Presolicitation, total small business set-aside
CES Expansion UPS Upgrade
038315
Department of the Army, W7M6 Uspfo Activity Il Arng. Commercial and Institutional Building Construction.
Response deadline
July 23, 2026 at 12:00 PM EDT
Closed 125 days ago. Posted July 8, 2026, first published July 8, 2026. Scheduled to archive August 7, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
188 like it are open now in commercial and institutional building construction
- Repair Building Systems (Peoria, IL)
Agricultural Research Service, USDA ARS Afm Apd
Combined synopsis and solicitationSmall businessNAICS 236220Peoria, IL1232SA27Q0003Due in 7 daysDec 2 - 550-20-121 Demo Old Boiler Plant B100 (CON)
Department of Veterans Affairs, 252-Network Contract Office 12
SolicitationSDVOSBNAICS 236220Danville, IL36C25227B0002-0001Due in 7 daysDec 2 - Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade
Department of Energy, Fermilab - DOE Contractor
SolicitationSmall businessNAICS 236220Illinois385515GMKCloses in 14 daysDec 9
All 188 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation has been published under this number yet. The presolicitation of July 8, 2026 is the earliest notice of the purchase.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Estimated Solicitation posting - Last week of July
Estimated Site Visit - First week of August (usually a Tuesday or Thursday, 1pm).
A Draft Statement of Work (SOW) is attached to this notice for planning and market research purposes only. Do not submit formal quotes at this time.
1. PROJECT DESCRIPTION
The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8.
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system.
Key scope items include:
- Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard.
- Site and electrical preparation for the new system.
- Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion).
- Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings.
- Full system adjustments, load balancing, and operational testing by factory-trained field service personnel.
Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP).
2. BRAND NAME OR EQUAL
This requirement will be solicited as "Brand Name or Equal" for a system similar to the Vertiv Liebert Model APM2 with modular and scalable architecture. The forthcoming solicitation will explicitly list the salient characteristics that any proposed "equal" equipment must meet to be considered acceptable.
3. MAGNITUDE OF CONSTRUCTION
In accordance with FAR 36.204, the estimated magnitude of this construction project is between $25,000 and $250,000. This acquisition will be conducted using Simplified Acquisition Procedures under FAR Part 13.
4. SITE VISIT / PRE-PROPOSAL CONFERENCE
A formal site visit will be held. The exact date, time, and registration instructions for the site visit will be provided in the official solicitation when it is posted. Contractors are highly encouraged to attend to observe site conditions, conduit routing paths, and space constraints.
5. DISCLAIMER
THIS IS A PRE-SOLICITATION NOTICE ONLY. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). No solicitation document is currently available. All interested parties should monitor SAM.gov for the official solicitation, which will contain the full Statement of Work, applicable FAR/DFARS clauses, Davis-Bacon Wage Determinations, and instructions for quote submission. Do not submit quotes or proposals in response to this notice.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- SOW - CES Expasnsion Upgrade - DRAFT.pdf278 KB, July 8, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 8, 2026
Presolicitation
Due July 23, 2026 at 12:00 PM EDT. SAM.gov, notice 3b20bcf4dc514d6ea4c9bfca8d2c494b
3 revisions on SAM
- July 8, 2026: publish, presolicitation
- July 8, 2026: publish, presolicitation
- July 8, 2026: publish, presolicitation
July 8, 2026
Presolicitation
Due July 28, 2026 at 12:00 PM EDT. SAM.gov, notice 3de10448859c4d0089cc05e8db658c54
3 revisions on SAM
- July 8, 2026: publish, presolicitation
- July 8, 2026: publish, presolicitation
- July 8, 2026: publish, presolicitation
July 8, 2026
Presolicitation
Due July 23, 2026 at 12:00 PM EDT. SAM.gov, notice 716fe69f442a47bd853d0c56fd3cc7fc
4 revisions on SAM
- July 8, 2026: publish, presolicitation
- July 27, 2026: publish, solicitation
- July 8, 2026: publish, presolicitation
- July 8, 2026: publish, presolicitation
Points of contact
- Lawrence Romanglawrence.j.romang.civ@army.mil2177613462