# Lockheed Martin Corporation

Canonical: https://sealedbidder.com/vendors/lockheed-martin-corporation-hdhvq4ef8a89

- UEI: HDHVQ4EF8A89
- CAGE: 65113
- Parent: Lockheed Martin Corp.
- Location: Palo Alto, CA
- Awards in window: 16 (181 transactions), $725,967,445 obligated, January 3, 2024 to November 19, 2026

## Awarding agencies

- National Oceanic and Atmospheric Administration: 1 awards, $489,927,931
- National Aeronautics and Space Administration: 10 awards, $219,698,728
- Department of the Navy: 2 awards, $11,930,891
- Defense Advanced Research Projects Agency: 1 awards, $3,957,921
- Department of the Air Force: 1 awards, $451,974
- Department of the Army: 1 awards, $0

## Industries

- 336411 Aircraft Manufacturing: $489,927,931
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology): $195,261,102
- 541710 Professional, Scientific, and Technical Services: $14,922,672
- 541712 Professional, Scientific, and Technical Services: $14,803,141
- 541330 Engineering Services: $7,682,500
- 336419 Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing: $3,300,003
- 541512 Computer Systems Design Services: $70,096

## Competition

- Full and Open Competition: 10 awards
- Not Competed: 5 awards
- Full and Open Competition After Exclusion of Sources: 1 awards

## Solicitations won

- Neutron Spectrometer System (NSS) Units for MoonFall and CLPS Mission 8 (80ARC027P0001), $4,663,726. https://sealedbidder.com/opportunities/80arc027p0001
- KILLERWHALE (FA875024CB057), $1,503,873. https://sealedbidder.com/opportunities/fa875024cb057
- Request for Proposal_NOAA C-130J Aircraft Production (1305M224RNMAN0230), $847,242,597. https://sealedbidder.com/opportunities/1305m224rnman0230

