-04-25T04:00:00Z","due_date":"2025-04-25","cancelled":false,"archived":true,"archive_date":"2025-04-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6ccea0b056f845deb92a9b310eb6e45e/view","enriched":true,"history":[{"index":6,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T19:38:03.375Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"80ec0ff887ff438799642b5dc2e68643","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":4,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:07:54.890Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d01179eeea3f4bb5b18846e4cac87372","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":3,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:04:41.631Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6bcdb4cc69214fa38e218e244a563ce0","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":2,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T17:36:35.980Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6ccea0b056f845deb92a9b310eb6e45e","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":1,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T16:03:45.788Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a89c3e619940466792e3eefc7284b973","solicitation_number":"11702PR250000363"}]},{"notice_id":"a89c3e619940466792e3eefc7284b973","title":"USCGC WAESCHE FLOORING UPGRADES","solicitation_number":"11702PR250000363","notice_type":"o","base_type":"o","posted":"2025-04-16","posted_at":"2025-04-16T16:03:45.788Z","due_at":"2025-04-25T04:00:00Z","due_date":"2025-04-25","cancelled":false,"archived":true,"archive_date":"2025-04-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a89c3e619940466792e3eefc7284b973/view","enriched":true,"history":[{"index":6,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T19:38:03.375Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"80ec0ff887ff438799642b5dc2e68643","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":4,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:07:54.890Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d01179eeea3f4bb5b18846e4cac87372","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":3,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:04:41.631Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6bcdb4cc69214fa38e218e244a563ce0","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":2,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T17:36:35.980Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6ccea0b056f845deb92a9b310eb6e45e","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":1,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T16:03:45.788Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a89c3e619940466792e3eefc7284b973","solicitation_number":"11702PR250000363"}]},{"notice_id":"6bcdb4cc69214fa38e218e244a563ce0","title":"USCGC WAESCHE FLOORING UPGRADES","solicitation_number":"11702PR250000363","notice_type":"o","base_type":"o","posted":"2025-04-17","posted_at":"2025-04-17T16:04:41.631Z","due_at":"2025-04-25T04:00:00Z","due_date":"2025-04-25","cancelled":false,"archived":true,"archive_date":"2025-04-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6bcdb4cc69214fa38e218e244a563ce0/view","enriched":true,"history":[{"index":6,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T19:38:03.375Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"80ec0ff887ff438799642b5dc2e68643","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":4,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:07:54.890Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d01179eeea3f4bb5b18846e4cac87372","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":3,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:04:41.631Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6bcdb4cc69214fa38e218e244a563ce0","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":2,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T17:36:35.980Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6ccea0b056f845deb92a9b310eb6e45e","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":1,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T16:03:45.788Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a89c3e619940466792e3eefc7284b973","solicitation_number":"11702PR250000363"}]},{"notice_id":"d01179eeea3f4bb5b18846e4cac87372","title":"USCGC WAESCHE FLOORING UPGRADES","solicitation_number":"11702PR250000363","notice_type":"o","base_type":"o","posted":"2025-04-17","posted_at":"2025-04-17T16:07:54.890Z","due_at":"2025-04-25T04:00:00Z","due_date":"2025-04-25","cancelled":false,"archived":true,"archive_date":"2025-04-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d01179eeea3f4bb5b18846e4cac87372/view","enriched":true,"history":[{"index":6,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T19:38:03.375Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"80ec0ff887ff438799642b5dc2e68643","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":4,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:07:54.890Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d01179eeea3f4bb5b18846e4cac87372","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":3,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:04:41.631Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6bcdb4cc69214fa38e218e244a563ce0","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":2,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T17:36:35.980Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6ccea0b056f845deb92a9b310eb6e45e","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":1,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T16:03:45.788Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a89c3e619940466792e3eefc7284b973","solicitation_number":"11702PR250000363"}]},{"notice_id":"80ec0ff887ff438799642b5dc2e68643","title":"USCGC WAESCHE FLOORING