# N.K. Bhandari, Architecture & Engineering, P.C.

Canonical: https://sealedbidder.com/vendors/n-k-bhandari-architecture-and-engineering-p-c-wudxf35lumn6

- UEI: WUDXF35LUMN6
- CAGE: 02ZY8
- Parent: N.K. Bhandari, Architecture & Engineering, P.C
- Location: Syracuse, NY
- Awards in window: 91 (293 transactions), $14,954,335 obligated, January 2, 2024 to November 23, 2026

## Awarding agencies

- Public Buildings Service: 69 awards, $13,451,098
- Department of the Air Force: 21 awards, $1,503,238
- U.S. Fish and Wildlife Service: 1 awards, $0

## Industries

- 541310 Architectural Services: $13,110,840
- 541330 Engineering Services: $1,843,495

## Competition

- Full and Open Competition After Exclusion of Sources: 89 awards
- Not Competed Under SAP: 1 awards
- Not Competed: 1 awards

## Solicitations won

- Notice of Intent to Sole Source—A/E Services for the revision to Issued for Construction (IFC) Drawings and Post Construction Award Services (PCAS) for B10 Vivarium Air Control Valves in Building 64. (47PM1125C0012). https://sealedbidder.com/opportunities/47pm1125c0012
- Notice of Intent to Sole Source—AE Management and Inspection (M&I) Services for the 3rd & 4th Floor Laboratories (47PM1125C0006). https://sealedbidder.com/opportunities/47pm1125c0006