## Largest awards

- 1305M224C0039 (definitive contract): $489,927,931, Department of Commerce NOAA. Noaa/Omao_production of Up to Four (4) Fully Modified C130J Aircraft. https://www.usaspending.gov/award/CONT_AWD_1305M224C0039_1330_-NONE-_-NONE-/
- 80GSFC21C0011 (definitive contract): $164,394,561, NASA Goddard Space Flight Center. Multi-Slit Solar Explorer (Muse) Mission Phase a. https://www.usaspending.gov/award/CONT_AWD_80GSFC21C0011_8000_-NONE-_-NONE-/
- NNG09FA40C (definitive contract): $14,803,141, NASA Goddard Space Flight Center. Interface Region Imaging Spectrograph (Iris). the Contractor Shall Refine and Evolve the Contractor'S Cost Estimate for Phases B-F for the Interface Region Imaging Spectrograph (Iris) Mission Submitted in Response to NASA Announcement of Opportunity #nnh07zda003o for the Explorers Projects Division. the Primary Tasks in Phase B Will Include the Generation and Presentation of the Systems Requirements Review (Srr) and the Preliminary Design Review (Pdr). in Order to Support These Reviews, the Concept Definition Efforts Shall Encompass the Work Required to Update and Refine the Proposal'S Science Investigation Objectives and Plans (If Necessary), Instrument and Spacecraft Concepts and Performance Characteristics, and Science Operations and Flight Operations Plans and Concepts. These Efforts Shall Identify the Conditions and Constraints Necessary for the Development of an Integrated Iris Mission Approach. the Contractor'S Mission Integration Efforts Shall Include Considerations for the Accommodation of the Iris Observatory Onto the Launch Vehicle. the Contractor'S Phase B Preliminary Design Efforts Shall Develop the CSR and Site Visit Concepts Into a Preliminary Design and Definition of the Iris Mission, Including Its Mission Operations Center (Moc) and Science Operations Center (Soc). the Preliminary Design Review (Pdr) Shall Be Held in Accordance with NPR 7120.5D, NPR 7123.1A, and GSFC STD 1001B. the Contractor'S Efforts in Phase B Shall Form the Basis for Final Ation of the Remainder of the Iris Development and Operational Phases (C, D, E and F). Detailed Cost and Schedule Estimates Shall Be Prepared and Submitted During Phase B, Which Defines the Contractor'S Updated Budget for Phase B and the Planned Budgets for Phase C, D, E and F Work. Periodic Technical and Programmatic Interchange Meetings at Both the Contractor'S Facility and at GSFC Shall Be Required to Coordinate Efforts Between the Contractor and the Explorers Projects Office. These May Be Conducted as Face-To-Face Meetings or Teleconferences, as Required.. https://www.usaspending.gov/award/CONT_AWD_NNG09FA40C_8000_-NONE-_-NONE-/
- N0017322C6001 (definitive contract): $11,860,795, Naval Research Laboratory. Euvst - Phase B. https://www.usaspending.gov/award/CONT_AWD_N0017322C6001_9700_-NONE-_-NONE-/
- 80GSFC26C0015 (definitive contract): $9,836,427, NASA Goddard Space Flight Center. Habitable Worlds Observatory System Technology Demonstrations and Mission Architecture Studies. https://www.usaspending.gov/award/CONT_AWD_80GSFC26C0015_8000_-NONE-_-NONE-/
- NNG04EA00C (definitive contract): $9,826,348, NASA Goddard Space Flight Center. The Atmospheric Image Assembly for the NASA Solar Dynamics Observatory. https://www.usaspending.gov/award/CONT_AWD_NNG04EA00C_8000_-NONE-_-NONE-/
- NNM07AA01C (definitive contract): $5,387,338, NASA Marshall Space Flight Center. Hinode (Formerly Known as Solar B Phase E)--Focal Plane Package Mission Operations and Data Analysis. the Hinode Program Is a Continuation of a Joint "international" Venture Between the United States, Great Britain and Japan to Advance Our Understan. https://www.usaspending.gov/award/CONT_AWD_NNM07AA01C_8000_-NONE-_-NONE-/
- 80MSFC24CA015 (definitive contract): $4,759,424, NASA Marshall Space Flight Center. Technology Maturation for Astrophysics Space Telescopes (Techmast). https://www.usaspending.gov/award/CONT_AWD_80MSFC24CA015_8000_-NONE-_-NONE-/
- NNG08HZ00C (definitive contract): $4,641,000, NASA Goddard Space Flight Center. Geostationary Lightning Mapper (Glm) Instrument the for Geostationary Operational Environmental Satellites (Goes) R. the Contractor Shall Provide the Personnel, Materials, Facilities and Other Resources to Design, Develop, Deliver (To the Designated Destination) and Support Under the Basic Contract: A) Parts and Materials for an Engineering Development Unit (Edu) and 4 Flight Models B) One GLM Engineering Development Unit (Edu) C) One GLM Proto-Flight Model (Pfm) Designated Flight Model-1 (FM-1) D) Three Sets of the Electrical System Test Equipment (Este) E) Two GLM Emulators (Glme) F) Two Flight Software Development Environments (Fsdes) G) One Ground Processing Demonstration System (Gpds) H) Spares for the Four FMS I) All Additional GLM Mechanical and Electrical Ground Support Equipment (Mgse and Egse) Called Out Elsewhere in This Document J) All Items and Documents Specified in All Contract Documents. https://www.usaspending.gov/award/CONT_AWD_NNG08HZ00C_8000_-NONE-_-NONE-/
- HR001124C0453 (definitive contract): $3,957,921, Def Advanced Research Projects Agcy. Space Wireless On-Demand Optical Power (Swoop). https://www.usaspending.gov/award/CONT_AWD_HR001124C0453_9700_-NONE-_-NONE-/
- 80ARC027P0001 (purchase order): $3,300,003, NASA Ames Research Center. Fabricate Nine Units, with One of the Nine NSS Units Fabricated Using Viper NSS Spare Parts. All Units Will Be Fabricated Per the Previous NSS Etus, with Identical Form, Fit, Function with Limited Testing to Verify Function Prior to Delivery.. https://www.usaspending.gov/award/CONT_AWD_80ARC027P0001_8000_-NONE-_-NONE-/
- NNG07HW20C (definitive contract): $3,041,500, NASA Goddard Space Flight Center. Solar Ultraviolet Imager (Suvi) Instrument. This Contract Is for the Design, Analyze, Develop, Fabricate, Integrate, Test, Evaluate and Support Launch of the Solar Ultraviolet Imager (Suvi) Instrument, Supply and Maintain the Instrument Ground Support Equipment (Gse), and Support the Satellite Operations Control Center (Socc). the Suvi Is Classified as a Non-Primary Instrument on the Goes-R Satellite and Has a Risk Classification of B. the Suvi Instrument Provides a Broadband Imaging in the Extreme Ultraviolet Wavelength Range to Monitor the Entire Dynamic Range of Solar Features, from Coronal Holes to Flares, as Well as the Estimate of Temperature and Emission Measure. These Data Are Used for Geomagnetic Storm Forecasts and Forecasts of Solar Energetic Particle Events Related to Flares. the Contractor Shall Provide the Personnel, Materials, Facilities and Other Resources to Design, Develop, Deliver and Support Under the Basic Contract: A) Parts and Materials for 4 Flight Models B) One Suvi Flight Model (Fm) C) Three Sets of the Electrical System Test Equipment (Este) D) Two Suvi Emulators (Suvies) E) Two Flight Software Development Environments (Fsdes) F) One Ground Processing Development System (Gpds) G) Spares for the Four FMS H) All Additional Suvi Mechanical and Electrical Ground Support Equipment (Mgse and Egse) Called Out Elsewhere in This Document I) All Items and Documents Specified in All Contract Documents. https://www.usaspending.gov/award/CONT_AWD_NNG07HW20C_8000_-NONE-_-NONE-/
- FA875024CB057 (definitive contract): $451,974, FA8750 AFRL Rik. Killerwhale. https://www.usaspending.gov/award/CONT_AWD_FA875024CB057_9700_-NONE-_-NONE-/
- N0024425PS064 (purchase order): $70,096, NAVSUP FLT Log CTR San Diego. The Spacecraft Research and Design Center (Srdc) Requires Technical Support to Investigate Methods to Advance the State-Of-The-Art in Applications of AI for Hel Automatic Targeting, Aimpoint Selection and Maintenance, and Beam Control.. https://www.usaspending.gov/award/CONT_AWD_N0024425PS064_9700_-NONE-_-NONE-/
- W911QY18D0099: $0, W6QK ACC-APG Natick. Acws Clause Added and CS Name Updated.. https://www.usaspending.gov/award/CONT_IDV_W911QY18D0099_9700/
- GSFC0199708DNAS597181 (definitive contract): -$291,014, NASA Goddard Space Flight Center. Solar X-Ray Imager Instrument. https://www.usaspending.gov/award/CONT_AWD_GSFC0199708DNAS597181_8000_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://sealedbidder.com/vendors/lockheed-martin-corporation-hdhvq4ef8a89.