UPGRADES","solicitation_number":"11702PR250000363","notice_type":"o","base_type":"o","posted":"2025-04-21","posted_at":"2025-04-21T19:38:03.375Z","due_at":"2025-04-25T04:00:00Z","due_date":"2025-04-25","cancelled":false,"archived":true,"archive_date":"2025-04-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/80ec0ff887ff438799642b5dc2e68643/view","enriched":true,"history":[{"index":6,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T19:38:03.375Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"80ec0ff887ff438799642b5dc2e68643","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":4,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:07:54.890Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d01179eeea3f4bb5b18846e4cac87372","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":3,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:04:41.631Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6bcdb4cc69214fa38e218e244a563ce0","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":2,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T17:36:35.980Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6ccea0b056f845deb92a9b310eb6e45e","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":1,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T16:03:45.788Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a89c3e619940466792e3eefc7284b973","solicitation_number":"11702PR250000363"}]}],"latest_notice_id":"80ec0ff887ff438799642b5dc2e68643","first_type":"o","notices":[{"dates":{"posted":"2025-04-16","posted_at":"2025-04-16T17:36:35.980Z","created_at":"2025-04-16T17:34:47.975Z","modified_at":"2025-04-26T04:00:32.244Z","response_deadline":{"raw":"2025-04-25T00:00:00-04:00","utc":"2025-04-25T04:00:00Z","date":"2025-04-25","time":"00:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6ccea0b056f845deb92a9b310eb6e45e/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"USCGC WAESCHE FLOORING UPGRADES","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-25","archive_type":"auto_custom"},"history":[{"index":6,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T19:38:03.375Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"80ec0ff887ff438799642b5dc2e68643","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":4,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:07:54.890Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d01179eeea3f4bb5b18846e4cac87372","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":3,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:04:41.631Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6bcdb4cc69214fa38e218e244a563ce0","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":2,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T17:36:35.980Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6ccea0b056f845deb92a9b310eb6e45e","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":1,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T16:03:45.788Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a89c3e619940466792e3eefc7284b973","solicitation_number":"11702PR250000363"}],"contacts":[{"name":"Aaron Benson","role":"primary","email":"aaron.d.benson@uscg.mil"},{"name":"Julia VanLuven","role":"secondary","email":"Julia.L.Vanluven@uscg.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"6ccea0b056f845deb92a9b310eb6e45e","lineage_id":"a89c3e619940466792e3eefc7284b973","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T11:03:22.091789240Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"6faadb7119ded054178028381f0b6a6e2f763c39f5fa7e1d7a123d38b5deb293","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T11:03:22.091789240Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363</p>\n\n<p></p>\n\n<p><strong><u>Purpose and objective:</u></strong></p>\n\n<p>CGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew&rsquo;s Lounge to have finished by June 13th, 2025.</p>\n\n<p></p>\n\n<p><strong><u>Scope:</u></strong> This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.</p>\n\n<p></p>\n\n<p>Table 1 &ndash; Decking System</p>\n\n<p><strong>LOCATION</strong></p>\n\n<p><strong>AREA SQ FEET</strong></p>\n\n<p><strong>DECK MTL</strong></p>\n\n<p><strong>COVER BASE</strong></p>\n\n<p><strong>UNDERLAYMENT REQUIREMENT</strong></p>\n\n<p><strong>AMTICO SPACIA DECKING/ SYSTEM COLOR</strong></p>\n\n<p><strong>SUGGESTED SOURCE OF SUPPLY</strong></p>\n\n<p><strong>Officer Wardroom/ Lounge (1-44-2-L)</strong></p>\n\n<p>390</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>First Class Lounge (2-26-1-L)</strong></p>\n\n<p>130</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>Crew Lounge (2-47-2-L)</strong></p>\n\n<p>264</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>REFERENCES</strong></p>\n\n<p><strong>COAST GUARD DRAWINGS</strong></p>\n\n<p>Coast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 &amp; Follow (AS3100001)</p>\n\n<p></p>\n\n<p>Guard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)</p>\n\n<p><strong>COAST GUARD PUBLICATIONS</strong></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems</p>\n\n<p></p>\n\n<p>The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong><u>The contractor shall: </u></strong></p>\n\n<ul>\n\t<li>Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel&#39;s components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.</li>\n\t<li>Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\t<ul>\n\t\t<li>Chair Securing Clamps</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.</li>\n\t<li>The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.</li>\n\t<li>To minimize distribution to Cutter&rsquo;s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.</li>\n\t<li>Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.</li>\n\t<li>Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.</li>\n\t<li>In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer&rsquo;s instruction.</li>\n\t<li>The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.</li>\n\t<li>The Contractor shall provide and install cove base around entire perimeter of the compartment.</li>\n\t<li>Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.</li>\n\t<li>Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.</li>\n</ul>\n\n<p></p>\n\n<p></p>","text":"Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363\n\nPurpose and objective:\n\nCGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew’s Lounge to have finished by June 13th, 2025.\n\nScope: This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.\n\nTable 1 – Decking System\n\nLOCATION\n\nAREA SQ FEET\n\nDECK MTL\n\nCOVER BASE\n\nUNDERLAYMENT REQUIREMENT\n\nAMTICO SPACIA DECKING/ SYSTEM COLOR\n\nSUGGESTED SOURCE OF SUPPLY\n\nOfficer Wardroom/ Lounge (1-44-2-L)\n\n390\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nFirst Class Lounge (2-26-1-L)\n\n130\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nCrew Lounge (2-47-2-L)\n\n264\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nREFERENCES\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 & Follow (AS3100001)\n\nGuard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements\n\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures\n\nSurface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems\n\nThe Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal\n\nThe contractor shall:\n\n• Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.