## Largest awards

- 47PJ0023F0061 (delivery order): $2,469,968, PBS R8 Acquisition Management Division. Ira Acquisition and Installation of Emerging and Sustainable Technologies Clin 0005, Geothermal Wells Slin Aa Will Increase a Total of $94,467.08 from $0.00 to $94,467.08, Firm Fixed-Price.. https://www.usaspending.gov/award/CONT_AWD_47PJ0023F0061_4740_GS07P16UCD7008_4740/
- 47PC0224F0044 (delivery order): $1,742,201, PBS R2 Repair and Alterations Branch. AE Services for the Tab Cares Act Ventilation Verification Program at Various GSA Buildings Within Region 2.. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0044_4740_47PC0321D0004_4740/
- 47PC0221F0080 (delivery order): $851,519, PBS R2 Repair and Alterations Branch. CBP Imf JFK Vault Office and Operational Floor Renovations AE Services. https://www.usaspending.gov/award/CONT_AWD_47PC0221F0080_4740_GS07P16UCD7008_4740/
- 47PC0225F0034 (delivery order): $747,444, PBS R2 Repair and Alterations Branch. AE Design Services - HVAC Repairs at Ron De Lugo Federal Office Building, Saint Thomas, Usvi.. https://www.usaspending.gov/award/CONT_AWD_47PC0225F0034_4740_47PC0321D0004_4740/
- 47PC0224F0028 (delivery order): $679,122, PBS R2 Repair and Alterations Branch. Charles L. Brieant Federal Courthouse Fire Alarm Replacement-Design, Located at 300 Quarropas Street, White Plains, Ny 10601. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0028_4740_47PC0321D0004_4740/
- FA875125F0068 (delivery order): $623,549, FA8751 AFRL Riko. The Architect/Engineer (A/E) Firm Shall Perform AE Design Services for C-Suas Airfield Facility, Stockbridge Test Annex in Accordance with the Statement of Work and Contractor Proposal.. https://www.usaspending.gov/award/CONT_AWD_FA875125F0068_9700_FA875122D0001_9700/
- 47PC0224F0036 (delivery order): $495,720, PBS R2 Repair and Alterations Branch. A/E Services for the Elevators Modernization Project at Ron De Lugo Fob & U.S. Courthouse in St. Thomas, Usvi.. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0036_4740_47PC0321D0004_4740/
- 47PC0224F0072 (delivery order): $477,402, PBS R2 Repair and Alterations Branch. Roosevelt Courthouse Front Entrance Hardening Design, 225 Cadman Plaza East. Pop: 8/14/24 - 09/30/2025. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0072_4740_47PC0321D0004_4740/
- 47PC0225F0014 (delivery order): $377,897, PBS R2 Repair and Alterations Branch. A/E Hardening Design Project at Charles Brieant Usch, 300 Quarropas ST White Plains, Ny. https://www.usaspending.gov/award/CONT_AWD_47PC0225F0014_4740_47PC0321D0004_4740/
- 47PB5126F0022 (delivery order): $369,827, PBS Project Delivery Capital Construction - Branch Northeast. The Purpose of This Award Is to Provide AE Services for the Foley Courthouse Envelope Repairs, Newark, Nj.. https://www.usaspending.gov/award/CONT_AWD_47PB5126F0022_4740_47PC0321D0004_4740/
- 47PC0225F0028 (delivery order): $358,110, PBS R2 Repair and Alterations Branch. A/E Services for the MLK Courthouse Hardening Design Project at the MLK Courthouse in Newark, New Jersey.. https://www.usaspending.gov/award/CONT_AWD_47PC0225F0028_4740_47PC0321D0004_4740/
- 47PC5526F0614 (delivery order): $343,252, PBS Project Delivery East - Branch E. 47PC5526F0614 - Duberstein Priority 2&3 Facade Repairs. https://www.usaspending.gov/award/CONT_AWD_47PC5526F0614_4740_47PC0321D0004_4740/
- 47PC5526F0568 (delivery order): $339,688, PBS Project Delivery East - Branch E. Award of Task Order 47PC5526F0568 - Duberstein Basement Repairs - Design at the Conrad Duberstein U.S. Bankruptcy Courthouse in Brooklyn, New York.. https://www.usaspending.gov/award/CONT_AWD_47PC5526F0568_4740_47PC0321D0004_4740/
- 47PC0225F0042 (delivery order): $327,595, PBS R2 Repair and Alterations Branch. A/E Design Services for Ahus Replacement Project at Jose V. Toledo Federal Building and U.S. Courthouse in San Juan, Pr.. https://www.usaspending.gov/award/CONT_AWD_47PC0225F0042_4740_47PC0321D0004_4740/
- 47PC5326F0351 (delivery order): $292,388, PBS Project Delivery East - Branch C. AE Design Services for the Vehicle Security Barriers for the Ron De Lugo FB & Usch in St. Thomas, Usvi and the Almeric Christian FB & Usch in St. Croix, Usvi.. https://www.usaspending.gov/award/CONT_AWD_47PC5326F0351_4740_47PC0321D0004_4740/
- FA875124F0026 (delivery order): $280,618, FA8751 AFRL Riko. Repair DFAS Building 1, North. https://www.usaspending.gov/award/CONT_AWD_FA875124F0026_9700_FA875122D0001_9700/
- 47PC0224F0025 (delivery order): $276,757, PBS R2 Repair and Alterations Branch. AE Services for the Roof Repairs Project at the Almeric Christian Fob & U.S. Courthouse in St. Croix, U.S. Virgin Islands.. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0025_4740_47PC0321D0004_4740/
