# CES Expansion UPS Upgrade

Canonical: https://sealedbidder.com/opportunities/038315

- Solicitation number: 038315
- Notice type: Presolicitation
- Status: Closed. Deadline was July 23, 2026 at 12:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W7M6 Uspfo Activity Il Arng (W91SMC)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Y1AZ Construction Of Other Administrative Facilities And Service Buildings
- Set-aside: Total small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236220)
- Place of performance: Springfield, Illinois
- County: Sangamon County (FIPS 17167). https://sealedbidder.com/counties/sangamon-county-il-17167
- City: Springfield. https://sealedbidder.com/cities/springfield-il-1772000
- First posted: July 8, 2026
- Last posted: July 8, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/716fe69f442a47bd853d0c56fd3cc7fc/view

## Reading this notice

- Kind of notice: Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates.
- What comes next: No solicitation has been published under this number yet. The presolicitation of July 8, 2026 is the earliest notice of the purchase.

## Description

Estimated Solicitation posting - Last week of July

Estimated Site Visit - First week of August (usually a Tuesday or Thursday, 1pm).

A Draft Statement of Work (SOW) is attached to this notice for planning and market research purposes only. Do not submit formal quotes at this time.

1. PROJECT DESCRIPTION

The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8.

The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system.

Key scope items include:

	Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard.

	Site and electrical preparation for the new system.

	Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion).

	Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings.

	Full system adjustments, load balancing, and operational testing by factory-trained field service personnel.

Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP).

2. BRAND NAME OR EQUAL

This requirement will be solicited as "Brand Name or Equal" for a system similar to the Vertiv Liebert Model APM2 with modular and scalable architecture. The forthcoming solicitation will explicitly list the salient characteristics that any proposed "equal" equipment must meet to be considered acceptable.

3. MAGNITUDE OF CONSTRUCTION

In accordance with FAR 36.204, the estimated magnitude of this construction project is between $25,000 and $250,000. This acquisition will be conducted using Simplified Acquisition Procedures under FAR Part 13.

4. SITE VISIT / PRE-PROPOSAL CONFERENCE

A formal site visit will be held. The exact date, time, and registration instructions for the site visit will be provided in the official solicitation when it is posted. Contractors are highly encouraged to attend to observe site conditions, conduit routing paths, and space constraints.

5. DISCLAIMER

THIS IS A PRE-SOLICITATION NOTICE ONLY. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). No solicitation document is currently available. All interested parties should monitor SAM.gov for the official solicitation, which will contain the full Statement of Work, applicable FAR/DFARS clauses, Davis-Bacon Wage Determinations, and instructions for quote submission. Do not submit quotes or proposals in response to this notice.

## Attachments

- [SOW - CES Expasnsion Upgrade - DRAFT.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2fda98804c4f4b2b9f974dae6639f450/download)

## Open now in the same industry

188 open in NAICS 236220.

- Repair Building Systems (Peoria, IL) (1232SA27Q0003), due December 2, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/1232sa27q0003
- 550-20-121 Demo Old Boiler Plant B100 (CON) (36C25227B0002-0001), due December 2, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/36c25227b00020001
- Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade (385515GMK), due December 9, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/385515gmk

## Publications

- July 8, 2026: Presolicitation, due July 23, 2026 at 12:00 PM EDT. Notice 3b20bcf4dc514d6ea4c9bfca8d2c494b. https://sam.gov/workspace/contract/opp/3b20bcf4dc514d6ea4c9bfca8d2c494b/view
- July 8, 2026: Presolicitation, due July 28, 2026 at 12:00 PM EDT. Notice 3de10448859c4d0089cc05e8db658c54. https://sam.gov/workspace/contract/opp/3de10448859c4d0089cc05e8db658c54/view
- July 8, 2026: Presolicitation, due July 23, 2026 at 12:00 PM EDT. Notice 716fe69f442a47bd853d0c56fd3cc7fc. https://sam.gov/workspace/contract/opp/716fe69f442a47bd853d0c56fd3cc7fc/view

## Points of contact

- Lawrence Romang, lawrence.j.romang.civ@army.mil, 2177613462

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/038315.