\n\n• Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\n• Chair Securing Clamps\n\n• Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.\n\n• The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.\n\n• To minimize distribution to Cutter’s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.\n\n• Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.\n\n• Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.\n\n• In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer’s instruction.\n\n• The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.\n\n• The Contractor shall provide and install cove base around entire perimeter of the compartment.\n\n• Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.\n\n• Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"11702PR250000363","place_of_performance":{"zip":"94501","city":{"code":"562","name":"Alameda"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"2090"},{"dates":{"posted":"2025-04-16","posted_at":"2025-04-16T16:03:45.788Z","created_at":"2025-04-15T15:08:29.897Z","modified_at":"2025-04-26T04:00:32.244Z","response_deadline":{"raw":"2025-04-25T00:00:00-04:00","utc":"2025-04-25T04:00:00Z","date":"2025-04-25","time":"00:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a89c3e619940466792e3eefc7284b973/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"USCGC WAESCHE FLOORING UPGRADES","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-25","archive_type":"auto_custom"},"history":[{"index":6,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T19:38:03.375Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"80ec0ff887ff438799642b5dc2e68643","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":4,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:07:54.890Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d01179eeea3f4bb5b18846e4cac87372","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":3,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:04:41.631Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6bcdb4cc69214fa38e218e244a563ce0","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":2,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T17:36:35.980Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6ccea0b056f845deb92a9b310eb6e45e","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":1,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T16:03:45.788Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a89c3e619940466792e3eefc7284b973","solicitation_number":"11702PR250000363"}],"contacts":[{"name":"Julia VanLuven","role":"primary","email":"Julia.L.Vanluven@uscg.mil"},{"name":"Travis Van Orden","role":"secondary","email":"travis.t.vanorden@uscg.mil","phone":"5104375902"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a89c3e619940466792e3eefc7284b973","lineage_id":"a89c3e619940466792e3eefc7284b973","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T11:24:10.062952351Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"24c46a05e9b468a528d1f23080fb1e2c3b2969d4f67942d8aa4a42edff7f8793","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T11:24:10.062952351Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363</p>\n\n<p></p>\n\n<p><strong><u>Purpose and objective:</u></strong></p>\n\n<p>CGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew&rsquo;s Lounge to have finished by June 13th, 2025.</p>\n\n<p></p>\n\n<p><strong><u>Scope:</u></strong> This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.</p>\n\n<p></p>\n\n<p>Table 1 &ndash; Decking System</p>\n\n<p><strong>LOCATION</strong></p>\n\n<p><strong>AREA SQ FEET</strong></p>\n\n<p><strong>DECK MTL</strong></p>\n\n<p><strong>COVER BASE</strong></p>\n\n<p><strong>UNDERLAYMENT REQUIREMENT</strong></p>\n\n<p><strong>AMTICO SPACIA DECKING/ SYSTEM COLOR</strong></p>\n\n<p><strong>SUGGESTED SOURCE OF SUPPLY</strong></p>\n\n<p><strong>Officer Wardroom/ Lounge (1-44-2-L)</strong></p>\n\n<p>390</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>First Class Lounge (2-26-1-L)</strong></p>\n\n<p>130</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>Crew Lounge (2-47-2-L)</strong></p>\n\n<p>264</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>REFERENCES</strong></p>\n\n<p><strong>COAST GUARD DRAWINGS</strong></p>\n\n<p>Coast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 &amp; Follow (AS3100001)</p>\n\n<p></p>\n\n<p>Guard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)</p>\n\n<p><strong>COAST GUARD PUBLICATIONS</strong></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems</p>\n\n<p></p>\n\n<p>The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong><u>The contractor shall: </u></strong></p>\n\n<ul>\n\t<li>Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel&#39;s components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.</li>\n\t<li>Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\t<ul>\n\t\t<li>Chair Securing Clamps</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.</li>\n\t<li>The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.</li>\n\t<li>To minimize distribution to Cutter&rsquo;s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.</li>\n\t<li>Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.</li>\n\t<li>Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.</li>\n\t<li>In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer&rsquo;s instruction.</li>\n\t<li>The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.</li>\n\t<li>The Contractor shall provide and install cove base around entire perimeter of the compartment.</li>\n\t<li>Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.</li>\n\t<li>Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.</li>\n</ul>\n\n<p></p>\n\n<p></p>","text":"Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363\n\nPurpose and objective:\n\nCGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew’s Lounge to have finished by June 13th, 2025.\n\nScope: This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.