- 47PC0225F0037 (delivery order): $251,358, PBS R2 Repair and Alterations Branch. Electrical Equipment Study Located at 26 Federal Plaza & 1 Federal Plaza New York, Ny 10278.. https://www.usaspending.gov/award/CONT_AWD_47PC0225F0037_4740_47PC0321D0004_4740/
- 47PC0224F0024 (delivery order): $246,362, PBS R2 Repair and Alterations Branch. Region 2 Courthouse Hardening Predesign Services. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0024_4740_47PC0321D0004_4740/
- 47PC0324F0001 (delivery order): $217,105, PBS R2 Capital Construction Branch. Add 52 Weeks M&i Services. https://www.usaspending.gov/award/CONT_AWD_47PC0324F0001_4740_47PC0321D0004_4740/
- 47PC0225F0048 (delivery order): $215,682, PBS R2 Repair and Alterations Branch. CBP Port Elizabeth First Floor Office Buildout. https://www.usaspending.gov/award/CONT_AWD_47PC0225F0048_4740_47PC0321D0004_4740/
- 47PC5326F0230 (delivery order): $207,011, PBS Project Delivery East - Branch C. M & I Services for Binghamton 1ST FL Buildout.. https://www.usaspending.gov/award/CONT_AWD_47PC5326F0230_4740_47PC0321D0004_4740/
- 47PC0224F0061 (delivery order): $185,466, PBS R2 Repair and Alterations Branch. This Project Is for the Design and Management and Inspection Services of the Jury Assembly Room Renovations as Described by the Sow for the Keating Chambers 2530 Design and AE Management and Inspection Project.. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0061_4740_47PC0321D0004_4740/
- 47PM1125C0012 (definitive contract): $176,753, PBS R11 Special Programs FDA 80 Branch. AE Services for the Revision to Ifc and Pcas Documentation for B10 Vivarium Air Valves at FDA White Oak in Silver Spring, Md.. https://www.usaspending.gov/award/CONT_AWD_47PM1125C0012_4740_-NONE-_-NONE-/
- 47PC0225F0011 (delivery order): $166,179, PBS R2 Repair and Alterations Branch. The Award for the Keating Hardening Phase Ii- Design Project Located in Rochester, Ny for the Total of $166,178.95 Is for the Work Described in the Sow Dated 11/21/24. the Period of Performance Completion Date Is 7/30/25.. https://www.usaspending.gov/award/CONT_AWD_47PC0225F0011_4740_47PC0321D0004_4740/
- 47PM1125C0006 (definitive contract): $163,505, PBS R11 Special Programs FDA 80 Branch. A-E M and I Services for the 3RD and 4TH Floor Labs Renovation College Park, MD. https://www.usaspending.gov/award/CONT_AWD_47PM1125C0006_4740_-NONE-_-NONE-/
- 47PC0223F0001 (delivery order): $156,600, PBS R2 Repair and Alterations Branch. Equitable Adjustment Related to Supplemental Weekly Meetings. https://www.usaspending.gov/award/CONT_AWD_47PC0223F0001_4740_47PC0321D0004_4740/
- 47PC0224F0058 (delivery order): $151,985, PBS R2 Repair and Alterations Branch. The General Services Administration Intends to Award for A/E Services to Conduct Surveys and Investigation Reports to Evaluate the Structural Conditions in the Basement of the Duberstein Courthouse Located at 301 Cadman Plaza E, Brooklyn, Ny 11201.. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0058_4740_47PC0321D0004_4740/
- FA875126F0017 (delivery order): $148,845, FA8751 AFRL Riko. The Architect/Engineer (A/E) Firm Shall Perform Design Services to Repair and Renovate Suite C140, B106 for a Server Facility, and Follow on Title II Services in Accordance with the Statement of Work.. https://www.usaspending.gov/award/CONT_AWD_FA875126F0017_9700_FA875122D0001_9700/
- 47PC5126F0310 (delivery order): $145,237, PBS Project Delivery East - Branch a. Rodino Elevator Shaft Repairs in Newark NJ. https://www.usaspending.gov/award/CONT_AWD_47PC5126F0310_4740_47PC0321D0004_4740/
- 47PC0225F0016 (delivery order): $128,180, PBS R2 Repair and Alterations Branch. Lautenberg - Chambers 411 - Design - Newark, NJ. https://www.usaspending.gov/award/CONT_AWD_47PC0225F0016_4740_47PC0321D0004_4740/
- FA875126F0004 (delivery order): $127,450, FA8751 AFRL Riko. The Architect/Engineer (A/E) Firm Shall Perform AE Design Services for C-Suas Airfield Facility, Stockbridge Test Annex in Accordance with the Statement of Work and Contractor Proposal.. https://www.usaspending.gov/award/CONT_AWD_FA875126F0004_9700_FA875122D0001_9700/
- 47PB5126F0004 (delivery order): $125,981, PBS Project Delivery Capital Construction - Branch Northeast. Per the R2 AE IDIQ Contract #47PC0321D0004 Requirements, Provide A/E Services Including: Pccs, A/E (M&i), and Other Professional Services as Needed to Investigate, Identify, and Resolve Issues Within and Around the Physical Property and Leased Spaces. https://www.usaspending.gov/award/CONT_AWD_47PB5126F0004_4740_47PC0321D0004_4740/
- 47PC0224F0055 (delivery order): $125,010, PBS R2 Repair and Alterations Branch. This Contract Award for the Massena Virtra Facility Lpoe- Design Project Is a Total of $125,010.26 to NKB with the Period of Performance Completion Date of 7/16/24.. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0055_4740_47PC0321D0004_4740/
