# Nehemiah Construction LLC

Canonical: https://sealedbidder.com/vendors/nehemiah-construction-llc-rptqcth9fj93

- UEI: RPTQCTH9FJ93
- CAGE: 7T3X5
- Location: Barboursville, WV
- Awards in window: 7 (16 transactions), $11,182,687 obligated, February 22, 2024 to November 9, 2026

## Awarding agencies

- Forest Service: 3 awards, $7,158,820
- National Park Service: 4 awards, $4,023,867

## Industries

- 237990 Other Heavy and Civil Engineering Construction: $10,561,930
- 237310 Highway, Street, and Bridge Construction: $470,905
- 238990 All Other Specialty Trade Contractors: $73,645
- 237110 Water and Sewer Line and Related Structures Construction: $52,317
- 238290 Other Building Equipment Contractors: $23,890

## Competition

- Full and Open Competition After Exclusion of Sources: 5 awards
- Competed Under SAP: 1 awards
- Not Competed: 1 awards

## Solicitations won

- Trail Replacement @ INDU (140P6426B0002), $3,427,000. https://sealedbidder.com/opportunities/140p6426b0002
- GAOA Historic Guinavah-Malibu Campground and Amphitheatre Reconstruction (1240LS25R0002), $4,766,843. https://sealedbidder.com/opportunities/1240ls25r0002
- REPAIR DLC LIFT STATION (140P6325Q0021), $44,867. https://sealedbidder.com/opportunities/140p6325q0021
- Box Culvert Installation (140P6425B0002), $458,750. https://sealedbidder.com/opportunities/140p6425b0002
- Fence Replacement (140P6424Q0012), $73,645. https://sealedbidder.com/opportunities/140p6424q0012
- Pump House Stabilization (1240LT24Q0020), $23,890. https://sealedbidder.com/opportunities/1240lt24q0020

## Largest awards

- 1240LS25C0004 (definitive contract): $6,994,920, Usda-Fs, Csa Intermountain 7. Gaoa Historic Guinavah-Malibu CCC Campground & Amphitheatre Reconstruction. Includes Award of the Base, West Side, East Side, Asphalt, Amphitheater (Including Pavilion, Pad, Electrical and Furnishings), Interpretive Trail, and 4 Pavilion Pads. https://www.usaspending.gov/award/CONT_AWD_1240LS25C0004_12C2_-NONE-_-NONE-/
- 140P6426C0010 (definitive contract): $3,427,000, MWR Ohio. Eo 14398 - Construction, Trail Replacement @ Indu. https://www.usaspending.gov/award/CONT_AWD_140P6426C0010_1443_-NONE-_-NONE-/
- 140P6425C0005 (definitive contract): $470,905, MWR Ohio. Construction - Box Culvert Installation. https://www.usaspending.gov/award/CONT_AWD_140P6425C0005_1443_-NONE-_-NONE-/
- 1240LS22C0005 (definitive contract): $140,010, Usda-Fs, Csa Intermountain 7. Gaoa-Uwc-Silver Lake Boardwalk Replacement Mod 8: the Purpose of This Bilateral Modification Is to Add Additional Costs Associated with Helical Pier Extensions Needed to Finish the Project. No Other Changes Are Being Made at This Time. Mod. https://www.usaspending.gov/award/CONT_AWD_1240LS22C0005_12C2_-NONE-_-NONE-/
- 140P6424C0002 (definitive contract): $73,645, MWR Ohio. Other Construction, Fence Replacement. https://www.usaspending.gov/award/CONT_AWD_140P6424C0002_1443_-NONE-_-NONE-/
- 140P6325P0015 (purchase order): $52,317, MWR Nekota. This Is an Urgent and Compelling Construction Services Requirement to Repair Lift Station Located in Indiana Dunes National Park.. https://www.usaspending.gov/award/CONT_AWD_140P6325P0015_1443_-NONE-_-NONE-/
- 1240LT24P0011 (purchase order): $23,890, Usda-Fs, Csa Intermountain 8. Pump House Stabilization. https://www.usaspending.gov/award/CONT_AWD_1240LT24P0011_12C2_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://sealedbidder.com/vendors/nehemiah-construction-llc-rptqcth9fj93.