\n\nTable 1 – Decking System\n\nLOCATION\n\nAREA SQ FEET\n\nDECK MTL\n\nCOVER BASE\n\nUNDERLAYMENT REQUIREMENT\n\nAMTICO SPACIA DECKING/ SYSTEM COLOR\n\nSUGGESTED SOURCE OF SUPPLY\n\nOfficer Wardroom/ Lounge (1-44-2-L)\n\n390\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nFirst Class Lounge (2-26-1-L)\n\n130\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nCrew Lounge (2-47-2-L)\n\n264\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nREFERENCES\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 & Follow (AS3100001)\n\nGuard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements\n\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures\n\nSurface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems\n\nThe Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal\n\nThe contractor shall:\n\n• Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.\n\n• Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\n• Chair Securing Clamps\n\n• Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.\n\n• The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.\n\n• To minimize distribution to Cutter’s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.\n\n• Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.\n\n• Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.\n\n• In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer’s instruction.\n\n• The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.\n\n• The Contractor shall provide and install cove base around entire perimeter of the compartment.\n\n• Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.\n\n• Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"11702PR250000363","place_of_performance":{"zip":"94501","city":{"code":"562","name":"Alameda"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"2090"},{"dates":{"posted":"2025-04-17","posted_at":"2025-04-17T16:04:41.631Z","created_at":"2025-04-17T16:01:45.756Z","modified_at":"2025-04-26T04:00:32.244Z","response_deadline":{"raw":"2025-04-25T00:00:00-04:00","utc":"2025-04-25T04:00:00Z","date":"2025-04-25","time":"00:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6bcdb4cc69214fa38e218e244a563ce0/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"USCGC WAESCHE FLOORING UPGRADES","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-25","archive_type":"auto_custom"},"history":[{"index":6,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T19:38:03.375Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"80ec0ff887ff438799642b5dc2e68643","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":4,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:07:54.890Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d01179eeea3f4bb5b18846e4cac87372","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":3,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:04:41.631Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6bcdb4cc69214fa38e218e244a563ce0","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":2,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T17:36:35.980Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6ccea0b056f845deb92a9b310eb6e45e","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":1,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T16:03:45.788Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a89c3e619940466792e3eefc7284b973","solicitation_number":"11702PR250000363"}],"contacts":[{"name":"Aaron Benson","role":"primary","email":"aaron.d.benson@uscg.mil"},{"name":"Julia VanLuven","role":"secondary","email":"Julia.L.Vanluven@uscg.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"6bcdb4cc69214fa38e218e244a563ce0","lineage_id":"a89c3e619940466792e3eefc7284b973","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T09:34:23.449202330Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"ce82f5ad1312ead4eb0466be935497740996431c5389a96d78e3378066380de2","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T09:34:23.449202330Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363</p>\n\n<p></p>\n\n<p><strong><u>Purpose and objective:</u></strong></p>\n\n<p>CGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew&rsquo;s Lounge to have finished by June 13th, 2025.</p>\n\n<p></p>\n\n<p><strong><u>Scope:</u></strong> This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.</p>\n\n<p></p>\n\n<p>Table 1 &ndash; Decking System</p>\n\n<p><strong>LOCATION</strong></p>\n\n<p><strong>AREA SQ FEET</strong></p>\n\n<p><strong>DECK MTL</strong></p>\n\n<p><strong>COVER BASE</strong></p>\n\n<p><strong>UNDERLAYMENT REQUIREMENT</strong></p>\n\n<p><strong>AMTICO SPACIA DECKING/ SYSTEM COLOR</strong></p>\n\n<p><strong>SUGGESTED SOURCE OF SUPPLY</strong></p>\n\n<p><strong>Officer Wardroom/ Lounge (1-44-2-L)</strong></p>\n\n<p>390</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>First Class Lounge (2-26-1-L)</strong></p>\n\n<p>130</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>Crew Lounge (2-47-2-L)</strong></p>\n\n<p>264</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>REFERENCES</strong></p>\n\n<p><strong>COAST GUARD DRAWINGS</strong></p>\n\n<p>Coast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 &amp; Follow (AS3100001)</p>\n\n<p></p>\n\n<p>Guard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)</p>\n\n<p><strong>COAST GUARD PUBLICATIONS</strong></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems</p>\n\n<p></p>\n\n<p>The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong><u>The contractor shall: </u></strong></p>\n\n<ul>\n\t<li>Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel&#39;s components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.</li>\n\t<li>Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\t<ul>\n\t\t<li>Chair Securing Clamps</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.</li>\n\t<li>The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.</li>\n\t<li>To minimize distribution to Cutter&rsquo;s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.</li>\n\t<li>Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.</li>\n\t<li>Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.</li>\n\t<li>In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer&rsquo;s instruction.</li>\n\t<li>The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.</li>\n\t<li>The Contractor shall provide and install cove base around entire perimeter of the compartment.</li>\n\t<li>Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.</li>\n\t<li>Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.</li>\n</ul>\n\n<p></p>\n\n<p></p>","text":"Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363\n\nPurpose and objective:\n\nCGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew’s Lounge to have finished by June 13th, 2025.\n\nScope: This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.