# Port Graham Development Corporation

Canonical: https://sealedbidder.com/vendors/port-graham-development-corporation-nahnhcecqlb8

- UEI: NAHNHCECQLB8
- CAGE: 3ZNJ2
- Location: Palmer, AK
- Awards in window: 25 (48 transactions), $3,635,500 obligated, January 30, 2024 to September 11, 2026

## Awarding agencies

- Federal Aviation Administration: 22 awards, $1,917,176
- Bureau of Indian Affairs and Bureau of Indian Education: 1 awards, $1,718,324
- Federal Acquisition Service: 1 awards, $0
- Department of Energy: 1 awards, $0

## Industries

- 238210 Electrical Contractors and Other Wiring Installation Contractors: $1,917,176
- 517410 Satellite Telecommunications: $1,718,324
- 237130 Power and Communication Line and Related Structures Construction: $0
- 541511 Custom Computer Programming Services: $0

## Competition

- Full and Open Competition: 23 awards
- Competed Under SAP: 2 awards

## Solicitations won

- Satellite Radio Services for OJS LMR (140A1624Q0063), $2,951,506. https://sealedbidder.com/opportunities/140a1624q0063

## Largest awards

- 140A1624C0010 (definitive contract): $1,718,324, Bureau of Indian Affairs. Satellite Radio Service for Ojs LMR. https://www.usaspending.gov/award/CONT_AWD_140A1624C0010_1450_-NONE-_-NONE-/
- 6973GH24F01221 (delivery order): $153,292, 6973GH Franchise Acquisition SVCS. Bil Funds. Construction Cost of Ups and the Ups Ancillary Equipment Removal and Installation at the Kirksville, Mo (Irk) Arsr Per the RFQ-24-21 Bid Package. JCN:18060881. https://www.usaspending.gov/award/CONT_AWD_6973GH24F01221_6920_6973GH22D00013_6920/
- 6973GH26F00169 (delivery order): $103,944, 6973GH Franchise Acquisition SVCS. Iija Funded. Slidell, La (Sil) Arsr JCN:26000506 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Slidell, La (Sil) Arsr Which Includes a Full Power Systems Study of the Facility.. https://www.usaspending.gov/award/CONT_AWD_6973GH26F00169_6920_6973GH22D00013_6920/
- 6973GH26F00484 (delivery order): $103,759, 6973GH Franchise Acquisition SVCS. This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Coopersville, Mi (Cpv) Arsr Which Includes a Full Power Systems Study of the Facility. Jcn: 21000077. https://www.usaspending.gov/award/CONT_AWD_6973GH26F00484_6920_6973GH22D00013_6920/
- 6973GH26F01391 (delivery order): $100,841, 6973GH Franchise Acquisition SVCS. Iija Funded / GCK Arsr, Garden City KS / Jcn: 21002954 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Garden City, KS (Gck) Arsr Which Includes a Full Power Systems Study of the. https://www.usaspending.gov/award/CONT_AWD_6973GH26F01391_6920_6973GH22D00013_6920/
- 6973GH24F00393 (delivery order): $98,670, 6973GH Franchise Acquisition SVCS. Ups Installation. JCN:18065273 Loc: Dca Tdwr, Washington Dc. Construction Cost of Ups and Ups Ancillary Equipment Removal and Installation at Washington, DC Per RFQ-24-07 Bid Package, Which Includes Full Arc Flash Hazard Analysis (Afha) of the Fac. https://www.usaspending.gov/award/CONT_AWD_6973GH24F00393_6920_6973GH22D00013_6920/
- 6973GH24F01138 (delivery order): $97,605, 6973GH Franchise Acquisition SVCS. Bil Funds. Construction Cost of Ups and the Ups Ancillary Equipment Removal and Installation at the Dallas, Tx, (Dfwa) Asr Per the RFQ-24-18 Bid Package. JCN:22004412 Includes Option #1 Full Arc Flash Hazard Analysis (Afha) of the Facility.. https://www.usaspending.gov/award/CONT_AWD_6973GH24F01138_6920_6973GH22D00013_6920/
- 6973GH25F01406 (delivery order): $93,858, 6973GH Franchise Acquisition SVCS. Iija Funded. Freeland, Mi (Mbs) Asr JCN:18066401 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Freeland, Mi (Mbs) Asr Which Includes a Full Power Systems Study of the Facility.. https://www.usaspending.gov/award/CONT_AWD_6973GH25F01406_6920_6973GH22D00013_6920/
- 6973GH25F00962 (delivery order): $93,801, 6973GH Franchise Acquisition SVCS. Iija Funded. Rochester, MN (Rstb) Asr Jcn: 24010113 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Rochester, MN (Rstb) Asr, Which Includes a Full Power Systems Study of the Faci. https://www.usaspending.gov/award/CONT_AWD_6973GH25F00962_6920_6973GH22D00013_6920/
- 6973GH25F00963 (delivery order): $93,789, 6973GH Franchise Acquisition SVCS. Iija Funded. Muskegon, Mi (Mkge) Asr Jcn: 22007976 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Muskegon, Mi (Mkge) Asr, Which Includes a Full Power Systems Study of the Facili. https://www.usaspending.gov/award/CONT_AWD_6973GH25F00963_6920_6973GH22D00013_6920/