- 47PC0222F0051 (delivery order): $118,610, PBS R2 Repair and Alterations Branch. The No Cost Time Extension Mod for the Aerial Walkway Bridge Repairs & Replacement Project in Albany, Ny Is to Extend the Period of Performance Completion Date from 1/26/24 to 3/07/24 and the Estimated Ultimate Completion from 1/15/25 to 3/31/24.. https://www.usaspending.gov/award/CONT_AWD_47PC0222F0051_4740_47PC0321D0004_4740/
- 47PC0225F0013 (delivery order): $115,728, PBS R2 Repair and Alterations Branch. The Hanley VBA 5TH Floor- Design Award in the Amount of $99,758.87 for the Work Described in the Sow Dated 8/02/24 Located in Syracuse, Ny Was Awarded to Nkb. the Pop Completion Date Is 9/2/25.. https://www.usaspending.gov/award/CONT_AWD_47PC0225F0013_4740_47PC0321D0004_4740/
- 47PC0325F0007 (delivery order): $112,919, PBS R2 Capital Construction Branch. The Purpose of This Award Is to Provide A/E Services for Degetau Phase II Study, Hato Rey, Pr.. https://www.usaspending.gov/award/CONT_AWD_47PC0325F0007_4740_47PC0321D0004_4740/
- 47PC0224F0042 (delivery order): $96,491, PBS R2 Repair and Alterations Branch. The Contract Is for the Keating Federal Building (Ny0304zz) Hardening Phase II Pre-Design Project. the Contractor Will Provide All Labor, Material, Equipment, and Supervision to Perform the Work Per Sow Dated 1/22/2024.. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0042_4740_47PC0321D0004_4740/
- 47PC0223F0035 (delivery order): $86,354, PBS R2 Repair and Alterations Branch. The Purpose of This Modification Is to Incorporate the Attached Statement of Work Dated 4/24/24. This Modification Increases the Award Total from $174,060.70 to $182,382.92. All Other Terms and Conditions Remain the Same.. https://www.usaspending.gov/award/CONT_AWD_47PC0223F0035_4740_47PC0321D0004_4740/
- 47PC0125F0218 (delivery order): $81,671, PBS R2 Simplified Acquisitions Branch (2PQB) Group 3. Domestic Water System Study at Ron De Lugo Building. https://www.usaspending.gov/award/CONT_AWD_47PC0125F0218_4740_47PC0321D0004_4740/
- 47PC5326F0336 (delivery order): $80,141, PBS Project Delivery East - Branch C. The Award the the Hanley VBA 5TH Floor- AE M&i Project for the Work Described in the Sow Dated 5/28/26 in the Amount of the $80,140.67 Located in the James M. Hanley Federal Building Goes to Nkb. the Pop Is from 8/31/26 to 7/29/27.. https://www.usaspending.gov/award/CONT_AWD_47PC5326F0336_4740_47PC0321D0004_4740/
- 47PC0124F0178 (delivery order): $79,211, PBS R2 Simplified Acquisitions Branch (2PQB) Group 3. Keating 5TH Floor Office Refresh. https://www.usaspending.gov/award/CONT_AWD_47PC0124F0178_4740_47PC0321D0004_4740/
- FA875126F0018 (delivery order): $72,559, FA8751 AFRL Riko. AE Service for Repair Exterior Siding B1. https://www.usaspending.gov/award/CONT_AWD_FA875126F0018_9700_FA875122D0001_9700/
- 47PC0224F0082 (delivery order): $60,967, PBS R2 Repair and Alterations Branch. A/E Investigative/Pre-Design (Base Work) and Management and Inspection (Option) in Accordance with the Requirements Listed in the A/E Statement of Work (Sow) Revision 1 Dated July 15, 2024.. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0082_4740_47PC0321D0004_4740/
- FA875126F0008 (delivery order): $53,831, FA8751 AFRL Riko. AE Service for Maintain Towers.. https://www.usaspending.gov/award/CONT_AWD_FA875126F0008_9700_FA875122D0001_9700/
- 47PC5526F0572 (delivery order): $52,733, PBS Project Delivery East - Branch E. Award of Task Order 47PC5526F0572 for the Celler Water Infiltration Study in Brooklyn, New York.. https://www.usaspending.gov/award/CONT_AWD_47PC5526F0572_4740_47PC0321D0004_4740/
- 47PC0225F0010 (delivery order): $49,996, PBS R2 Repair and Alterations Branch. A/E Design & Electrical Changes to Usbp Space at Keating Federal Building, 100 State St, Rochester, Ny 14614. Pop: 70 Days. https://www.usaspending.gov/award/CONT_AWD_47PC0225F0010_4740_47PC0321D0004_4740/
- 47PC0224F0071 (delivery order): $47,112, PBS R2 Repair and Alterations Branch. The Award for the Keating HVAC Replacement- AE M&i Services Contract to NKB for the Amount of $47,111.92 Will Begin Once the Construction Contract'S Notice to Proceed Is Issued. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0071_4740_47PC0321D0004_4740/
- 47PC5526F0064 (delivery order): $45,570, PBS Project Delivery East - Branch E. M&i Services for the Cit Red Glass. https://www.usaspending.gov/award/CONT_AWD_47PC5526F0064_4740_47PC0321D0004_4740/
- 47PC0521F0080 (delivery order): $42,603, PBS R2 Repair and Alterations Branch. DCMA Binghamton Consolidation Project - Design Additional Services. https://www.usaspending.gov/award/CONT_AWD_47PC0521F0080_4740_GS07P16UCD7008_4740/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://sealedbidder.com/vendors/n-k-bhandari-architecture-and-engineering-p-c-wudxf35lumn6.