\n\nTable 1 – Decking System\n\nLOCATION\n\nAREA SQ FEET\n\nDECK MTL\n\nCOVER BASE\n\nUNDERLAYMENT REQUIREMENT\n\nAMTICO SPACIA DECKING/ SYSTEM COLOR\n\nSUGGESTED SOURCE OF SUPPLY\n\nOfficer Wardroom/ Lounge (1-44-2-L)\n\n390\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nFirst Class Lounge (2-26-1-L)\n\n130\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nCrew Lounge (2-47-2-L)\n\n264\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nREFERENCES\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 & Follow (AS3100001)\n\nGuard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements\n\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures\n\nSurface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems\n\nThe Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal\n\nThe contractor shall:\n\n• Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.\n\n• Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\n• Chair Securing Clamps\n\n• Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.\n\n• The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.\n\n• To minimize distribution to Cutter’s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.\n\n• Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.\n\n• Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.\n\n• In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer’s instruction.\n\n• The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.\n\n• The Contractor shall provide and install cove base around entire perimeter of the compartment.\n\n• Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.\n\n• Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"11702PR250000363","place_of_performance":{"zip":"94501","city":{"code":"562","name":"Alameda"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"2090"},{"dates":{"posted":"2025-04-17","posted_at":"2025-04-17T16:07:54.890Z","created_at":"2025-04-17T16:07:43.306Z","modified_at":"2025-04-26T04:00:32.244Z","response_deadline":{"raw":"2025-04-25T00:00:00-04:00","utc":"2025-04-25T04:00:00Z","date":"2025-04-25","time":"00:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d01179eeea3f4bb5b18846e4cac87372/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"USCGC WAESCHE FLOORING UPGRADES","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-25","archive_type":"auto_custom"},"history":[{"index":6,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T19:38:03.375Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"80ec0ff887ff438799642b5dc2e68643","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":4,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:07:54.890Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d01179eeea3f4bb5b18846e4cac87372","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":3,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:04:41.631Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6bcdb4cc69214fa38e218e244a563ce0","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":2,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T17:36:35.980Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6ccea0b056f845deb92a9b310eb6e45e","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":1,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T16:03:45.788Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a89c3e619940466792e3eefc7284b973","solicitation_number":"11702PR250000363"}],"contacts":[{"name":"Aaron Benson","role":"primary","email":"aaron.d.benson@uscg.mil"},{"name":"Julia VanLuven","role":"secondary","email":"Julia.L.Vanluven@uscg.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d01179eeea3f4bb5b18846e4cac87372","lineage_id":"a89c3e619940466792e3eefc7284b973","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T10:02:47.090203927Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"040eeacb174a4cc9496fc47a9ee62967ca16a37a119b385e29de24eaf1b52691","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T10:02:47.090203927Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363</p>\n\n<p></p>\n\n<p><strong><u>Purpose and objective:</u></strong></p>\n\n<p>CGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew&rsquo;s Lounge to have finished by June 13th, 2025.</p>\n\n<p></p>\n\n<p><strong><u>Scope:</u></strong> This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.</p>\n\n<p></p>\n\n<p>Table 1 &ndash; Decking System</p>\n\n<p><strong>LOCATION</strong></p>\n\n<p><strong>AREA SQ FEET</strong></p>\n\n<p><strong>DECK MTL</strong></p>\n\n<p><strong>COVER BASE</strong></p>\n\n<p><strong>UNDERLAYMENT REQUIREMENT</strong></p>\n\n<p><strong>AMTICO SPACIA DECKING/ SYSTEM COLOR</strong></p>\n\n<p><strong>SUGGESTED SOURCE OF SUPPLY</strong></p>\n\n<p><strong>Officer Wardroom/ Lounge (1-44-2-L)</strong></p>\n\n<p>390</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>First Class Lounge (2-26-1-L)</strong></p>\n\n<p>130</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>Crew Lounge (2-47-2-L)</strong></p>\n\n<p>264</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>REFERENCES</strong></p>\n\n<p><strong>COAST GUARD DRAWINGS</strong></p>\n\n<p>Coast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 &amp; Follow (AS3100001)</p>\n\n<p></p>\n\n<p>Guard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)</p>\n\n<p><strong>COAST GUARD PUBLICATIONS</strong></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems</p>\n\n<p></p>\n\n<p>The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong><u>The contractor shall: </u></strong></p>\n\n<ul>\n\t<li>Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel&#39;s components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.</li>\n\t<li>Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\t<ul>\n\t\t<li>Chair Securing Clamps</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.</li>\n\t<li>The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.</li>\n\t<li>To minimize distribution to Cutter&rsquo;s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.</li>\n\t<li>Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.</li>\n\t<li>Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.</li>\n\t<li>In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer&rsquo;s instruction.</li>\n\t<li>The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.</li>\n\t<li>The Contractor shall provide and install cove base around entire perimeter of the compartment.</li>\n\t<li>Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.</li>\n\t<li>Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.