- 6973GH24F00324 (delivery order): $93,170, 6973GH Franchise Acquisition SVCS. Bil Ups Installation. JCN:18066525, Loc: Pit Tdwr, Pittsburgh Pa. Construction Cost of Ups and Ups Ancillary Equipment Removal and Installation at Pittsburgh, PA Per RFQ 24-06 Bid Package. Includes Option #1 Full Arc Flash Hazard Analysis (Afha) of. https://www.usaspending.gov/award/CONT_AWD_6973GH24F00324_6920_6973GH22D00013_6920/
- 6973GH25F00961 (delivery order): $92,866, 6973GH Franchise Acquisition SVCS. Iija Funded. Flint, Mi (Fnt) Asr Jcn: 19005396 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Flint, Mi (Fnt) Asr, Which Includes a Full Power Systems Study of the Facility.. https://www.usaspending.gov/award/CONT_AWD_6973GH25F00961_6920_6973GH22D00013_6920/
- 6973GH26F00016 (delivery order): $92,478, 6973GH Franchise Acquisition SVCS. Iija Funded. Citronelle, Al (Qrb) Arsr JCN:18066545 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Citronelle, Al (Qrb) Arsr Which Includes a Full Power Systems Study of the Fac. https://www.usaspending.gov/award/CONT_AWD_6973GH26F00016_6920_6973GH22D00013_6920/
- 6973GH26F00673 (delivery order): $92,052, 6973GH Franchise Acquisition SVCS. Iija Funded. Ashburn, Ga (Qhn) Arsr JCN:20008134 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Ashburn, Ga (Qhn) Arsr.. https://www.usaspending.gov/award/CONT_AWD_6973GH26F00673_6920_6973GH22D00013_6920/
- 6973GH24F00391 (delivery order): $90,904, 6973GH Franchise Acquisition SVCS. Bil Ups Installation. JCN:22004515, Loc: Iadb Pcs, Leesburg Va. Construction Cost of Ups and Ups Ancillary Equipment Removal and Installation at Leesburg, VA Per RFQ-24-07 Bid Package. Package Includes the Full Arc Flash Hazard Analysis (Afha) of TH. https://www.usaspending.gov/award/CONT_AWD_6973GH24F00391_6920_6973GH22D00013_6920/
- 6973GH26F01065 (delivery order): $89,978, 6973GH Franchise Acquisition SVCS. Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Allentown, PA (Abe) Asr Which Includes a Full Power Systems Study of the Facility. Jcn: 1703575. https://www.usaspending.gov/award/CONT_AWD_6973GH26F01065_6920_6973GH22D00013_6920/
- 6973GH25F00094 (delivery order): $88,338, 6973GH Franchise Acquisition SVCS. Bil Funds. Construction Cost of Ups and the Ups Ancillary Equipment Removal and Installation at the Gulfport, MS (Gpt) Asr Per the RFQ-24-25 Bid Package. Jcn: 18066536 Includes Option #1 Full Arc Flash Hazard Analysis (Afha) of the Facility.. https://www.usaspending.gov/award/CONT_AWD_6973GH25F00094_6920_6973GH22D00013_6920/
- 6973GH26F00741 (delivery order): $87,171, 6973GH Franchise Acquisition SVCS. This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Dansville, Ny (Dsv) Arsr. JCN:21002667. https://www.usaspending.gov/award/CONT_AWD_6973GH26F00741_6920_6973GH22D00013_6920/
- 6973GH24F01375 (delivery order): $81,721, 6973GH Franchise Acquisition SVCS. Bil Funds. Construction Cost of Ups and the Ups Ancillary Equipment Removal and Installation at the Roswell, NM (Row) Asr Per the RFQ-24-23 Bid Package. Jcn: 24010109 Includes Option #1 Full Arc Flash Hazard Analysis (Afha) of the Facility.. https://www.usaspending.gov/award/CONT_AWD_6973GH24F01375_6920_6973GH22D00013_6920/
- 6973GH26F00168 (delivery order): $80,443, 6973GH Franchise Acquisition SVCS. Iija Funded. Kansas City, Mo (Mci) Atct Jcn: 26000505 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Kansas City, Mo (Mci) Atct Which Includes a Full Power Systems Study of the. https://www.usaspending.gov/award/CONT_AWD_6973GH26F00168_6920_6973GH22D00013_6920/
- 6973GH26F01295 (delivery order): $79,899, 6973GH Franchise Acquisition SVCS. Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Cleveland, Oh (Clea) Asr Which Includes a Full Power Systems Study of the Facility. Jcn: 21002951. https://www.usaspending.gov/award/CONT_AWD_6973GH26F01295_6920_6973GH22D00013_6920/
- 6973GH22F01546 (delivery order): $8,596, 6973GH Franchise Acquisition SVCS. Bil Funds. Costs Incurred for Remobilization and Labor Due to FAA Delay of the Project Located at the Denver, Co, DEN1 Tdwr. Jcn: 18062234. https://www.usaspending.gov/award/CONT_AWD_6973GH22F01546_6920_6973GH22D00013_6920/
- 6973GH22D00013: $0, 6973GH Franchise Acquisition SVCS. Incorporate Latest Davis Bacon Wage Determinations. https://www.usaspending.gov/award/CONT_IDV_6973GH22D00013_6920/
- 89503621DSW000005: $0, Southwestern Power Administration. Indefinite Delivery/Indefinite Quantity (Idiq) Contract for General Communication Site Tower Maintenance. https://www.usaspending.gov/award/CONT_IDV_89503621DSW000005_8900/
- GS35F0436Y: $0, Gsa/Fas Center for IT Schedule Prog. Federal Supply Schedule Contract. https://www.usaspending.gov/award/CONT_IDV_GS35F0436Y_4732/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://sealedbidder.com/vendors/port-graham-development-corporation-nahnhcecqlb8.