</li>\n</ul>\n\n<p></p>\n\n<p></p>","text":"Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363\n\nPurpose and objective:\n\nCGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew’s Lounge to have finished by June 13th, 2025.\n\nScope: This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.\n\nTable 1 – Decking System\n\nLOCATION\n\nAREA SQ FEET\n\nDECK MTL\n\nCOVER BASE\n\nUNDERLAYMENT REQUIREMENT\n\nAMTICO SPACIA DECKING/ SYSTEM COLOR\n\nSUGGESTED SOURCE OF SUPPLY\n\nOfficer Wardroom/ Lounge (1-44-2-L)\n\n390\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nFirst Class Lounge (2-26-1-L)\n\n130\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nCrew Lounge (2-47-2-L)\n\n264\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nREFERENCES\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 & Follow (AS3100001)\n\nGuard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements\n\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures\n\nSurface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems\n\nThe Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal\n\nThe contractor shall:\n\n• Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.\n\n• Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\n• Chair Securing Clamps\n\n• Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.\n\n• The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.\n\n• To minimize distribution to Cutter’s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.\n\n• Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.\n\n• Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.\n\n• In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer’s instruction.\n\n• The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.\n\n• The Contractor shall provide and install cove base around entire perimeter of the compartment.\n\n• Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.\n\n• Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"11702PR250000363","place_of_performance":{"zip":"94501","city":{"code":"562","name":"Alameda"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"2090"},{"dates":{"posted":"2025-04-21","posted_at":"2025-04-21T19:38:03.375Z","created_at":"2025-04-21T19:37:26.951Z","modified_at":"2025-04-26T04:00:32.244Z","response_deadline":{"raw":"2025-04-25T00:00:00-04:00","utc":"2025-04-25T04:00:00Z","date":"2025-04-25","time":"00:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/80ec0ff887ff438799642b5dc2e68643/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"USCGC WAESCHE FLOORING UPGRADES","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-25","archive_type":"auto_custom"},"history":[{"index":6,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T19:38:03.375Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"80ec0ff887ff438799642b5dc2e68643","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":4,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:07:54.890Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d01179eeea3f4bb5b18846e4cac87372","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":3,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T16:04:41.631Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6bcdb4cc69214fa38e218e244a563ce0","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":2,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T17:36:35.980Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6ccea0b056f845deb92a9b310eb6e45e","solicitation_number":"11702PR250000363","parent_opportunity_id":"a89c3e619940466792e3eefc7284b973"},{"index":1,"title":"USCGC WAESCHE FLOORING UPGRADES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-16T16:03:45.788Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a89c3e619940466792e3eefc7284b973","solicitation_number":"11702PR250000363"}],"contacts":[{"name":"Aaron Benson","role":"primary","email":"aaron.d.benson@uscg.mil"},{"name":"Julia VanLuven","role":"secondary","email":"Julia.L.Vanluven@uscg.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"80ec0ff887ff438799642b5dc2e68643","lineage_id":"a89c3e619940466792e3eefc7284b973","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T04:07:04.253390043Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"aae66996f066ff99033e20884ce891e9b3c39883845aae79c07e72b5de8873fc","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T04:07:04.253390043Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363</p>\n\n<p></p>\n\n<p><strong><u>Purpose and objective:</u></strong></p>\n\n<p>CGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew&rsquo;s Lounge to have finished by June 6th 2025.</p>\n\n<p></p>\n\n<p><strong><u>Scope:</u></strong> This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.</p>\n\n<p></p>\n\n<p>Table 1 &ndash; Decking System</p>\n\n<p><strong>LOCATION</strong></p>\n\n<p><strong>AREA SQ FEET</strong></p>\n\n<p><strong>DECK MTL</strong></p>\n\n<p><strong>COVER BASE</strong></p>\n\n<p><strong>UNDERLAYMENT REQUIREMENT</strong></p>\n\n<p><strong>AMTICO SPACIA DECKING/ SYSTEM COLOR</strong></p>\n\n<p><strong>SUGGESTED SOURCE OF SUPPLY</strong></p>\n\n<p><strong>Officer Wardroom/ Lounge (1-44-2-L)</strong></p>\n\n<p>390</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>First Class Lounge (2-26-1-L)</strong></p>\n\n<p>130</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>Crew Lounge (2-47-2-L)</strong></p>\n\n<p>264</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>REFERENCES</strong></p>\n\n<p><strong>COAST GUARD DRAWINGS</strong></p>\n\n<p>Coast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 &amp; Follow (AS3100001)</p>\n\n<p></p>\n\n<p>Guard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)</p>\n\n<p><strong>COAST GUARD PUBLICATIONS</strong></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems</p>\n\n<p></p>\n\n<p>The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong><u>The contractor shall: </u></strong></p>\n\n<ul>\n\t<li>Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel&#39;s components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.</li>\n\t<li>Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\t<ul>\n\t\t<li>Chair Securing Clamps</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.</li>\n\t<li>The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.</li>\n\t<li>To minimize distribution to Cutter&rsquo;s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.</li>\n\t<li>Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.</li>\n\t<li>Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.</li>\n\t<li>In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer&rsquo;s instruction.</li>\n\t<li>The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.</li>\n\t<li>The Contractor shall provide and install cove base around entire perimeter of the compartment.</li>\n\t<li>Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.</li>\n\t<li>Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.</li>\n</ul>\n\n<p></p>\n\n<p></p>","text":"Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363\n\nPurpose and objective:\n\nCGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew’s Lounge to have finished by June 6th 2025.\n\nScope: This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.\n\nTable 1 – Decking System\n\nLOCATION\n\nAREA SQ FEET\n\nDECK MTL\n\nCOVER BASE\n\nUNDERLAYMENT REQUIREMENT\n\nAMTICO SPACIA DECKING/ SYSTEM COLOR\n\nSUGGESTED SOURCE OF SUPPLY\n\nOfficer Wardroom/ Lounge (1-44-2-L)\n\n390\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nFirst Class Lounge (2-26-1-L)\n\n130\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nCrew Lounge (2-47-2-L)\n\n264\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nREFERENCES\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 & Follow (AS3100001)\n\nGuard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements\n\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures\n\nSurface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems\n\nThe Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal\n\nThe contractor shall:\n\n• Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.\n\n• Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\n• Chair Securing Clamps\n\n• Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.\n\n• The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.\n\n• To minimize distribution to Cutter’s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.\n\n• Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.\n\n• Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.\n\n• In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer’s instruction.\n\n• The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.\n\n• The Contractor shall provide and install cove base around entire perimeter of the compartment.\n\n• Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.\n\n• Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"11702PR250000363","place_of_performance":{"zip":"94501","city":{"code":"562","name":"Alameda"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"2090"}],"due_at":"2025-04-25T04:00:00Z","due_date":"2025-04-25","closes_at":"2025-04-25T04:00:00Z","awardable":true,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","state":"CA","county":"06001","county_name":"Alameda County","city":"0600562","city_name":"Alameda","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-17T04:42:47.571825Z","principal_notice_id":"80ec0ff887ff438799642b5dc2e68643","description":{"text":"Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363\n\nPurpose and objective:\n\nCGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew’s Lounge to have finished by June 6th 2025.\n\nScope: This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.\n\nTable 1 – Decking System\n\nLOCATION\n\nAREA SQ FEET\n\nDECK MTL\n\nCOVER BASE\n\nUNDERLAYMENT REQUIREMENT\n\nAMTICO SPACIA DECKING/ SYSTEM COLOR\n\nSUGGESTED SOURCE OF SUPPLY\n\nOfficer Wardroom/ Lounge (1-44-2-L)\n\n390\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nFirst Class Lounge (2-26-1-L)\n\n130\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nCrew Lounge (2-47-2-L)\n\n264\n\nSteel\n\nY\n\nRemove all decking material to bare metal\n\nAmerican Walnut Cocoa\n\nResidential Luxury Vinyl, Laminate & Hardwood Flooring | Mannington\n\nREFERENCES\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 & Follow (AS3100001)\n\nGuard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements\n\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures\n\nSurface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems\n\nThe Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal\n\nThe contractor shall:\n\n• Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.\n\n• Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\n• Chair Securing Clamps\n\n• Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.\n\n• The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.\n\n• To minimize distribution to Cutter’s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.\n\n• Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.\n\n• Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.\n\n• In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer’s instruction.\n\n• The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.\n\n• The Contractor shall provide and install cove base around entire perimeter of the compartment.\n\n• Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.\n\n• Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.","html":"<p>Scope of work for Deck Covering, Vinyl, Demolition and Replace PR #11702PR250000363</p>\n\n<p></p>\n\n<p><strong><u>Purpose and objective:</u></strong></p>\n\n<p>CGC WAESCHE seeks to purchase materials and service for flooring upgrades to the Wardroom, First Class Lounge, and Crew&rsquo;s Lounge to have finished by June 6th 2025.</p>\n\n<p></p>\n\n<p><strong><u>Scope:</u></strong> This work item describes the requirements for the Contractor to replace deck flooring as identified in Table 1 with Mannington from Amtico Spacia Decking.</p>\n\n<p></p>\n\n<p>Table 1 &ndash; Decking System</p>\n\n<p><strong>LOCATION</strong></p>\n\n<p><strong>AREA SQ FEET</strong></p>\n\n<p><strong>DECK MTL</strong></p>\n\n<p><strong>COVER BASE</strong></p>\n\n<p><strong>UNDERLAYMENT REQUIREMENT</strong></p>\n\n<p><strong>AMTICO SPACIA DECKING/ SYSTEM COLOR</strong></p>\n\n<p><strong>SUGGESTED SOURCE OF SUPPLY</strong></p>\n\n<p><strong>Officer Wardroom/ Lounge (1-44-2-L)</strong></p>\n\n<p>390</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>First Class Lounge (2-26-1-L)</strong></p>\n\n<p>130</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>Crew Lounge (2-47-2-L)</strong></p>\n\n<p>264</p>\n\n<p>Steel</p>\n\n<p>Y</p>\n\n<p>Remove all decking material to bare metal</p>\n\n<p>American Walnut Cocoa</p>\n\n<p>Residential Luxury Vinyl, Laminate &amp; Hardwood Flooring | Mannington</p>\n\n<p><strong>REFERENCES</strong></p>\n\n<p><strong>COAST GUARD DRAWINGS</strong></p>\n\n<p>Coast Guard Drawing 750-WMSL 100-60, Rev C, General Arrangements Hull 3 &amp; Follow (AS3100001)</p>\n\n<p></p>\n\n<p>Guard Drawing 750-WMSL 640-4, Rev -, Arrangements of Living Spaces (ASC640001)</p>\n\n<p><strong>COAST GUARD PUBLICATIONS</strong></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures</p>\n\n<p></p>\n\n<p>Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2012, Install Interior Deck Covering Systems</p>\n\n<p></p>\n\n<p>The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP11), 2004, Power Tool Cleaning to Bare Metal</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong><u>The contractor shall: </u></strong></p>\n\n<ul>\n\t<li>Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel&#39;s components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.</li>\n\t<li>Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\t<ul>\n\t\t<li>Chair Securing Clamps</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>Visual inspection. The Contractor shall perform a visual inspection of all existing underlayment following vinyl and carpet removal. Submit a CFR.</li>\n\t<li>The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1.</li>\n\t<li>To minimize distribution to Cutter&rsquo;s personnel, the Contractor shall propose a work plan to the Coast Guard Inspector.</li>\n\t<li>Removal. The Contractor shall remove and dispose existing vinyl and carpet and cove base in accordance with SFLC Std Spec 0000 and SFLC Std Spec 6341 at the location specified in the Table 1.</li>\n\t<li>Cleaning. Power tool clean to bare metal all steel decks in the work areas in accordance with SSPCSP11 (or SSPC-SP 10/NACE No. 2 with dust control). Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants.</li>\n\t<li>In the presence of the Coast Guard Inspector, conduct a visual inspection of the clean deck in the work area for corrosion and deterioration. Submit a CFR to the Coast Guard Inspector.3.3 Vinyl strip Amtico Specia installation. The Contractor shall install Vinyl strip Amtico Specia system at the location specified in Table 1. The Contractor shall prepare existing deck surfaces for Vinyl strip Amtico Specia installation in accordance with SFLC Std Spec 6341 and manufacturer&rsquo;s instruction.</li>\n\t<li>The Contractor shall provide and install self level underlayment to achieve level foundation. Underlayment shall be installed so that all installed deck fittings are flush with final decking.</li>\n\t<li>The Contractor shall provide and install cove base around entire perimeter of the compartment.</li>\n\t<li>Cove base. Install cove base molding at corners between deck and bulkhead in the work areas specified in Table 1 where applicable in accordance with SFLC Std Spec 6341. Unless otherwise specified, apply caulking compound at other corners.</li>\n\t<li>Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec) 6310. Abide by all touch-up requirements outlined in SFLC Std Spec) 6310.</li>\n</ul>\n\n<p></p>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"Aaron Benson","role":"primary","email":"aaron.d.benson@uscg.mil"},{"name":"Julia VanLuven","role":"secondary","email":"Julia.L.Vanluven@uscg.mil"}],"place_of_performance":{"zip":"94501","city":{"code":"562","name":"Alameda"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"naics_codes":["336611"],"award":null,"attachments":[{"resource_id":"5718f0cc381448e79fcca182e144c3ea","name":"Scope of work for Deck Covering.docx","kind":"file","mime_type":".docx","size_bytes":26346,"posted_at":"2025-04-16T16:03:45.788Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5718f0cc381448e79fcca182e144c3ea/download","mirrored":false},{"resource_id":"2cd57b66a1674dcbb83ca0928054859b","name":"work deck covering.docx","kind":"file","mime_type":".docx","size_bytes":26404,"posted_at":"2025-04-17T16:04:41.631Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2cd57b66a1674dcbb83ca0928054859b/download","mirrored":false}],"awards":[],"related":[{"key":"70Z08526RRJ001B00","latest_notice_id":"79adb3e9f10f4bceafdeca530cb99fdf","title":"TRS-3D /AN/SPS-75 Radar repairs/ overhaul services","solicitation_number":"70Z08526RRJ001B00","notice_type":"o","first_type":"o","first_posted":"2026-07-15","last_posted":"2026-11-19","notices":8,"due_at":"2026-12-01T17:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"811210","psc":"J059","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"70Z08526Q39002B00","latest_notice_id":"c2c828ffaf9848a1a975736420ad55cf","title":"ACTUATOR,GOVERNOR","solicitation_number":"70Z08526Q39002B00","notice_type":"o","first_type":"o","first_posted":"2025-12-10","last_posted":"2025-12-10","notices":1,"due_at":"2026-12-19T16:00:00Z","due_date":"2026-12-19","closes_at":"2026-12-19T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"2990","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 2990)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"}],"similar_open":[{"key":"70ZU0327QSBPL0001","latest_notice_id":"86223c5b494f4fd48dd67b18168a18c0","title":"USCG STA SAN FRANCISCO (45667) FY27 DD REPAIRS","solicitation_number":"70ZU0327QSBPL0001","notice_type":"k","first_type":"k","first_posted":"2026-11-02","last_posted":"2026-11-02","notices":1,"due_at":"2026-12-02T19:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70ZU03","office_name":"CG-SEA-C23","naics":"336611","psc":"J999","set_aside":"SBA","state":"CA","county":"06075","county_name":"San Francisco County","city":"0667000","city_name":"San Francisco","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-03T04:52:39.433634Z"},{"key":"70Z08527QLREP0001","latest_notice_id":"a152115a32dd4be7be92f00a0e46c083","title":"Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair","solicitation_number":"70Z08527QLREP0001","notice_type":"k","first_type":"k","first_posted":"2026-11-12","last_posted":"2026-11-24","notices":3,"due_at":"2026-12-07T20:30:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70ZU02","office_name":"CG-SEA-C22","naics":"336611","psc":"J999","set_aside":"SBA","state":"CA","county":"06001","county_name":"Alameda County","city":"0600562","city_name":"Alameda","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"70ZU0227Q0001147","latest_notice_id":"2773e8d114d34eef8aea000151f1e601","title":"CGC NEAH BAY ANCHOR WINDLASS REPAIRS","solicitation_number":"70ZU0227Q0001147","notice_type":"k","first_type":"k","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-25T16:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70ZU02","office_name":"CG-SEA-C22","naics":"336611","psc":"2030","set_aside":"SBA","state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"}],"similar_open_total":105,"indexable":false}